Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005.

Slides:



Advertisements
Similar presentations
Excellence in Connectivity Solutions 1 Fiber Optics Division.
Advertisements

© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Submission doc.: IEEE 11-10/1033r0 July, 2011 Russ Markhovsky, InvisiTrack, Inc.Slide 1 Advantages of Location in Challenging Environments Date:
Introduction to Public Land Mobile Network (PLMN)
1 Introducing the Specifications of the Metro Ethernet Forum.
Nairobi, Kenya, 26 – 27July 2010 EMF MEASURING IN KENYA Derick simiyu khamali Compliance and Enforcement Officer Communications Commission of Kenya ITU-T.
1 Measuring ICT4D: ITUs Focus on Household and Individual Market, Economics & Finance Unit Telecommunication Development Bureau.
0 - 0.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Investment Com. GIC To Enrich Life Through Communication.
Power, Telecom, Mechanical and Lighting Systems Solutions
AT&T strives to provide a smooth and successful installation experience for our Customers. We will do all that we can to install your service on time and.
1 1st China RFID Benchmarking Test Forum & MOU Signing Ceremony Johnson Yim.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
An ISO 9001 certified We offer our services to a wide range of networks such as GSM, CDMA and UMTS networks We Sells SPY Cams & security Cameras We have.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v Determining Customer Requirements Cisco Unity Design ProcessPresales.
We use a comprehensive approach to reduce costs and increase efficiencies. TMR approaches every project with integrity, dedication, and creativity. We.
Behaviour and Design of Steel Structures Lecture 3 Conceptual design.
1 Comm-Tract Corp. Comm-Tract Corp. Carrier Support Services.
© 2010 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys.
REGULATIONS for SUPPLIES, EQUIPMENT, REAGENTS and TESTING JILL HOAG BS, SBB(ASCP) CQA(ASQ) AABB STAFF LEAD ASSESSOR 1.
HWg-Juno HW group is a manufacturer of IP-based sensors from Prague, Czech republic. HWg delivers remote monitoring & control solutions.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Premium services & technology is a leading technology service provider delivering IT solutions and Telecommunication services operating.
1 Philadelphia VA Medical Center University and Woodland Avenues A/E Emergency Generator Upgrade Building By: Nidhish Shah, PE, Arthur Armellini, PE &
What: Bringing the Latest Technology to Consumers in Washington 1 © 2014 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo and other marks.
COWs TRIDENT STRUCTURES PVT LTDWEBSITE :
RWE Solutions Austria 1 RWE Solutions Austria GmbH Traffic Solutions.
Source One Source One Network and Building Solutions.
© Copyright Planet Network International SOLUTIONS FOR ADDRESSING THE COMPLEX QoS CHALLENGE RPM SYSTEM Revolutionary QoS monitoring Tool for Telecom Regulators.
Altai Super WiFi Training WiFi Network Planning
Chapter 15 Radio Frequency Site Survey Fundamentals
1. 2 Executive Team Over 50 Years service to industry History of Service, Support, Solution and Satisfaction Dynamic Team Active in Industry Consortiums.
Baran Americas Telecommunication Division Statement of Capabilities.
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
Company Profile.
BAE SYSTEMS Overview of Systems Engineering at BAE SYSTEMS & ALENIA MARCONI SYSTEMS 8/10/2015/MS By Leigh Watton Friday 27th July 2001.
 The GSM network is divided into two systems. each of these systems are comprised of a number of functional units which are individual components of the.
AMMAR ENGINEERING SERVICES
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
NCGS: Positioning NC today and for the future! North Carolina Geodetic Survey Maintenance of a CORS/RTN infrastructure.
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
March 06, 2009 Presenting Innovative Indian Products for Telcos Stay Ahead in the Telecom Business Company: ConnectM Technology Solutions Pvt. Ltd Address:
Mobile Technologies Introduction Basics of GSM Value Added Services SMS Short Codes Asterisk * LBS.
AquaRET 2 LEONARDO DA VINCI - Transfer of Innovation AquaRET 2 Online Survey results Bilbao, 05/10/2010 E. Mavrou Environmental Scientist, MSc CRES - Greece.
Site Construction & Installation Services
The Single, Most Comprehensive, User Friendly Network & Site Deployment Tracking Tool in the Industry Today. CARAWAY COMMUNICATIONS, INC.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Design, Construction and Implementation of a Statewide Real Time Kinematic GPS Network John A. Ray Administrator Office of Aerial Engineering Ohio Department.
COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection.
AT&T Managed Internet Service (MIS) with Ethernet Customer Site Preparation Document This document addresses Customer sites that do not have AT&T fiber.
Sniffer for Detecting Lost Mobiles
For : PRABHAT DAIRY LIMITED. BIGMARK MEDIA DIGITAL MARKETING PROPOSAL.
Committed to connecting the world Overview of ITU-T SG5 Work on Damage protection and safety Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group.
Task T6.2 Tertiary Buildings infrastructures installations
CERN Mobile network migration
Enterprise Wireless Solutions
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
Extension SR1 WP3 Electrical installations
Company Overview Big Green Group® (“BGG”) is led by President and CEO Michael A. Dennis. BGG is headquartered in New Jersey and its business operations.
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
GIS “PLANNING ORIENTED” FOR SMALL AND RURAL UTILITIES.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
CONTENTS Documentation Improvements Roadmap Update Records
IEC COLLEGE OF ENGG. & TECH.
Presentation transcript:

Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005

40 GHz Survey of Candidate Site Site Engineering Solutions Objectives MSC/HLR BTS BSC OMC-R TCU

Site Construction and Preparation Design Contract signature Contract Consolidation Subscribers Forecast Preliminary Network Design Operations Site Acquisition & Zoning Installation & Commissioning Network Acceptance Network Integration Pilot Integration Testing In Service Systems & Network Integration Plans Systems & Network Design Detailed Consolidation Test Plans Detailed Engineering Manufacturing & Delivery TAS Radio & Site Survey Systems & Network Planning Microwave Clearing Systems Integration RF Verification Project Management & Network Design Authority Project Management & Field System Engineering Extension & Upgrade RF Optimization Network Optimization Performance Monitoring Cellular Network Engineering Process

Network Design and implementation strategy Detailed analysis and Field Preparation Network Optimization Pilot Network Roll out and in service Customer Info Gathering Measuring Equipment Bid Project System Design Contract Network Design Cell Planning Radio Freq. Qualif. Network (VO, Network Optimization Application Eng'g Site Survey Radio Survey Site Eng'g Roll Out (VO, Instal.) SS and SE Activities in the Network Roll-out

Site Surveys + Reports Site Engineering Site Preparation Aerial Verification RF Model Site Preparation Coordination Local Tests Cabinet Installation Site Document Site Preparation Accepted As Built Document Site Installation Acceptance Commissioning The Site Installation Process

Cell Planning BTS Zone of search The Site Specifications Scope and Goals

Ease of: Handling Installation Commissioning Equipment functioning Maintenance The Site Specifications Collected Information

General access Building access Unloading requirements BTS Room dimension requirements ? BTS + * x ? The Site Specifications Constraints Site Investigation Constraints

Cable trays Equipment Power Supply Lighting Grounding System Equipotentiality System Connection Requirements (RF signals, PCM, and others) Environmental constraints The Site Specifications Equipment Constraints

Floor # 2 DDF AC A U T H O R I Z A T I O N The Site Survey Constraints

Site ! Site Survey (questionnaire) Site Survey Report ?! Site Specifications The Site Survey Process Overview

Width Heigth Number of floors Depth Access? The Site Survey The Building Survey

GPS The Site Survey The Building Survey

Grounding System DDF location AC Power Tower BTS location B T S The Site Survey The Building Survey

Dimensions (raised floor, false ceiling, etc.) Location and dimensions of the existing equipment Location of BTS cabinet Location of power and grounding system Location of the DDF Location, dimensions, and availability of the cable trays Location, dimensions, and availability of the feeder input The Site Survey The BTS Room Survey

Weak current, feeder and alarm zone Strong current zone The Site Survey The BTS Room Survey

The Site Survey The Outdoor BTS Room Survey

X + Y + Z = 2 meters The Site Survey The Outdoor BTS Room Survey

The Site Survey The Outdoor BTS Room Survey

North direction in relation to the building and tower Location and orientation of the existing antennas Quantity, location and azimuth of the antennas Sector/azimuth Type of fixation Lightning protection system, existing or not The Site Survey The Aerial Survey

Tools Used During these Activities

Site Engineering activities Site Engg activities End of Presentation