F-16 RLCRS Program Update

Slides:



Advertisements
Similar presentations
Bob Lacovara, CCM, CCT-I Convergent Composites 1.
Advertisements

N A V A L F A C I L I T I E S E N G I N E E R I N G S E R V I C E C E N T E R Mobile Sodium Nitrite Wastewater Treatment System Benefits:  $5M savings/year.
RoboBlast USA Abrasive Blast And Vacuum System “ABAVS” Welcome to RoboBlast USA Abrasive blasting hasn't been very exciting...until now! Call Us at
THE CAROLINA DEPOT 5/3/2015Kathryn Stepp Ver.1 Vacuum Assisted Tools and Glove Bags Reduce Chromium VI Exposure During Aircraft Corrosion Control Work.
IMPROVEMENT PLAN UPDATESPO Richard Latham Bridget Eggers Tyler Brent Valeria Gonzalez.
Industrial Ventilation - A major control measure Dr. AA, UTM.
Introduction Hazards are an inherent component of the workplace whether we recognize them or not. Some are easy to spot and are known by almost everyone.
October Module 4: Review of Prohibited Practices, Personal Protective Equipment and Dust Control Overview: Prohibited practices. Protect yourself.
Pollution Prevention for Paint & Body Shops Miami-Dade County Department of Environmental Resources Management.
Auto Body and Paint Shops Pollution Prevention and Best Management Practices.
Pollution Prevention Introduction Collision Repair Curriculum Paid for, in part, by the Kansas Department of Health and Environment.
The Basics of Lean and Clean Laura Pyzik 2007 Great Lakes/Great Plains P2 Conference March 13, 2007.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
9/30/ Module 3 Safe Work Practices. 9/30/ Video Segment: Safe Work Practices — Think about the following points as you view the video.
CADMIUM HAZARD AWARENESS.
Engineering Controls for Silica Art Wickman, CIH Georgia Tech Safety & Health Consultation Program.
/0303 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lead Safety 29 CFR , 29 CFR , 29 CFR.
Mercury – Source Identification, Collection, and Management at Duke University.
Unclassified U.S. ARMY TANK AUTOMOTIVE RESEARCH, DEVELOPMENT AND ENGINEERING CENTER Reverse Engineering Re-defined Requirements TARDEC 25 AUG Presented.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
RESPONSIBLE CARE ® POLLUTION PREVENTION CODE David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 26 Potential for Improvement Additional data –Accidents concerning.
Major Dan Bullock Chief, AF Corrosion Prevention and Control Office
Resource Management Resource Management 3.03 Understand support services.
Personal Protective Equipment Hazard Assessment This training program is designed to inform management of the requirements for conducting assessments of.
October Module 5: During the Work Overview: Traditional renovations create airborne dust. Prohibited practices. Protect yourself and make a personal.
Health Hazards!!! Introduction:
Overview of the Final Report and Findings from the Review of Sampling Methods in Extrapolated New Base-Year Generation Studies May 11-12, 2004.
©2008 Sponge-Jet Inc. All rights reserved. 1 Tank Preparation Chevron Water Softener and Treatment Plant Chevron water softener and treatment tanks that.
Think Digital, Think Ally Digital Media 1of19 SEO Press Release Strategy 2015.
How Humans Impact the Environment. Why Do We Pollute the Environment? The “Environment” divisions The natural environment The built environment The social.
Abrasive Blasting.
How to Select and Optimize Abrasive Blasting Equipment
Dust accumulation test Lordan A.C.S. Ltd.
Primary Prevention/Section 8 Partnership Webinar
Col Jon Eberlan 309 AMXG/CC DSN
New York State Pollution Prevention Institute
Multi-Purpose Reconfigurable Training System (MRTS) Overview
Paint & Coating Operations
Disabled Adult Transit Service:
Cornell Notes for Math Process Problem Use distributive property
CTMA Investment - $1.2M; Industry Cost Share - $1.3M
Waste to Clean Energy in Robeson County
BMW Project “Ship-to-Average“ by Matthias Pauli Thomas Drtil
ISO New England System R&D Needs
Crystalline Silica Compliance Update 2017.
CADMIUM HAZARD AWARENESS.
Lead.
Hazard Communication (HAZCOM)
F-16 Robotic Laser Coating Removal System 25 April 2017
Robotic Automated Coating Removal System (RACRS)
860th AMXS Modified Home Station Check
Resource Management 3.03 Understand support services
Meitler Consulting Inc
Shipboard Composite Repair Challenges
Data-Driven Reconfigurable Manufacturing Systems For The Air Force Aircraft Maintenance Environment JTEG Technology Forum: Facility Maintenance 31 July.
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Click to start.. Click to start. Dust Off Your Knowledge of Silica for PowerPoint Dust Off Your Knowledge of Silica SAFETY TALKS! © MMIV Bongarde Holdings.
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
REAL WORLD SILICA COMPLIANCE GENERAL INDUSTRY
Academic Assistance Program for an Athletic Department
Challenges for Robotics in Fission
Presentation transcript:

F-16 RLCRS Program Update Rik Crowther Senior Engineer OO-ALC/EN SME: Rik Crowther DSN:586-5361 DISTRIBUTION A. Approved for public release: Distribution Unlimited. HAFB ref# 13-03-11_AMXG_041 Built Right...Ready to Fight

Overview Plastic Media Blast RLCRS process data Benefits and issues Planned Improvements Future Implementations

Built Right...Ready to Fight PMB Process 2000 lbs. of haz. waste per AC Multiple operators in PPE 10-14 Flow days 500+ man hrs. (prep, blast, de-prep, pre & sand for paint) Reduces fatigue life of OML skins Built Right...Ready to Fight

RLCRS 10-12 lbs. of waste 40-50% man hrs. reduction 30% reduction in flow days Removes worker from PMB environment No impact to Airworthiness

Built Right...Ready to Fight Process Data Summary Built Right...Ready to Fight

RLCRS Average Process Hours RLCRS prep & operations: 139 hours RLCRS flow time: 67 hours RLCRS flow days w/2 shifts: 4 Sanding: 138 hours Total Process: 278 hours Total Process flow: 7 days

RLCRS vs. PMB Reductions: Total Process hrs: 200-300 Flow days: 2-4 Hazardous Waste: 2000 lbs.

The “Not So Great” Reductions: Increase in sanding hours 40-80 additional hours of sanding Mostly bottom of AC Stress/Strain complaints from AC painters Increase exposure to sanding dust

Built Right...Ready to Fight RLCRS Improvements EZP building RLCRS for Testing: Optimization for multiple AC Variable coating stack ups Dem/val future system upgrades Planned Upgrades for RLCRS: Reduce robot time 15-20% (30-50 hrs) Evaluating robotic assist sanding technologies Evaluating improved vacuum systems for sanding equipment Built Right...Ready to Fight

Built Right...Ready to Fight RLCRS Future Systems Repurpose C-130 system for increased F-16 workload at OO-ALC (F-35, F-22, A-10, Off air frame components) B-1 program AMARG program Built Right...Ready to Fight

Built Right...Ready to Fight Questions? Built Right...Ready to Fight

RLCRS De-painted AC

RLCRS De-painted AC

RLCRS De-painted AC