QUALITY ASSURANCE “Go High or Go Home!”.

Slides:



Advertisements
Similar presentations
Degree and Graduation Seminar Scope Management
Advertisements

Root Cause Analysis Procedure (IMSP525) Training
BA 301 Week 4. Homework Assignment – Read pages 40 – 56 (Yuthas) List all your activities for the last week and time spent to the closest hour e.g. Study,
Database System Development Lifecycle Transparencies
Project Scope Management
Managing Project Quality
What is Business Analysis Planning & Monitoring?
Database Planning, Design, and Administration Transparencies
Condor Technology Solutions, Inc. Grace RFTS Application Extension Phase.
© Mahindra Satyam 2009 Defect Management and Prevention QMS Training.
BSBPMG502A Manage Project Scope 5.3 Create Work Breakdown Structure The process of sub dividing project deliverables and project work into smaller, more.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Project Life Cycle.
Process Improvement. It is not necessary to change. Survival is not mandatory. »W. Edwards Deming Both change and stability are fundamental to process.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
2 nd Knowledge Area : Project Scope Management. Importance of Good Project Scope Management 1995 CHAOS study cited user involvement, a clear project mission,
Project Management Cross lifecycle Activity
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
Systems Analysis & Design AUTHOR: PROFESSOR SUSAN FUSCHETTO 10/24/
John D. McGregor Architecture Evaluation
Team-Based Development ISYS321 Managing the Information Systems Project.
Mahindra Satyam Confidential Quality Management System Software Defect Prevention.
IT Project Management, Third Edition Chapter 8 1 Chapter 5: Project Quality Management.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
PROCESS ASSESSMENT AND IMPROVEMENT. Process Assessment  A formal assessment did not seem financially feasible at the onset of the company’s process improvement.
A Quick Review of the Components THE DMAIC CYCLE.
1 TenStep Project Management Process ™ PM00.4 PM00.4 Project Management Preparation for Success * Manage Issues *
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit.
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
Janaki Douillard & Makenzie Bryk
Project Management 6e..
Mr. Joshua Mario Project Management
On Campus Internship Work Plan Creation
Quality Management Gábor Árva
IF 3507 Manajemen Proyek Perangkat Lunak
Service Management World Class Operations - Impact Workshop.
Project Management MGT 30725
Participant and Leader Training
Project Management Information and Tracking Advanced Concepts
Project Communication, Tracking, and Reporting
CS4311 Spring 2011 Process Improvement Dr
WORK BREAKDOWN STRUCTURE
Project Management and Information Security
Chapter 5: Project Scope Management
Information Technology Project Management – Fifth Edition
Chapter 5: Project Scope Management
Create a project schedule
PROJECT SCOPE MANAGEMENT
Introduction to Project Management Avneet Mathur
Chapter 3 Managing the Information Systems Project
CPMGT 300 Competitive Success/snaptutorial.com
CPMGT 300 Education for Service/snaptutorial.com.
CPMGT 300 Teaching Effectively-- snaptutorial.com.
Service Delivery and Support Program Update – Jan. 31, 2018
Chapter Objectives To understand the operational environment in which you execute your project To understand the need and role of oversight in managing.
Guidance notes for Project Manager
Project Management Process Groups
Data Migration Assessment Jump Start – Engagement Kickoff
Software Engineering Lecture 16.
Software Engineering I
PROJECT SCOPE MANAGEMENT
Business Modeling - Domain Analysis
Project Management Group
Effective Project Management: Traditional, Agile, Extreme
Project Scope Management
Project Scope Management
Joint Application Development (JAD)
Introduction to Project Management
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
CAPA, Root Cause Analysis, and Risk Management
Presentation transcript:

QUALITY ASSURANCE “Go High or Go Home!”

Developed Team Motto of “Go High or Go Home!” Our approach to project quality management involves the identification of specifications for our project deliverables that were identified in the scope statement. Creation of work breakdown structure and an assignment matrix to assign roles and responsibilities

“Ishikawa” Fishbone Diagram This quality control tool was utilized to improve group effort and tackle problems with quality control. The project manager presented the problem and asked for assistance from the group to determine the main causes of the problem

Group suggestions were subsequently drawn on the board as the main bones of the diagram This eventually led to the cause and effect diagram being filled out 1st Problem: Difficulty that we had with gathering all the members for meetings.

Ishikawa Diagram on Difficulty with Gathering Team

Solution to 1st Problem The group identified that the root cause of the problem was inadequate information dissemination. The team divided the activities according to the components of the WBS and used email as the primary medium for updating fellow team members on work assignments. Email communication also allowed us to preview meeting agenda as well as set up date and times for group meetings. 2nd Problem: Finding the best approach or method of collecting user input.

Ishikawa Diagram on Collection of User Requirements

Solution to 2nd Problem The team identified that the most productive method for data gathering was using the interview process. Two members had direct interviews with past and current employers. First hand experiences of group members with motel management systems and were also a primary source of user input.

Pareto Diagram During the initial testing phase we noted some recurring bugs. Pareto diagram was used to create a frequency histogram, helping us sort out the problems according to levels of priority. This analysis allowed us to efficiently identify the most vital problem that needed to be fixed. Consequently, the other two bugs were resolved after the most important one was debugged.

Pareto Diagram for System Bugs

Capability Maturity Model …The Initial Level ? Overall the team’s software process maturity can probably be best described to be at the initial level of the CMM. This team had such a limited lifespan and members worked on the project on a temporary basis. Thus creating more of an ad hoc approach, that is characteristic of the first stage of the CMM. Talents and contributions of individual team members were instrumental in developing the project deliverables.

…or maybe The Repeatable Level ? However, the project was undertaken using processes and concepts in information technology project management. Documentation and tracking were done using Microsoft Projects as the tool for following goals that were realistic, relevant to the size and scope of our software development process. All these focus on key processes that would be most typical of the second level of the CMM.