Evaluating Standards for Site Certification Presented to: American Public Power Association Presented by: Robert M. Ady, President Ady International Company.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
New Mexico Infrastructure Finance Conference, October 28, 200.
WESTERN LOUDOUN SCHOOLS: ALTERNATE SITES May 26, 2009 Schoene/Engle McDonough Assemblage.
From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
PREPARED WORKBOOK Kathy Castagna, EPA Region 1 Mark Lewis, CT DEEP John Podgurski, EPA Region 1 March 25, 2015.
1 Module #2 – Community Assessment. 2 Why Conduct A Community Assessment?  It supports community organization that leads to a Shared Vision and commitment.
Business Park Partnership Program. Prosperity 2021  Part of Strategy to  Encourage Job Creation  Encourage Development of Business Districts (Hargrove,
New I-65 Interchange at Worthsville Road Welcome!.
+ Proposed Lockwood Targeted Economic Development District 2015 Yellowstone County.
USAID Africa Bureau EIA Procedures for Sub-Projects
Missouri Certified Sites Program Missouri Department of Economic Development Presented By: Hal Van Slyck Program Administrator.
Missouri Certified Sites Program Missouri Department of Economic Development Presented By: Joel McNutt & Jo Ann Dent.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Small Farm Profitability: Is Wind Energy the Answer? 1
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
National Transportation || || 1 Lei Zhang, Ph.D. Associate Professor Director,
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Transfer of Development Rights
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
Indiana Shovel Ready Program Indiana Office of Community and Rural Affairs Indiana Economic Development Corporation.
Entergy Teamwork Arkansas Annual Luncheon February 9, 2005 Automotive Site Selection Process Presented by Dr. Buzz Canup Canup & Associates, Inc. Presented.
CR 470 Site Development Update. Agenda Agenda  Site certification  Look back  Certification requirements  Current status, what’s ahead  CR 470 Widening.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Presented by: The Ohio Department of Transportation 1 Land Use Managing the Environmental & Project Development Process.
1 Environmental Planning and Historic Preservation (EHP) Compliance (p ) EHP Compliance.
PROPERTY INSPECTION AND ANALYSIS: THE SITE Chapter 6.
Building Your Response Team AND GUIDING THEM TOWARD A SUCCESSFUL SITE VISIT.
Developing and opening a new facility. Stages in hospitality facility development There are five (5) steps in the development of a hospitality facility:
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Logistics and Practical Aspects of Construction of a Large LAr Tank in a Remote Location FLARE Workshop November 5, 2004 Elaine McCluskey Fermilab FESS/Engineering.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Today’s Lecture Announcements Phase I Environmental Site Assessment
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
Spokane Certified Site Program WEDA Conference 2012.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
Contractor Alternate Design Serving the Public’s Best Interest.
NJSPLS The Character and Nature of Claims Against Land Surveyors Ed Pagan, Jr., Esquire Pagan Affiliates LLC Richard N. Hartman.
October 2011 Schlumberger Site Assessment 36 Old Quarry Road Ridgefield.
BUILD READY PROGRAM. Benefits of Build Ready Drastically Reduce Construction Time Companies can build sooner on Build Ready sites Reduces the amount of.
December 2015 Detailed Presentation STATE WATER RESOURCES CONTROL BOARD REGIONAL WATER QUALITY CONTROL BOARDS CALIFORNIA Water Boards.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Figures & Maps Documentation Floodplain (FIRM) Maps Wetland (NWI) Maps Site Maps Conceptual Site Development Plan.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Industrial Site Readiness. Land Readiness For Industrial Employment Making The Case Part I: Timing is Everything.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
The Dalles, Industrial Certification Northwest Aluminum Company The Dalles, Oregon Douglas C. MacCourt Ater Wynne LLP US German Bilateral Working.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Site Selection Certification Presented by: Dirk B. Vanderleest, CM April 27, 2016.
Economic Development Forum The Georgia Allies GRAD Site Program Randy Cardoza Managing Director, Economic Development, AGL Resources, representing the.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
AIRPORT SURVEYS.
Stage II: Refinement of Idea
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Rob Conley City of Hamilton
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Community & Economic Development
The Prepared Process: The Next Generation
General Tab Project, Cost Schedule, and Work Limits Roadway Character
SHOVEL READINESS NEW YORK STATE economic Development council
Zahrani & Selaata IPP Projects
MPO School Transportation Working Group
Site Readiness Program
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Photovoltaic Systems Engineering Utility Scale Development:
Presentation transcript:

Evaluating Standards for Site Certification Presented to: American Public Power Association Presented by: Robert M. Ady, President Ady International Company May 6, 2010

#1 Reason Why Communities Are Eliminated From Projects Simply stated If you dont have a site, you dont have a product, and if you dont have a product, you dont need a business attraction or business retention program!

Importance of Site Certification Protection of key industrial/office sites Risk minimization Speed to implement prospect startup Major marketing tool for business attraction Indication of professionalism of economic development group Assist in economic development team building

Types of Certification Type of certifier --Local --Regional --State --Third party Method of certification --Checklist --Point total --Field investigation --Detailed application

Key Criteria for Evaluating Existing Sites Criteria #1: Immediately Available Criteria #2: All Utilities Are in Place Criteria #3: Physically Developable Criteria #4: Technically Developable Criteria #5: Ease of Product and Employee Movement

Criteria #1: Immediately Available Site is owned or controlled and can be marketed by the economic development organization Terms and conditions of sale have been established and are part of contract Price of the property has been determined

Criteria #1: Immediately Available- Alternative Options Have long term, renewable, assignable option agreement with owner or right-of- first refusal and letter authorizing the marketing of the site Identify individual terms and conditions associated with the property Have a firm land price from the owner

Criteria #2: All Utilities Are in Place Water line of sufficient capacity for industrial use on site or adjacent Sewer line of sufficient capacity for industrial use on site or adjacent Gas line of sufficient capacity for industrial use on site or adjacent Electric power line on site with sufficient capacity at nearby substation to handle industrial load T-1 telecommunications in place

Criteria #2: All Utilities Are in Place- Alternative Options Show size and location of existing utility lines Have plan for extending lines to property Indicate expense to extend lines and line extension policy (who pays) Have necessary right-of-way agreements for line extension Indicate estimated time for completion of utility extensions

Criteria #3: Physically Developable No easements or rights-of-way encumbering property No flood hazards or drainage issues Soil bearing tests taken on site No structures on site Topography amenable to construction

Criteria #3: Physically Developable- Alternative Options For on-site easements, indicate the ability and willingness or owner to relocate lines Have maps showing extent of all past flooding Have soil tests for surrounding properties or general soil conditions/bearing in the area If there is a structure on site, indicate cost of removal and party responsible If topography is irregular, have drawings showing placement and elevation of potential facility and the amount to site work that will be required to accomplish this result

Criteria #4: Technically Developable- Shovel Ready Commitment of incentives for any site infrastructure improvements necessary Properly zoned Environmental assessments completed (Phase 1, endangered species, cultural landmarks) Wetlands designation report completed Site compatible with surroundings Aerial photograph (hard copy and digital) available

Criteria #4: Technically Developable- Alternative Options List potential incentives that may be available for site development List steps in zoning process, estimated time for completion, and support for change List all preliminary steps undertaken for environmental and wetlands reports and have plans in place to mitigate whatever issues are discovered during due diligence Have available land use plans and other documents showing proposed development of the surrounding area

Criteria #5: Ease of Product and Employee Movement Site fronts on major highway with ease of ingress and egress No traffic funneled through residential neighborhoods No major traffic delays on roads leading to site Rail spur adjacent to site Direct access to interstate or limited access highway

Criteria #5: Ease of Product and Employee Movement-Alternative Options If not on a major highway, have commitment for turn lanes and signalization to minimize ingress and egress issues Identify alternative routes to avoid traffic through residential areas Have plans for highway improvements to speed traffic Indicate distance and travel time to interstate highway or limited access highway

Summary of Key Criteria for Evaluating Sites Immediate availability All utilities in place Physically developable Technically developable Ease of product and employee movement

The Ady-Austin Site Designation Program for Food Processing Step#1: Develop specification sheet for type of food processing under consideration Step #2: Develop general site data Step #3: Evaluation of any fatal flaws Step #4: Complete detailed site application form by client organization Step #5: Field work by Ady-Austin executives Step #6: Evaluation of completed application Step #7: Comprehensive summary document prepared by Ady-Austin, including award designation if determined

Past Ady-Austin Food Clients Anheuser-Busch Carvel-Celebration Foods Dole Fresh Vegetables Embria Company Frito-Lay Ghirardelli George Weston Bakeries Always Bagles General Mills M & M/Mars H.J. Heinz Company Bevpack Kikkoman Foods Michelina Foods Miller Brewery Company Wm. Wrigley, Company Swiss Valley Farms Sun Rich Fresh Food Swift-Eckrich Wenner Bread

Thank you Any Questions? Bob Ady, President Ady International Company Phone: