Operating Experience in Spent Fuel Storage Casks T.Aida, T.Hara, Y.Kumano Tokyo Electric Power Company IAEA-CN-178/KN27 3 June 2010.

Slides:



Advertisements
Similar presentations
Welcome to Who Wants to be a Millionaire
Advertisements

New Reactors: NRC Plans, Process, and Progress David B. Matthews Director Division of New Reactor Licensing February 28, 2008.
Welcome to Who Wants to be a Millionaire
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
ENERGY UNIT: CALCULATING AND METERING ENERGY. CALCULATING ENERGY USE APES VERSION.

Fukushima Nuclear Disaster Moneer Aljawad, Abdulrahman Alshodokhi, Jericho Alves, Daniel Chief, Benjamin Kurtz, Travis Moore September 16, 2013.
Financial Education and Career Planning Review Quiz Unit-4 Credit and Credit Cards.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Opportunities and Challenges of Marketing FGD - Gypsum to Agriculture David Flack Marketing Director Ag Spectrum Company.
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
Energy Efficiency and Conservation Program Overview Taking the heat off the bottom line…
Nuclear Accident in Japan: A Summary
Capacity Planning For Products and Services
Chapter 5 Capacity Planning For Products and Services
Nuclear Energy Chapter 12. Introduction to the Nuclear Process Fission – nuclear energy released when atom split, conventional technology Fusion – nuclear.
JNFL and COGEMA : A wide and Innovative Cooperation in the fields of spent fuel reprocessing and MOX fuel fabrication Obninsk, 2004 July 1st JC. PIROUX.
Lithuanian concept for disposal of
Optimisation of New Build Spent Fuel Management and Disposal Peter Haslam Public Policy Advisor Nuclear Industry Association 25 January 2011.
Equal or Not. Equal or Not
1 Technical Meeting on Managing the Development of a National Infrastructure for Nuclear Power SECURITY STATUS IN CHILE Mauricio Lichtemberg Chilean Nuclear.
Adam H. Levin AHL Consulting May 14, BWR – Boiling Water Reactor DOE – Department of Energy DSC – Dry Storage Canister ISF – Interim Storage Facility.
New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
1 ARN Nuclear Regulatory Authority International Conference on Management of Spent Fuel from Nuclear Power Reactors 31 May - 4 June 2010, Vienna Austria.
International Conference for Spent Fuel Management from Nuclear Power Reactor Session 7 “Technological Innovations for Spent Fuel Storage” Meet the.
NUCLEAR ENERGY What is it? David J. Diamond Energy Sciences & Technology Department February 2009.
Indian strategy for management of spent fuel from Nuclear Power Reactors S.Basu, India.
Spent Nuclear Fuel Timothy Pairitz. Nuclear Power 101 Uranium-235 is enriched from 0.7% to 3-5%. Enriched fuel is converted to a uranium oxide powder.
1 TEPCO’s In-house Competitions for Improving Radiation Protection Skills Junichi TAIRA Tokyo Electric Power Company Radiation Protection Group ISOE International.
Nuclear Power Discussion March 25, 2009 Joint meeting of the Legislative Energy Commission; the House Energy Finance & Policy Division; and the Senate.
Used Fuel Projections and Considerations John Kessler Manager, Used Fuel and HLW Management Program, Nuclear Infrastructure Council Sustainable.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
Demonstration Test Program for Long–term Dry Storage of PWR Spent Fuel
Japan’s Nuclear Energy Program
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
1 JAPAN'S SPENT FUEL AND PLUTONIUM MANAGEMENT CHALLENGES Asian Energy Security Project Meeting Beijing, Oct 31-Nov.2, 2007 CONTENTS 1. Introduction 2.
The environment is everything that isn’t me. Albert Einstein Albert Einstein.
1 TEPCO’s ALARA Program (Basic Policy of Mid- and Long- Term Exposure Reduction) Toshiyuki HAYASHIDA Tokyo Electric Power Company Radiation Protection.
Nuclear Fuels Storage and Transportation Planning Project
Group Presentation to 27 th - 29 th May 2009 International Nuclear Forum BULGARIAN NUCLEAR ENERGY – NATIONAL, REGIONAL AND WORLD ENERGY SAFETY.
Licensing procedures for interim storage of spent fuel in Germany
PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
Nuclear Energy.
Improvement of TEPCO’s ALARA Process Shiro TAKAHIRA Tokyo Electric Power Company Radiation Protection Group ISOE-ATC Symposium October 12, 2006, Yuzawa,
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
4/2003 Rev 2 I.4.9h – slide 1 of 24 Session I.4.9h Part I Review of Fundamentals Module 4Sources of Radiation Session 9hFuel Cycle – Spent Fuel IAEA Post.
4/2003 Rev 2 I.4.9h – slide 1 of 24 Session I.4.9h Part I Review of Fundamentals Module 4Sources of Radiation Session 9hFuel Cycle – Spent Fuel IAEA Post.
The Curious Absence of New Nuclear Michael Hoeger Presented 02/06/2012.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
The safeguards activities for LWRs with MOX in Japan - Remote data-driven safeguards - YATSU Shoichi Ministry of Education, Culture, Sports, Science and.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
IAEA Sources of Radiation Nuclear Fuel Cycle – Fuel Fabrication Day 4 – Lecture 7 1.
LOW PRESSURE REACTORS. Muhammad Umair Bukhari
What do you know of Japan’s Nuclear crisis? How about any past nuclear issues? Do you feel that nuclear power is safe? Why or why not? Question of the.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
1 Demonstration Test Program for Long–term Dry Storage of PWR Spent Fuel 2 June 2010 M. Yamamoto, The Japan Atomic Power Company The Kansai Electric Power.
2010 ISOE Asian ALARA Symposium
OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2006
Japan’s Nuclear Energy Program
Regulatory Control Training Workshop
REMOVAL AND RELOCATION OF SPENT NUCLEAR FUEL FROM THE SAN DIEGO REGION
Fukushima Lessons Learned
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
National Tsing-Hua University
Occupational Exposure at Japanese Nuclear Power Plants
Presentation transcript:

Operating Experience in Spent Fuel Storage Casks T.Aida, T.Hara, Y.Kumano Tokyo Electric Power Company IAEA-CN-178/KN27 3 June 2010

2 Introduction In Japan, currently 54 nuclear power plants are in operation. The general strategy for the management of spent fuels is to store spent fuels safely until being reprocessed. Japanese utilities are coping with safe storage of spent fuels / operation of Rokkasho reprocessing facility.

3 Site Location Osaka Tokyo TEPCO service area Nuclear Fuel Cycle Facilities (JNFL) Mutsu Interim storage facility (RFS) Kashiwazaki Kariwa NPS (BWR:8212 MW) Fukushima Daiichi NPS (BWR:4696 MW) Fukushima Daini NPS (BWR:4400 MW) Higashi-dori NPS (BWR:TEPCO)

4 Storage Status of Spent Fuel at TEPCOs NPSs Number of NPPs Storage amount (ton-U) (as of Mar/2010) Storage capacity (ton-U) Occupancy (%) Fukushima- Daiichi 61,7602,10084% Fukushima- Daini 41,0601,36078% Kashiwazaki- Kariwa 72,1902,91075% Total 175,0106,370

5 Measures for increasing Storage Capacity Already doneAdditional measures Fukushima- Daiichi Unit 1-6 Increase in the capacity of spent fuel pools by re-racking Installation of common spent fuel pool Installation of dry cask storage facility Installation of additional dry casks Fukushima- Daini Unit 1-4 Increase in the capacity of spent fuel pools by re-racking Kashiwazaki- Kariwa Unit 1-7 Increase in the capacity of spent fuel pools by re-racking Increase in a fuel pool capacity * at Unit 5

6 In order to increase the flexibility for coping with increasing amount of the spent fuels, TEPCO decided to construct an off-site interim spent fuel storage facility. TEPCOs Decision for Further Storage Establishment of RFS, Recyclable-Fuel Storage Company (a joint company with JAPC ) RFS will begin operation of the Japanese first off-site interim spent fuel storage facility at Mutsu in 2012.

7 TEPCOJAPC Amount of spent fuels generated every year (A) 500ton-U100ton-U Amount of spent fuels reprocessed every year (B) 300ton-U50ton-U (A)-(B) 200ton-U 50ton-U Storage Capacity of the RFS Facility The size of the interim storage facility has been designed to meet this amount which will be generated over the next 20 years. 250ton-U x 20 year =5,000ton-U Dry cask storage at Tokai#2

8 Final Storage Capacity : 5,000tU Storage Period : up to 50 years Construction : First building: 3,000 tU capacity License for operation was permitted on 13/May/2010 Second building: 2,000tU capacity Cask type: Dry metal dual-purpose cask Main Equipment & Devices: -Equipment for carrying in, storing and carrying out recyclable fuels : -Metal Casks -Storage buildings -Metal cask handling equipment, etc. Outline of Mutsu Facility

9 Role sharing : RFS Responsible for designing/builiding/operating Mutsu storage facility for up to 50 years TEPCO,JAPC Responsible for loading spent fuels in metal casks Responsible for transporting casks before / after storage at RFS facility Responsible for the periodical inspection of dry casks and fuels which are stored at on-site dry storage facilities (Japanese authority made a demand for periodical investigations of dry casks in order to accumulate knowledge on a long-term storage in the safety assessment guideline for off-site interim storage facilities.) Outline of Mutsu Facility (2)

10 Storage Status of Spent Fuel at Fukushima-Daiichi NPS Approx. 700 spent fuel assemblies are generated every year. Stored in spent fuel pools / dry casks Storage method Storage Amount Capacity (existing facilities) Spent fuel pool at each reactor unit 3,4508,310 Dry cask408 Common pool6,2916,840 Total10,14915,558 Storage Status of spent fuel (as of Mar. 2010) (Assemblies) Approx. 450% of the total core capacity of 6 plants

11 Outline of Common Spent Fuel Storage Pool (1) In operation since 1997 A large-scale pool 12m x 29m x 11m(depth) fuels more than 19-month cooling Capacity: 6,840 assemblies corresponds to 200% of total core capacity Storage amount: 6,291 assemblies corresponds to 90% of the pool capacity

12 Outline of Common Spent Fuel Storage Pool (2) pool Cask loading pit Fuel storage rack a stainless rack for 90 assemblies 76 racks monitoring items pool water temperature water level of the pool area radiation in the building radioactivity in the air dust

13 Originally designed for transport casks Modified the license in 1994 / dry cask storage since 1995 Permission for the storage of 20 casks -9 dry casks are in operation,11 casks are to be installed. Efficient use of existing building Casks are laid down in horizontal Natural-convection cooling Outline of Dry Storage Cask Facility air inlet exhaust port windshield overhead travelling crane storage cask transport vehicle cask trolley

14 Specification of Dry Casks Large typeMedium type Weight (t)11596 Length (m)5.6 Diameter (m) Assemblies in a cask5237 Number of casks522 Fuel type8 x 8 New 8 x 8 Cooling-off period (years) > 7 > 5 Average burn-up (MWD/T) <24,000 <29,000 Additional 11casks are being prepared for installation.

15 Structure of Dry Cask Body: -ray shield (carbon steel) outer shell primary lid secondary lid basket (borated-aluminum alloy) cask frame neutron shield (boron-added resin) bottom plate Main features Cylindrical forged carbon-steel casks Similarity with transport casks Enhanced sealing/ monitoring functions Inner gas substituted with helium Steel for -ray shield/ resin for neutron shield Borated-aluminum alloy basket for sub-criticality

16 (1) leak in the primary lid metal gasket Design Features Concerning Containment (2) leak in the secondary lid metal gasket Space between lids Fuel storage space Helium gas Space between lids Outside air Helium gas Even if a leak in a metal gasket occurs, no radioactive material inside the cask (in the spent fuel storage space) is released outside the cask. Alarmed in case of pressure drop Metal gaskets Primary lid Secondary lid Pressure sensors To monitoring panel (alarmed in case of pressure drop) (Outside air) Helium gas pressurized to about 4 atmospheres Secondary lid Primary lid Fuel assembly Neutron shield Helium gas at about 0.8 atmospheres Space between lids Fuel storage space Body

17 Monitoring System at Normal Conditions storage building Unit5 control room alarm monitor local monitor 1. pressure between primary /secondary lids 2. surface temperature 3. inlet and outlet air temperature / temperature difference 4. area radiation in the building 3 1

18 Outline of Integrity Inspections Time Series 1995:Start of operation 2000:First inspection after 5-year storage 2005: Second inspection after 10-year storage Target A cask was selected as the test target which contained the maximum heat source inside the cask. Inspection Items Gas sampling in order to detect Kr-85 Visual inspection of sealing parts Leak test of the primary lid Visual inspection of fuel cladding for two bundles

19 Procedure of the Inspections 1)Transportation of a cask from the cask storage building to a reactor building 2) Leak test of the secondary lid 3) Secondary lid opening / visual inspection 4) Leak test of the primary lid 5) Inner gas sampling for Kr-85 detection 6) Reflood / removal of bolts 7) Transportation into fuel pool 8) Primary lid opening / visual inspection 9) Lift up of a fuel bundle / visual inspection

20 Leak Test for a Primary Lid helium cask body primary lid metal gasket B A measurement instrument PROCEDURE 1. A flexible pipe is connected to a detection hole (A). 2. The other end of the pipe is connected to the measurement instrument. 3. Helium among the doubled layer of a metal gasket (B) is vacuumed by a vacuum pump which is installed in the measurement instrument. 4. Flow rate of helium gas passing through the metal gasket is measured. 5. The measured amount is converted into leak rate.

21 Result of the Investigation in 2000 (1) sealing performance Leak test for the primary lid measured value: 5.3×10 -8 Pa m 3 /s required criteria: <1×10 -6 Pa m 3 /s No problem found in the confinement performance Visual inspection of the primary lid Nothing abnormal occurred on confinement, but white coloring was observed on the gaskets surface due to residual water. Flange surface of the cask Metal gasket of the primary lid All metal gaskets were replaced. Procedure manual was updated so that residual water could be completely removed.

22 Schematic Figure of the Whitened Region observed at the Investigation in 2000 Primary lid Secondary lid Body Metal gaskets inner gasketouter gasket

23 Result of the Investigation in 2000 (2) integrity of fuel cladding Inner gas sampling for measuring Kr-85 concentration Visual inspection of a fuel assembly No leak of Kr-85 from the spent fuel was observed based on the measurement of radioactivity of the sampled gas. Target: New 8X8 BWR assembly (approx.32 GWd/t) 17/Nov/199522/Nov/2000 No signal of any defect was observed. time radioactivity

24 Result of the Investigation in 2005 (1) sealing performance Leak test for the primary lid after five-year use since 2001 measured value: 1.6×10 -7 Pa m 3 /s required criteria: <1×10 -6 Pa m 3 /s No problem found in the confinement performance Visual inspection of the primary lid Nothing abnormal occurred on confinement, but white color change was observed on the surface of the gasket due to immersion to reactor pool water for several days before opening the primary lid. Flange surface of the cask Metal gasket of the primary lid Procedure manual will be additionally updated in order to reduce the immersion duration.

25 Schematic Figure of the Whitened Region observed at the Investigation in 2005 Primary lid Secondary lid Body Metal gaskets inner gasket

26 Result of the Investigation in 2005 (2) integrity of fuel cladding Visual inspection of a fuel assembly Target: 8X8 BWR assembly (approx.28 GWd/t) 8/Sep/199523/Aug/2005 Vacuuming finished Vacuuming started Background level Inner gas sampling for measuring Kr-85 concentration No leak of Kr-85 from the spent fuel was observed based on the measurement of radioactivity of the sampled gas. No signal of any defect was observed. time radioactivity

27 Conclusions Integrity of storage casks and fuel bundles was carefully investigated after 5- and 10- year storage in dry condition. The result did not indicate any significance of defect / degradation of the system. Our procedure manual was updated in order to reflect the lesson learned from these investigations. Next investigation will be held in a few years. These knowledge and data will be accumulated to support future transport after storage, etc.