Daniel Suter Unknown Data Center Somewhere, USA

Slides:



Advertisements
Similar presentations
Construction Method, Material Selection & Building Services
Advertisements

Wilkes-Barre/Scranton International Airport Avoca, PA Adam G. Weis Construction Management Option 2006 Senior Thesis Presentation.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Pennsylvania State Employees Credit Union Corporate Headquarters Senior Thesis Presentation | lighting / electrical | Sarah Wujcik | | Dr Houser.
The Pennsylvania State University Department of Architectural Engineering Harrisburg University Academic Center Laurel Heather Warner Construction Management.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management © Elkus Manfredi Architects Franklin & Marshall College.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
TYPICAL member spot checks & alternate systems design study
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Paul Roberts Senior Thesis 2010 Construction Management.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskey’s Senior Thesis The Pennsylvania State University Architectural.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Introduction 120,000 SF 10 Stories (90ft) $40 Million Aug – Dec.2011 Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Andrew Diehl, EIT The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project.
Pearl Condominiums Philadelphia, PA
Introduction James W. & Frances G. McGlothlin Medical Education Center
Council Rock High School South
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Ryan Johnson - Structural Option
LONGWOOD AT OAKMONT HEALTHCARE CENTER
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
AMBRIDGE AREA HIGH SCHOOL
the Franklin Square Hospital Center
Justin Pennycoff AE Senior Thesis 2008 Construction Management
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Wellington Condominiums Project
Architectural Engineering, The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
The Calvert Hall High School College Project
RiverView Condominiums II Chicago, IL
Presentation transcript:

Daniel Suter Unknown Data Center Somewhere, USA 4.12.2011 Construction Management AE Senior Thesis Presentation The Pennsylvania State University

Daniel Suter | Construction Management | 4.12.2011 Agenda Unknown Data Center Somewhere, USA Project Overview Analysis One: Alternate Roof Systems Electrical Breadth Analysis Two: Façade Redesign Structural Breadth Analysis Three: Tablet PC’s Conclusions Questions Daniel Suter | Construction Management | 4.12.2011 2

Daniel Suter | Construction Management | 4.12.2011 Agenda Unknown Data Center Somewhere, USA PROJECT OVERVIEW Project Overview Analysis One: Alternate Roof Systems Electrical Breadth Analysis Two: Façade Redesign Structural Breadth Analysis Three: Tablet PC’s Conclusions Questions Owner Anonymous Occupancy Type Business Size 17,445 SF Cost $ 50 Million (Design+Construction) Construction Duration December 2008 – August 2010 Delivery Method Design-Bid-Build Daniel Suter | Construction Management | 4.12.2011 3

ANALYSIS ONE – Alternate Roof System Agenda Unknown Data Center Somewhere, USA ANALYSIS ONE – Alternate Roof System Opportunity The Data Center’s roof construction primarily constructed with EPDM fully adhered to concrete slab on deck.  On top of the EPDM is interlocking insulation board covered with UV protection fabric and is topped off with interlocking concrete pavers. This type of roof was selected for sound isolation purposes. The primary problem is that the owner is not utilizing the opportunity to implement green/solar roofing systems to increase to performance of his/hers building. In addition, the current roof constructed includes various amounts of materials and two different trades to construct this roof type. Objective The expected outcomes from this analysis will conclude that a PV panel roofing system will be more beneficial to the owner because of the type of building it is. The effects on duration and cost will be affected in a negative way, but the life cost cycle will make up for the longer duration and cost to the owner Project Overview Analysis One: Alternate Roof Systems Electrical Breadth Analysis Two: Façade Redesign Structural Breadth Analysis Three: Tablet PC’s Conclusions Questions Daniel Suter | Construction Management | 4.12.2011 4

Daniel Suter | Construction Management | 4.12.2011 Agenda Unknown Data Center Somewhere, USA Structural Breadth Project Overview Analysis One: Alternate Roof Systems Electrical Breadth Analysis Two: Façade Redesign Structural Breadth Analysis Three: Tablet PC’s Conclusions Questions Overview: In attempt to redesign the current architectural precast panels. This analysis will include redesigning the 20 foot parapet walls, while collaborating with the architect. Different size beams and columns may arise through the structural calculations that will be performed. 3D Model Insert Daniel Suter | Construction Management | 4.12.2011 5