Tom’s Creek Foot-Bridge

Slides:



Advertisements
Similar presentations
Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Adobe Upper Reach 5 Conceptual Plan Issues December 9, 2003 Workshop.
Advertisements

Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
Office of University Partnerships Office of Policy Development and Research U.S. Department of Housing and Urban Development Office of University Partnerships.
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Getting Caltrans to Approve Your Plans Basic Drainage Policies and Requirements Roy H. King, MS,PE California Department of Transportation Division of.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1.
International Competitive Strategy Chapter 13. International Strategy Why is it important? Why is it important? International Strategy International Strategy.
IS-700.A: National Incident Management System, An Introduction
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
Upper Brushy Creek Water Control & Improvement District
Visual 5.1 Planning Process Army Delivery Unit 5: Planning Process.
1 Introduction to Engineering Second Semester Overview Agenda Team Assignments and Information Exchange Course Overview.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Cornell University Storm Water Utility Presentation to the Water Resources Council --- November 17, 2014.
FEMA FLOOD INSURANCE STUDY UPDATES City Council Workshop July 7, 2008.
Presenter’s Name June 17, Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
McClain County Multi- Jurisdictional Multi-Hazard Mitigation Plan Update Image from
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
1 Floodplain Management SESSION 1 Course prepared by: Bob Freitag, CFM (Project Course Developer) Donald R. Reichmuth, PhD (Stream Systems) Susan Bolton,
Unit: P81 Unit P8 Public Works/Utilities Services Orientation.
Chapter 19: “Writing Instructions and Manuals” Matthew Frase.
WUT - Spring, 2007Assignment: Project Proposals1 Assignment: Project Proposals Define development projects.
Federal Emergency Management Agency Documentation Preparation.
THE 19th BIENNIAL DISTINGUISHED BUILDING AWARDS PROGRAM
Session 2. revision of Handbooks, manuals and guidelines
Gladewood Bridge Summary: Built in 1920 Crosses the Yellow Creek
Health Capital Technical Topics
Health Capital Technical Topics
HCS 455 EDU Inspiring Minds/hcs455edu.com
Safeguards- Feedback on Safeguards ED-2 and Task Force Proposals
Joe Bellini, Exelon Drew Miller Exelon April 6, 2012
Module 8 Prepare management procedures
Documentation Overview
NRS 433V Competitive Success-- snaptutorial.com
HCS 455 EDU Perfect Education/ hcs455edu.com.
HCS 455 TUTORS Perfect Education/ hcs455tutors.com.
HCS 455 Education for Service-- tutorialrank.com
Terms of Reference for the Near-Earth Object Threat Mitigation
WG 2.B Integrated River Basin Management
City of Kingfisher: Using Historic Flooding to Quantify Damages
THE ROLE OF THE PLANSET IN CONTRACT DOCUMENTS
Budget Summary Use of General Fund Balance Total Revenues
Involuntary Resettlement 0P 4.12: Planning Instruments
Peacekeeping and Stability Operations Institute
Professional Skepticism and Professional Judgment
White Paper – Least Cost Electricity Procurement
Assignment Workshop 2 16th September 09, Solihull.
FEMA and Stream Restoration
CVTS 2015 – Draft Commission Regulation amending Regulation (EC) No 198/2006 Agenda item 2.2 DSS Meeting 3-4 April 2014.
Strategic Planning Process
Network Assigned Upstream-label
FY18 Water Use Data and Research Program Q & A Session
Strategic Planning Process
General Plan Amendment & Zone Change Timeline
2016 AES – Draft Commission Regulation implementing Regulation (EC) No 452/2008 Agenda item 2.3 DSS Meeting 3-4 April 2014.
Academic Freedom & Standards Committee
Open Letter - Summary of Responses
Water Scarcity & Droughts Policy in the EU Gap Analysis
Informal document GRSG
Unit 4: Implementing an Operational Planning Process
Enterprise Certificates DRAFT
[Ballot code, contract number] [Project title]
[Ballot code, contract number] [Project title]
Unit 4: Implementing an Operational Planning Process
SOM14 14th Senior Officials’ Meeting December 2018 Manila, Philippines
Shaver Creek Permitting
Service Requests New Proposal CSA Service Requests AA Service Requests
Presentation transcript:

Tom’s Creek Foot-Bridge Final Exercise Tom’s Creek Foot-Bridge

Instructions Scenario: Previous PO started PW but then rotated out You have, scenario information, draft PW, FIRM, and photos As a class we will show photos next

Taken by applicant morning following storm near high water Taken by applicant morning following storm near high water. April 2, 2003

Overview of bridge from downstream.

Marker found on bridge

Bridge pier (upstream view) Bridge pier (upstream view). Applicant already has replaced stone in boxed area. Debris still in channel.

Washed out area downstream of bridge abutment.

Utilities on upstream side of bridge.

Assignment Determine appropriate mitigation measure Obtain mitigation costs from instructors Revise PW as needed Complete Special Considerations Questions Prepare Hazard Mitigation Proposal.

Class Summary 406 Regulations & Policies General Principles Hazards - Forces Involved - Mitigation Cost Effectiveness Other Considerations Document Preparation

Technical Feasibility Other Considerations Cost-Effectiveness Technical Feasibility Eligible Project