KANE COUNTY DIVISION OF TRANSPORTATION STEARNS ROAD WETLAND MITIGATION SITE SECTION NO. 06-00214-03-BR PRE-BID MEETING.

Slides:



Advertisements
Similar presentations
U.S. Army Corps of Engineers Regulatory Program Regulatory Program.
Advertisements

PennDOT Strategic Environmental Management Program by Kenneth Thornton, PG, Ileana Ivanciu, PG, and James Heeren, PE 2011 TRB Waste Management and Resource.
Maryland Department of the Environment Restoration and Regulation Discussion Presented by: Wetlands and Waterways Program Maryland Department of the Environment.
HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
Marin Coastal Permit Coordination Program North Bay Watershed Association January 18, 2011.
State Waters and Stream Buffers
CREW CAMP ENVIRONMENTAL REVIEW L. David Glatt, P.E. North Dakota Department of Health Environmental Health Section.
Virginia Department of Conservation and Recreation Adopting a Local Program in Accordance with the Revised Stormwater Regulations Appomattox County February.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
TxDOT Strategies for Phase II MS4 Stormwater Compliance
Stream Corridors Christine Hall Natural Resources Conservation Service North Jersey RC&D Slides 1-12.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
Missouri Department of Transportation US Fish and Wildlife Service Squaw Creek National Wildlife Refuge Habitat Restoration Breakout Session Shannon Kusilek,
NATURAL RESOURCE STEWARDSHIP FOR HOMEOWNER ASSOCIATIONS Presented by: (Leader’s Name/Agency)
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Duane Hill, District Engineer
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
DIVISION OF TRANSPORTATION IRTBA General Membership Meeting October 27, 2011.
Aquascaping November 14, 2006 Country Creek HOA Manatee County.
Earth Disturbance Programs  Chapter 102 –Erosion Control & NPDES Permits  Chapter 105-General Permits  Dirt & Gravel Roads Program.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
BUILDING STRONG ® 1 Solid Waste Management Unit (SWMU) 16 Old Southside Landfill Joint Base Charleston Weapons Corrective Measures Implementation Michael.
Longmeadow Parkway Fox River Bridge Corridor
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Preventing Nonpoint Source Pollution
Interlocal Agreement – Transportation Impact Fees City Council Workshop July 9, 2013.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
Disaster Debris Preparedness Planning Angeline McInerny Wake County Environmental Services Department.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Alkali Creek Road Slope Stabilization and Stream Relocation The project scope changed after major rainfall caused slope failure jeopardizing safety and.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Construction Site Best Management Practices and the Project Design Process.
Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
New Stormwater NPDES Construction General Permit Effective August 3, 2011 New Stormwater NPDES Construction General Permit Effective August 3, 2011 Samir.
Erosion and Sediment Control Plans (ESCPs) San Rafael, California November 12, 2015 Marin County Stormwater Pollution Prevention Program.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Erosion and Sediment Control Overview MPCA NPDES Construction Stormwater Permit Engineering Day, 4/16/2012 Br 862, CSAH 16 over East Swan River.
Permit Process & Application Guide
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
Pollution Control: For Field Office Construction Sites.
 Dubuque County Annual Review Eric Schmechel Urban Conservationist Dubuque SWCD.
2010 Environmental Change Orders. Tom Harris, PE Field Engineer Division of Construction Management.
Stormwater Management
October 26, 2016 Amanda Gumbert Extension Water Quality Specialist
Town of Brighton, Department of Public Works
USDA -Natural Resources Conservation Service
Jefferson County SA Red Rocks Site Approval
Supervisor, RIDEM RIPDES Permitting Program
Christopher R. Bennett Darejan Kapanadze The World Bank
Washoe County Board of Adjustment
Belpre Construction / Post Construction
INDOT Storm Water Management
Washoe County Board of Adjustment October 4, 2018
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Presentation transcript:

KANE COUNTY DIVISION OF TRANSPORTATION STEARNS ROAD WETLAND MITIGATION SITE SECTION NO BR PRE-BID MEETING

PROJECT LOCATION NEW ALIGNMENT WEST OF IL ROUTE 25 AND EAST OF THE FOX RIVER SOUTH OF CNIC TRACKS AND NORTH OF MIDWEST GROUNDCOVERS ST. CHARLES TOWNSHIP, KANE COUNTY THIS PROJECT IS LOCATED IN A SENSITIVE ENVIRONMENTAL AREA

PROJECT LOCATION PROJECT LOCATION

PROJECT DESCRIPTION 11.7 ACRES OF WETLAND MITIGATION 12.8 ACRES OF COMPENSATORY FLOODPLAIN STORAGE 1,500 FT OF STREAMBANK RESTORATION 3,417 FT (0.65 MI) OF NEW ALIGNMENT ROADWAY EMBANKMENT THE PROJECT INCLUDES SPECIAL WASTE REMOVAL

STEARNS ROAD DIRECT IMPACT MITIGATION SITE

PROJECT DESCRIPTION THIS IS A WETLAND MITIGATION PROJECT FIRST AND FOREMOST. THIS PROJECT ALSO INCLUDES: –ROADWAY EMBANKMENT –COMPENSATORY FLOODPLAIN STORAGE –TEMPORARY AND PERMANENT STABILIZATION –SPECIFC TREE PROTECTION AREAS

CONSTRUCTION ENGINEERING KANE COUNTY DIVISION OF TRANSPORTATION COUNTY ENGINEERCARL SCHOEDEL PROJECT MANAGERMARK BAGHERPOUR CONSTRUCTION MGRDAVE BOESCH CONSULTANT - CHRISTOPHER BURKE ENGINEERING ENGINEER OF RECORDMIKE KERR, CBBEL CONSTRUCTION DAN CROSSON, CBBEL ENVIRONMENTALPAT KELSEY, CBBEWL

PHASING PHASE 1 – ALL WORK, EXCEPT FOR LANDSCAPING AND TEMPORARY SESC SHALL BE COMPLETED BY OCT 15, 2007 PHASE 2 – ALL SEEDING SHALL BE COMPLETED BY DECEMBER 1, 2007 PHASE 3 – ALL PLANTINGS SHALL BE COMPLETED BY JUNE 1, 2008 PHASE 4 -- ALL CONTRACT WORK INCLUDING PUNCH LIST, SHALL BE COMPLETED BY OCTOBER 15, 2008

FAILURE TO COMPLETE LIQUIDATED DAMAGES PHASE 1 -- $1,100.00/DAY PHASE 2 -- $ /DAY PHASE 3 -- $ /DAY PHASE 4 -- $1,300.00/DAY

404 PERMIT COMPLIANCE USACE SECTION 404 INCLUDING SECTION 401 WATER QUALITY CERTIFICATION KANE-DUPAGE SOIL & WATER CONSERVATION DISTRICT OVERSIGHT KANE COUNTY STORMWATER ORDINANCE SESC -- NPDES PHASE II

404 PERMIT COMPLIANCE CONTRACTOR SHALL MEET ALL REQUIREMENTS OF 404 PERMIT INCLUDING SOIL EROSION AND SEDIMENT CONTROL AND PROTECTION OF HIGH QUALITY AQAUTIC RESOURCES NO DIRECT DISCHARGES TO THE EAST BRANCH OR NORTH ARM OF BREWSTER CREEK NO DIRECT DISCHARGES TO THE FOX RIVER

KEY SPECIAL PROVISIONS DEBRIS REMOVAL –BREWSTER CREEK CONCRETE REMOVAL SELECTIVE CLEARING –LIMITED ACCESS TO SOME AREAS SEEDING, CLASS 4 AND 5 MODIFIED –8 SEED TYPES FOR CLASS 4 –8 SEED TYPES FOR CLASS 5 –4 INTERSEEDING SEED TYPES –LOCAL GENOTYPE – 150 MI RADIUS

KEY SPECIAL PROVISIONS PERENNIAL PLANTS –WETLAND EMERGENT TYPE –WETLAND TYPE PERENNIAL PLANTS –IDOT WILL TAG TREES & SHRUBS –IDOT & RE WILL INSPECT ALL PLANTS ON ARRIVAL TO THE JOBSITE.

KEY SPECIAL PROVISIONS COORDINATION BETWEEN CONTRACTORS MANAGEMENT OF SOIL EROSION AND SEDIMENT CONTROL

OTHER CONSIDERATIONS ELECTRIC SERVICE TO MIDWEST GROUNCOVERS SHALL BE UNINTERUPPTED CONTRACTOR AND RESIDENT ENGINEER TO WORK WITH MIDWEST GROUNDCOVERS ON TREE REMOVAL NEAR PROPERTY LINE USACE TO MAKE REGULAR SITE VISITS ALONG WITH KDSWCD