Kick-Off Meeting “One BAT” KTI Nr DCPP-NM

Slides:



Advertisements
Similar presentations
What is a Fuel Cell? Quite simply, a fuel cell is a device that converts chemical energy into electrical energy, water, and heat through electrochemical.
Advertisements

LONG: Laboratories Over Next Generation Networks. Project Description & WP1: Management.
2 Section.
Center for Advanced Materials University of Houston NASA Research Partnership Center CAM Solid Oxide Micro Fuel Cells: a Strategy for Efficient and Clean.
SINTEF Energy Research Power cycles with CO 2 capture – combining solide oxide fuel cells and gas turbines Dr. ing. Ola Maurstad.
WP 1: Fuel Cell Development 1 Strictly Confidential NMW Workpackage 1: Fuel Cell Development KTI Review Meeting,
WP 2: Gas Processing Unit 1 Strictly Confidential Workpackage 2: Gas Processing Unit KTI Review Meeting,
ONEBAT Meeting November 17, 2005 EPFL contribution Samuel Rey-Mermet, Paul Muralt.
WP 3: Thermal System Strictly Confidential 1 Workpackage 3: Thermal System Project Meeting, May 11, 2006.
1 Fuel Cells ME 252 Thermal-Fluid Systems G. Kallio.
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
1 Strictly Confidential NMW KTI Review Meeting: KTI Review Meeting, December 16, 2005 Anja Bieberle-Hütter,
PSU CS 106 Computing Fundamentals II Product Life Cycle & SW Product Life Cycle HM 9/3/2007.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
Commercial Database Applications Testing. Test Plan Testing Strategy Testing Planning Testing Design (covered in other modules) Unit Testing (covered.
NTB INTERSTATE UNIVERSITY OF APPLIED SCIENCES OF TECHNOLOGY BUCHS MNT INSTITUTE FOR MICRO AND NANOTECHNOLOGY Patrik Müller, Andres Bolleter, Aziz Ibzazene.
MOLTEN CARBONATE FUEL CELLS ANSALDO FUEL CELLS: Experience & Experimental results Filippo Parodi /Paolo Capobianco (Ansaldo Fuel Cells S.p.A.) Roma, 14th.
Intelligent Cargo in Efficient and Sustainable Global Logistics Operations WP5 – Open End-to-End Pilots Implementation Jose Gato Luis –
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
ThermoNeutronics, LLC featuring energy solutions for tomorrow… Generation III Integrated Energy Technologies Property of ThermoNeutronics, LLC.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
Integrated Micropower Generator
Performance-based Contracting and Maine’s State Personnel Development Grant (SPDG) Dawn Kliphan March 28, 2010.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
A study of Fe – substituted (La 0.8 Sr 0.2 ) 0.95 MnO 3-y as cathode material for solid oxide fuel cells B. N. Wani, Mrinal Pai, S.J. Patwe, S. Varma,
WP 5: Project Management & Industrial Liaison 1 Strictly Confidential NMW Workpackage 5: Project Management.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
SOLID OXIDE FUEL CELL BASED ON PROTON- CONDUCTING CERAMIC ELECTROLYTE* U. (Balu) Balachandran, T. H. Lee, and S. E. Dorris Argonne National Laboratory.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP5 Assembly and optimization of complete cell Iratxe de Meatza CEGASA STABLE kick-off meeting.
Integrated Micropower Generator Sossina Haile, David Goodwin, Caltech Steve Visco, Lutgard de Jonghe, Craig Jacobson, LBNL Scott Barnett, Northwestern.
Research Advances Towards Low Cost, High Efficiency PEM Electrolysis Dr. Katherine Ayers Presented by: Larry Moulthrop NHA 2010, Long Beach, CA.
Process for Review of 6 th Plan Supply Curves June 19, 2009 Lauren Gage
Fuel Cells. What is a Fuel Cell? Quite simply, a fuel cell is a device that converts chemical energy into electrical energy, water, and heat through electrochemical.
Doc.: IEEE /0147r0 Submission January 2012 Rolf de Vegt (Qualcomm)) Slide ai Spec Development Process Update Proposal Date:
DECC Framework Contract for Innovation Delivery Support – presentation to potential contractors Thursday 20 October.
PRESENTATION attached to the application for participation in the Competitive Selection dated_____________________ Innovation Project: […] Entity: […]
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
1MIL client logo to be positioned at the mark minimum height maximum size navigator Text Lines MIL Agenda.
1 st Consortium Management Team Meeting University of Belgrade 27 th -28 th November 2014 WP8 - Management Progress Presentation (month 1- 12) Prof. dr.
Kick Off Meeting Largs, Scotland
Skolkovo PRESENTATION
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
WG3 Flexible Generation
Date of download: 10/3/2017 Copyright © ASME. All rights reserved.
BENCH-CAN Internal evaluation 2nd semester
Final CALICE OsC meeting: Status and summary of project
Third PMC meeting University of Priština, Kosovska Mitrovica
Johann ZIRNGIBL CSTB / France
A Microcontroller Based Power Management System for Standalone Micro grids With Hybrid Power Supply 1.
WG3 Flexible Generation
CSP 25th November 2010 Technical agreement number 3: overview
Assessment of the Evaluation Culture
Contracting Officer Podcast Slides
WP1 – Smart City Energy Assessment and User Requirements
Integrated Micropower Generator
Subcontracting SBP 210 Lesson 1: Introduction
Date of download: 11/13/2017 Copyright © ASME. All rights reserved.
WG3 Flexible Generation
Highly Ionised Pulse Plasma Processes (HIPP processes) MP0804
Guidelines and Template for project oral presentation
Guidelines and Template for project oral presentation
Fuel Cells.
19th meeting of the WG GES 22/03/2018
The Electrochemical and Thermal Performances of Ca3Co4O9-δ as a cathode material for IT-SOFCs UCCS K. Nagasawaa, O. Mentreb, S. Daviero-Minaudb, N. Preuxb,
April 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report for Montreal, May 2009.
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Technology for smarter energy
Lesson 3.2 Product Planning
Presentation transcript:

Kick-Off Meeting “One BAT” KTI Nr. 7085.2 DCPP-NM ETH Hönggerberg, HCI G 541, April 14, 2005 Kick-Off Meeting “One BAT” KTI Nr. 7085.2 DCPP-NM Anja Bieberle-Hütter

Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch Modified Agenda 10.30 – 10.45 am Welcome and Introduction 10.45 – 11.30 am General Affairs and Project Overview 11.30 – 12.00 pm ZHW-CCP 12.00 – 12.30 pm EPFL-LC 12.30 – 1.00 pm ETHZ-NMW 1.00 – 2.00 pm Lunch 2.00 – 2.30 pm NTB-ImS 2.30 – 3.00 pm ETHZ-LTNT 3.00 – 3.30 pm Discussion about collaboration between the project partners 3.30 – 4.00 pm Potential Industrial Partners 4.00 – 4.15 pm Discussion and Other Business: - Next meetings: Date, Location - Feedback, Comments, Suggestions Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch Agenda 10.30 – 10.45 am Welcome and Introduction 10.45 – 11.30 am General Affairs and Project Overview 11.30 – 12.00 pm ZHW-CCP 12.00 – 12.30 pm EPFL-LC 12.30 – 1.00 pm ETHZ-NMW 1.00 – 2.00 pm Lunch 2.00 – 2.30 pm NTB-ImS 2.30 – 3.00 pm ETHZ-LTNT 3.00 – 3.30 pm Discussion about collaboration between the project partners 3.30 – 4.00 pm Potential Industrial Partners 4.00 – 4.15 pm Discussion and Other Business: - Next meetings: Date, Location - Feedback, Comments, Suggestions Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch General Overview Project One-BAT approved for 1 year CHF 798`500 (in 2 tranches) Conditions: IP strategy established Contracts signed and handed to KTI Battery expert from industry involved in the project Preparation of concurrence analysis Project review with KTI after 6 months ( 2. tranche): presentation of intermediate results presentation of possible business models (“Wertschöpfungskette”) concurrence analysis Considerable changes of the project (partner, plan, budget) have to be approved by KTI  information to Anja KTI has to be informed in time about patent application and issue of a patent Required statements in publications and public documents: “mitfinanziert durch die KTI” Signing of agreement for commercial utilization of project results (latest 3 months after project start), i.e. Framework and Coordination Agreement  done  done latest next week - Konkurrenzanalyse: p.19 im Vertrag  ongoing während des Projektes  done Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

New Features of KTI Discovery Projects Reports: 1. controlling report due after 3 months afterward: controlling reports every 6 months Final report at the end of the project “Umsetzungsplan” for project results (with final report) “Umsetzungsaudit” with KTI delegation (5-12 months after project end) new new new new Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Timetable: Project Start June 05 Alternative project start: May 05 Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch Meeting Organization One meeting about 3 weeks before controlling report or review:  4 meetings Location: 3 x ETH Zürich Hönggerberg, 1 x EPFL Lausanne ? Meeting minutes ( kick-off meeting: Anja) Slides of meetings available on NMW homepage: http://www.nonmet.mat.ethz.ch/research/OneBat each group sends slides (.ppt) to Daniel after the meeting each file will be password protected password: ktionebat Liste of co-workers available on NMW homepage Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch Financial: General CHF 798`500 for 12 months: CHF 768`500 for salary CHF 30`000 for further expenses CHF 170`000 from BFE ? (Dr. Hintermann) 1. tranche: CHF 400`000 for 6 months 2. tranche: after project review with KTI Payment to principal applicant (ETHZ)  form: “Auszahlungsbegehren” to download from NMW homepage: http://www.nonmet.mat.ethz.ch/research/OneBat Each group is responsible for ….. … collecting their original receipts and “Buchungsbelege” … spending the money in the anticipated time frame (unused money has to be returned after the project!) … completing their own financial report according to form: www.bbt.admin.ch/kti Final financial report collected by Anja due May 31, 2006 (project start June 05) Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch Financial: Year 1 Total for 12 months: CHF 798`500.00 (without BFE contribution so far) Further expenses Salary ETHZ-NMW CHF 4`500 CHF 328`500 EPFL-LC CHF 4`500 CHF 120`000 NTB-ImS CHF 13`500 CHF 140`000 ZHW-CCP CHF 3`000 CHF 80`000 ETHZ-LTNT CHF 4`500 CHF 100`000 CHF 30`000 CHF 768`500 Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Project Overview: 1 Year WP 1: Fuel Cell Development NMW, EPFL, NTB WP 2: Gas Processing Unit Development LTNT, NTB WP 3: Thermal System Management NTB, ZHW, NMW, EPFL, LTNT WP 4: Product Development  > year 3 Industrial Partner, all WP 5: Project Management CERION  WP, milestones, and deliverables have to be adjusted to 1 year project: 3, 6, 9, and 12 months Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

WP1: Fuel Cell Development WP 1.1: Electrolyte Fabrication and characterization of dense CGO by PVD (EPFL), spray pyrolysis and PLD (NMW) Fabrication and characterization of YSZ electrolytes by spray pyrolysis and PLD (NMW) Deposition on two substrates: Foturan and Si (NMW, EPFL) Membrane stress measurements as f(T, processing parameters) (EPFL) Milestones: Month 3: - dense and crack-free electrolyte with composition CGO 80/20 (NMW, EPFL) - conductivity @ 500°C-800°C in air characterized; s > 0.2 S/m @ 700°C in air (NMW, EPFL) - microstructure characterized (NMW, EPFL) Month 6: - electrical characterization of free standing membrane (NMW, EPFL) - stress measurements as input for PEN design optimization (EPFL) - YSZ electrolytes characterized (NMW) Month 9: - stress measurements of NMW sampes (EPFL) Month 12: - 1000 h degradation characterization (NMW) Deliverables: Month 6: - selected samples NMW  EPFL for stress measurements: dimensions: 4`` or 1 cm x 3 cm, substrate: Si or Foturan Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

WP1: Fuel Cell Development (continued) WP 1.2: Anode Fabrication and characterization of NiO-CGO (NMW, EPFL) Investigation of deposition parameters in order to obtain porous layers and good electrical conductivity (NMW, EPFL) Electrochemical characterization (NMW) Thermal stability (NMW, EPFL) Stress measurements (EPFL) Milestones: Month 3: - crack-free Ni-CGO films, s > 100 S/cm @ 600C, > 30% porosity in reduced state (NMW, EPFL) Month 6: - electrochemical characterization of NMW and EPFL films (NMW) - thermal stability and degradation f(T, t) (NMW, EPFL) - stress measurements (EPFL) Month 9: - stress measurements of NMW samples (EPFL) Month 12: - anode electrochemically characterized with overpotential < 0.4 Wcm2 @ 550°C (NMW) Deliverables: Month 3: - selected samples from EPFL  NMW for electrochemical characterization: dimensions to be specified by U. Mücke, substrate: YSZ polished bulk pellet (from NMW) Month 6: - selected samples from NMW  EPFL for stress measurements: dimensions: 4`` or 1 cm x 3 cm, substrate: Si or Foturan Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

WP1: Fuel Cell Development (continued) WP 1.2: Cathode Fabrication and characterization of LSCF (NMW, EPFL) Investigation of deposition parameters in order to obtain porous layers and good electrical conductivity (NMW, EPFL) Electrochemical characterization (NMW) Thermal stability (NMW, EPFL) Stress measurements (EPFL) Milestones: Month 3: - crack-free LSCF films, s > 100 S/cm @ 600C, > 20% porosity (NMW, EPFL) Month 6: - electrochemical characterization of NMW and EPFL films (NMW) - stress measurements (EPFL) Month 9: - stress measurements of NMW samples (EPFL) - thermal stability and degradation f(T, t) (NMW, EPFL) Month 12: - cathode electrochemically characterized with overpotential < 0.4 Wcm2 @ 550°C (NMW) Deliverables: Month 3: - selected samples from EPFL  NMW for electrochemical characterization: dimensions to be specified by D. Beckel, substrate: CGO polished bulk pellet (from NMW) Month 6: - selected samples from NMW  EPFL for stress measurements: dimensions: 4`` or 1 cm x 3 cm, substrate: Si or Foturan Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

WP1: Fuel Cell Development (continued) new WP 1.4 Microfabrication and Electrical Contacting Design of standard PEN including all microfabrication steps (NTB, NMW, EPFL) Design and fabrication of electrical contacts (NTB, EPFL) Microfabrication of PEN (NTB, EPFL) Integration of Ni grid  thermally more stable structures (EPFL) Milestones: Month 3: - design of standard PEN and of electrical contacts available (NTB, NMW, EPFL) - first microstructured PEN elements ready for testing (NTB, NMW, EPFL) - proof of concept for Ni grid (EPFL) Month 6: - re-design of PEN element and electrical contacting (NTB, NMW, EPFL) - Integration of Ni grid in process flow (EPFL) Month 12: - optimized, crack-free, stable microstructured PEN elements (NTB, NMW, EPFL) Deliverables: Month 3: - first microstructured PEN element NTB, EPFL  NMW for testing: dimensions to be specified by U. Mücke Month 6-12: - continuous supply of thin films and PEN elements for testing: NTB, NMW, EPFL Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

WP1: Fuel Cell Development (continued) WP 1.5 PEN Integration and Testing Development of test rig for PEN characterization (NMW) Integration and Characterization of PEN (NMW) Milestones: Month 3: - test rig for PEN characterization operating (NMW) Month 6: - first electochemical testing results of integrated PENs (NMW, EPFL, NTB) Month 9: - optimized electrochemical testing of PEN structures (NMW) Deliverables: Year 1 Milestone: integrated fuel cell performance 200 mW/cm2 @ 550°C with external electrical connections Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch WP2: GPU Development WP 2.1: Reformer Design and modelling of reformer: fuel preheating, different approaches of microscale fuel atomization, optimal microscale mixing of fuel and air, steam reforming – partial oxidation (LTNT) Catalytic material deposition in the micro-system (NTB) Development of process flows (NTB) Evaluation of design from processing point of view (NTB) Milestones: Month 3: - first reformer design available (LTNT) Month 6: - modelled and evaluated reformer based on 0.3 g/h butane in 2 cm3 with T max difference 50°C (reformer modelled for methane): effect of thermal conductivity of the reformer walls on the reformer process, microchannels coated with catalyst vs. porous catalyst (LTNT) Month 12: - reformer demonstrator with significant butane conversion rate @ 600°C and stable for feeds of 0.02 to 0.5 g/h butane incl. gas chromatography (fabrication: NBT, testing: LTNT) Deliverables: Month 3: - reformer design from LTNT  NTB for evaluation Month 6: - final reformer design from LTNT  NTB for fabrication - GPU = gas processing unit Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

WP2: GPU Development (continued) WP 2.2: Post-combustor Development and testing of post-combustor similar to reformer: T homogeneity, pressure drop, integration of Venturi nozzle checked in order to pump air through the fuel cell stack (LTNT) Catalytic material deposition in the micro-system (NTB) Development of process flows (NTB) Fabrication of test device (NTB) Milestones: Month 3: - first preliminary post-combustor design available Month 6: - improved designs of post-combustors aiming for 0.3 g/h butane feed, fully oxidized in 1 cm3 @ 600°C and max. pressure drop of 3 Pa (LTNT) Month 12: - first preliminary post-combustor demonstrator aiming for significant oxidation rate @ 600°C and stable for feeds of 0.02 to 0.5 g/h butane (fabrication: NBT, testing: LTNT) Deliverables: Month 6: - designs of post-combustor from LTNT  NTB for fabrication Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

WP2: GPU Development (continued) WP 2.3: Integration and Testing Development of test rig for GPU including gas chromatography (LTNT) Performance measurements: gas mixtures, cocking analysis, T distribution, pressure drop (LTNT) Milestones: Month 3: - design of test rig available (LTNT) Month 6: - test rig for reformer and post-combustor for GPU performance incl. gas chromatograph (LTNT) Month 9: - performance measurements of GPU (LTNT) Month 12: - delivery of first reformer and post-combustor designs aiming for compatibility with heat exchanger and hot module processing (LTNT) Deliverables: Month 3: - design from LTNT  NBT Month 6: - NTB samples  LTNT (Patrick checks whether possible in month 6) Addendum: Beginning of June: LTNT asks for data (NMW, EPFL) for thermodynamic modelling  perform exergy analysis of power plant Year 1 Milestone: Reformer with butane conversion rate > 90%: max. 600°C, 0.3 g/h feed, < 2 cm3, stable for 10 h First post-combustor with fuel exhaust gas oxidation > 98% aiming for: max. 600°C, 0.3 g/h feed, < 2 cm3, pressure drop < 2 Pa Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

WP3: Thermal System Management WP 3.1: Thermal System Design Design and modelling of several thermal insulation concepts with high efficiency (ZHW) Benchmarking with respect to m-SOFC systems (ZHW) Implementation of finite element models: heat exchanger, dynamic insulation, gas processing unit, fuel cell stack, interaction with the environment; mechanical analysis (ZHW) Optimization of design (NTB, LTNT, ZHW) Milestones: Month 3: - thermal insulation concept (Tinside = 550°C, Toutside = 50°C) (ZHW) Month 12: - system integration concept incl. thermal management concept heat exchanger design compatible with GPU designs and micro-fabrication (ZHW) Deliverables: Month 3: - design from ZHW  NTB for fabrication Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

WP3: Thermal System Management (cont.) WP 3.2 Fabrication Concept of Thermal System Validation of micro-fabrication processes (NTB) Design and implementation of test structures for critical properties to characterize the thermal situation (NTB) Investigation of manufacturing possibilities of highly efficient thermal insulation structures (NTB) Process development of first hot module (after designs of fuel cell stack, GPU, heat exchanger by modelling, production, testing (NTB) Fabrication and testing of selected designs in GPU test rig (NTB, LTNT) Measurement of hot module global performance (NTB) Milestones: Month 6: - test structures for validation of critical points of the concept (T diff. 500°C) (NTB) Month 9: - test results of first designs (LTNT) Month 12: - thermal system design demonstrator with simulated heat sources (dummy stack, reformer, post- combustor) (NTB) Deliverables: Month 6: - first samples of GPU from NTB  LTNT for testing Year 1 Milestone: Micro-fabricated hot module: < 10 cm3, thermal losses < 2 W, with real reformer and post-combustor data and simulated stack (1 W electrical at 30% efficiency), functioning with 0.3 g/h butane, 10 g/h air feed Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

WP5: Project Management WP 5.1: Industrial Collaboration (CERION) Contacting of companies regarding participation in the project Finding industrial battery expert for accompanying the project Milestones: Month 3: - List of potential companies for industrial collaboration - Contact to industrial battery expert established Month 6: First contacts with the evaluated industrial partners Month 12: Contacts with potential industrial partners interested in taking part in the project WP 5.2 Business Implementation (CERION) Setting-up of business model Elaboration of concurrence analysis Month 6: Presentation of possible business models and concurrence analysis Month 12: Cost analysis and added value scenarios in view of competing products Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

WP5: Project Management (continued) WP 5.3 Meetings and Reviews (CERION) Organisation of meetings: monitor development, check for achievements of milestones, overview of system development, WP progressing towards unified product Organisation of review meetings: Refine effort distribution between partners and definition of deliverables Milestones: Month 3: Meeting + Controlling Report Month 6: Meeting + Project Review with KTI Month 9: Meeting + Controlling Report Month 12: Meeting + Final Report + Financial Report Year 1 Milestone: Battery expert from industry is accompanying the project At least one industrial partner shows definite interest in joining the project (industrial partner has to be included in a subsequent project by joining plausible the value chain) Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch Signing of Contract Principal investigator (PI) of each group signs Each PI signs each contract  7 signatures Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch Agenda 10.30 – 10.45 am Welcome and Introduction 10.45 – 11.30 am General Affairs and Project Overview 11.30 – 12.00 pm ZHW-CCP 12.00 – 12.30 pm EPFL-LC 12.30 – 1.00 pm ETHZ-NMW 1.00 – 2.00 pm Lunch 2.00 – 2.30 pm NTB-ImS 2.30 – 3.00 pm ETHZ-LTNT 3.00 – 3.30 pm Discussion about collaboration between the project partners 3.30 – 4.00 pm Potential Industrial Partners 4.00 – 4.15 pm Discussion and Other Business: - Next meetings: Date, Location - Feedback, Comments, Suggestions Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch Agenda 10.30 – 10.45 am Welcome and Introduction 10.45 – 11.30 am General Affairs and Project Overview 11.30 – 12.00 pm ZHW-CCP 12.00 – 12.30 pm EPFL-LC 12.30 – 1.00 pm ETHZ-NMW 1.00 – 2.00 pm Lunch 2.00 – 2.30 pm NTB-ImS 2.30 – 3.00 pm ETHZ-LTNT 3.00 – 3.30 pm Discussion about collaboration between the project partners 3.30 – 4.00 pm Potential Industrial Partners 4.00 – 4.15 pm Discussion and Other Business: - Next meetings: Date, Location - Feedback, Comments, Suggestions Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Potential Industrial Partners Ideal Profile: Medium to large company (annual turn-over > 500 MCHF) Experienced with consumer products Possessing an extended distribution network Active in battery and/or portable electronic products Able of micro-systems mass production Market - replacement product - add on product System / Application - Handy - Laptop Processing Technology - Si semiconductor technology - MEMS technology - Thin film technology Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Potential Industrial Partners Potentially interesting candidates: ST Microelectronics Micronas Infineon EPCOS Siemens Nokia Motorola Toshiba ……. Candidates not fulfilling all criteria: Renata Leclanche UNAXIS Sulzer Metco Colibrys EM Marin SensoNor Sulzer HEXIS (declined) ……. Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Potential Industrial Battery Experts Ionity, D (Hans-Walter Praas)  contacts in the next few weeks Alternatives: Lithium Technology Corporation (LTC) USA, German partner: GAIA Emmerich Batterie, D ???? Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch Agenda 10.30 – 10.45 am Welcome and Introduction 10.45 – 11.30 am General Affairs and Project Overview 11.30 – 12.00 pm ZHW-CCP 12.00 – 12.30 pm EPFL-LC 12.30 – 1.00 pm ETHZ-NMW 1.00 – 2.00 pm Lunch 2.00 – 2.30 pm NTB-ImS 2.30 – 3.00 pm ETHZ-LTNT 3.00 – 3.30 pm Discussion about collaboration between the project partners 3.30 – 4.00 pm Potential Industrial Partners 4.00 – 4.15 pm Discussion and Other Business: - Next meetings: Date, Location - Feedback, Comments, Suggestions Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Next Meetings: Project Start June 05 1. Meeting cw 33: Thursday, August 11, 2005 ETHZ 2. Meeting cw 46: Thursday, November 17, 2005 ETHZ Project Review cw 50: Thursday, December 8, 2005 ETHZ 3. Meeting cw 06: Thursday, February 2, 2006 EPFL 4. Meeting cw 20: Thursday, May 11, 2006 ETHZ Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018

Feedback, Comments, Suggestions …. Presentations organized by WP and not by groups Reports: short and concise focused on new results, milestones, and deliverables refer to publications, internal reports, theses, patents, …. in English publications, internal reports, theses, patents on NMW homepage (send to Anja) Confirmation of invitation …. Anja Bieberle-Hütter, anja.bieberle@mat.ethz.ch http://www.nonmet.mat.ethz.ch/ 11/12/2018