Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005
40 GHz Survey of Candidate Site Site Engineering Solutions Objectives MSC/HLR BTS BSC OMC-R TCU
Site Construction and Preparation Design Contract signature Contract Consolidation Subscribers Forecast Preliminary Network Design Operations Site Acquisition & Zoning Installation & Commissioning Network Acceptance Network Integration Pilot Integration Testing In Service Systems & Network Integration Plans Systems & Network Design Detailed Consolidation Test Plans Detailed Engineering Manufacturing & Delivery TAS Radio & Site Survey Systems & Network Planning Microwave Clearing Systems Integration RF Verification Project Management & Network Design Authority Project Management & Field System Engineering Extension & Upgrade RF Optimization Network Optimization Performance Monitoring Cellular Network Engineering Process
Network Design and implementation strategy Detailed analysis and Field Preparation Network Optimization Pilot Network Roll out and in service Customer Info Gathering Measuring Equipment Bid Project System Design Contract Network Design Cell Planning Radio Freq. Qualif. Network (VO, Network Optimization Application Eng'g Site Survey Radio Survey Site Eng'g Roll Out (VO, Instal.) SS and SE Activities in the Network Roll-out
Site Surveys + Reports Site Engineering Site Preparation Aerial Verification RF Model Site Preparation Coordination Local Tests Cabinet Installation Site Document Site Preparation Accepted As Built Document Site Installation Acceptance Commissioning The Site Installation Process
Cell Planning BTS Zone of search The Site Specifications Scope and Goals
Ease of: Handling Installation Commissioning Equipment functioning Maintenance The Site Specifications Collected Information
General access Building access Unloading requirements BTS Room dimension requirements ? BTS + * x ? The Site Specifications Constraints Site Investigation Constraints
Cable trays Equipment Power Supply Lighting Grounding System Equipotentiality System Connection Requirements (RF signals, PCM, and others) Environmental constraints The Site Specifications Equipment Constraints
Floor # 2 DDF AC A U T H O R I Z A T I O N The Site Survey Constraints
Site ! Site Survey (questionnaire) Site Survey Report ?! Site Specifications The Site Survey Process Overview
Width Heigth Number of floors Depth Access? The Site Survey The Building Survey
GPS The Site Survey The Building Survey
Grounding System DDF location AC Power Tower BTS location B T S The Site Survey The Building Survey
Dimensions (raised floor, false ceiling, etc.) Location and dimensions of the existing equipment Location of BTS cabinet Location of power and grounding system Location of the DDF Location, dimensions, and availability of the cable trays Location, dimensions, and availability of the feeder input The Site Survey The BTS Room Survey
Weak current, feeder and alarm zone Strong current zone The Site Survey The BTS Room Survey
The Site Survey The Outdoor BTS Room Survey
X + Y + Z = 2 meters The Site Survey The Outdoor BTS Room Survey
The Site Survey The Outdoor BTS Room Survey
North direction in relation to the building and tower Location and orientation of the existing antennas Quantity, location and azimuth of the antennas Sector/azimuth Type of fixation Lightning protection system, existing or not The Site Survey The Aerial Survey
Tools Used During these Activities
Site Engineering activities Site Engg activities End of Presentation