Office of River Protection 2013 Hanford ORP Site Status Report

Slides:



Advertisements
Similar presentations
WTP Supplier Qualification Process April 19, 2005 Bechtel National, Inc. U.S. Department of Energy.
Advertisements

1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Our Vision – Healthier Kansans living in safe and sustainable environments.
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
TSDF Pilot Checklist Program Alternative Audit Approach
Gerald Whitney Operating Experience Program Coordinator Presented May 5, 2010 DOE OEC Workshop - SLAC National Accelerator Laboratory "Lessons from the.
Office of River Protection 2014 Hanford ORP Site Status Report Glen Clark, WRPS 2014 ASP Workshop September, 2014 Albuquerque, NM Glen Clark, WRPS.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Savannah River Site Status Report DOECAP Analytical Services Program 2014 Workshop Ken Guay, (DOE SR Program Manager) September , 2014 Albuquerque,
U.S. Department of Energy’s Consolidated Audit Program (DOECAP) U.S. Department of Energy’s Consolidated Audit Program (DOECAP) Dr. Todd L. Hardt DOECAP.
A Corporate Overview of the Department of Energy Consolidated Audit Program (DOECAP) George E. Detsis Manager, Analytical Services Program Office of Corporate.
U.S. Department of Energy’s Analytical Services Program Systematic Planning and Data Assessment Tools and Training - SPADAT DOE Consolidated Audit Program.
Jhon Carilli Low-Level Radioactive Waste (LLW) Activity Lead
LDEQ Laboratory Internal Program Descriptions LDEQ Analytical Laboratory Program (General/Inorganic/Radiation) LDEQ Analytical Laboratory Program (Organic.
Engineering Standards Working Group Annual Meeting June 24-25, 2002 DOE Nevada Support Facility June 2002 Joe B Stringer, PE Framatome ANP DE&S.
Office of Legacy Management 2014 Status Report September 15–18, Stephen Donivan Laboratory Coordinator The S.M. Stoller Corporation, A subsidiary.
Review of Contractual Agreement Requirements Associated with DOECAP George E. Detsis Manager, Analytical Services Program Nile Luedtke DOECAP Operations.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
U.S. Department of Energy’s Consolidated Audit Program George E. Detsis Manager, Analytical Services Program Office of Corporate Safety Programs, HS-31.
Tank Operations Contract 1 Presenters: Fred Beranek Everett Gray Results of EFCOG/DOE Safety Culture Pilot Focus Group Assessment DOE ISMS Conference August.
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
Integrating ISMS Safety Concepts and Tools into the Design of CH2M HILL’s Demonstration Bulk Vitrification System September 12-13, 2006.
Joe Pardue Operations Team Lead and Laboratory Lead DOECAP Operations Team Pro2Serve 1.
TSDF Pilot Roundtable Pete Yerace, U.S. Department of Energy Consolidated Business Center Gene Grohs, Pacific Northwest National Laboratory Patty Hunt,
Office of River Protection 2015 Hanford ORP Site Status Report
Quality Assurance Policy in DOE Debbie Rosano Director, Office of Quality Assurance (AU-33) September 14, 2015 Presented to: 2015 Analytical Services Program.
11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology.
Nevada National Security Site (NNSS) Nevada Field Office (NFO) FY 2015 Status Report Milinka Watson-Garrett Analytical Services Manager U.S. Department.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
1 By Jim McCormick-Barger DOE, WTP Lead Construction Inspector Quality Challenges with the Construction of the First Large Nuclear Facility in the Past.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Portsmouth Site Status Report September 15, 2015 ASP 2015 Workshop.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
Fishbeck, Thompson, Carr & Huber, Inc. Special Wastes Characterization & Documentation Best Practices Michele J Buckler, P.E., LEED ® AP Stephanie C Werner.
1 X UCOR Oak Ridge Sample Management Office 2015 Site Status Report Presented by Dr. William Rogers.
FCIA Firestop Industry Conference San Antonio, TX November, 2008 Betsy Titus Gary Knef Underwriters Laboratories.
1 2001: WTP Construction Began. 2 WTP in 2015 Pretreatment Facility High-Level Waste Facility Low-Activity Waste Facility Analytical Lab.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
Bechtel National Inc. 1 Using Human Performance Analysis to Eliminate Errors Presented September 13, 2006 DOE Integrated Safety Management Best Practices.
1 X Oak Ridge Office of Environmental Management 2015 Site Status Report Presented by Vanna Gaffney.
Solving Cleanup Challenges Through Risk Reduction EM/RW Quality Assurance Activities Office of Standards and Quality Assurance (EM-64) April 15, 2009.
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
George E. Detsis Manager, Analytical Services Program (ASP) Office of Sustainable Environmental Stewardship Radiation Measurements Cross-Calibration (RMCC)
February 26 – March 1, 2012 ♦ Phoenix, Arizona Session # 90 Long–Term Stewardship at DOE’s Hanford Site Abstract #12575 Authors & Affiliation : Rick Moren:
DOECAP Laboratories Phased Audits U.S. Department of Defense 2016 Environmental Monitoring and Data Quality Workshop St. Louis, Missouri April 12-14, 2016.
Auditor-in-Training Guidance for the Trainer and the AIT ASP 2009 Workshop September 14-17, 2009 Susan L. Aderholdt.
2014 Environmental/Radiological Assistance Directory George E. Detsis Manager, Analytical Services Program Office of Environment, Health, Safety and Security,
Low-Level Radioactive Waste (LLW) Disposition at the
Regulations Under Revision Hazardous Waste
Oil & Gas Waste Stream Management and Permitting Options
Oak Ridge National Laboratory Office of Science Site Status Report
Sample Management Office
Glen Clark Principal Scientist, WRPS 2016 Annual ASP Workshop
Bradley Smith February 28, 2017
DOECAP Laboratories Phased Audits U. S
U.S. Department of Energy 2016 ASP Workshop
RETAP Retired Engineer Technical Assistance Program
U.S. Department of Energy 2016 ASP Workshop
Extent of Condition Joe Pardue
George E. Detsis Manager, Analytical Services Program
Analytical Services Program Manager,
QSM 5.1, QSAS 3.1, Errata Document Rev. 2
Oak Ridge Office of Environmental Management Update
Auditor Feedback Results
TITLES OF PRESENTATIONS IN TRAINING PROGRAMME AT UDAIPUR CHAMBER OF COMMERCE & INDUSTRY DURING ON OCTOBER 4, 2018 Environmental Issues in India with special.
Charles Simpson Washington River Protection Solutions May 2018
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
U.S. Department of Energy Perspectives on Waste Classification
Presentation transcript:

Office of River Protection 2013 Hanford ORP Site Status Report Robert Elkins, WRPS ASP 2013 Workshop 23-26 September, 2013 Asheville, NC

Hanford Site Map The Hanford Site, which covers roughly 586 square miles in southeastern Washington state, was home for the facilities which produced the majority of the nuclear materials for the nation’s defense program. As a result, nearly 55 million gallons of mixed waste generated during 40 years of production are stored in 177 underground storage tanks in the Central Plateau (purple) area. 149 of these are older single-shell tanks and 28 are the newer double-shell tanks. The Office of River Protection (DOE ORP) directs tank farms and Waste Treatment and Immobilization Plant (WTP) activities in the Central Plateau region whereas the Richland Office (DOE RL) administers clean up activity along the River Corridor (green).

A view toward the west of the majority of the Central Plateau with the Cascade Mountains in the distance. The Waste Treatment Plant is in the foreground and the Integrated Disposal Facility is the light brown rectangle on the left of the frame toward the middle. West of the Integrated Disposal Facility is the 222-S laboratory complex.

The Integrated Disposal Facility is an onsite landfill designed to store low level solid waste and future immobilized low activity waste glass monoliths produced by the low activity waste vitrification facility. Currently the low activity waste vitrification facility is roughly 75% complete and construction of the facility continues.

Waste Treatment and Immobilization Plant This is a February, 2013 photo of the five primary facilities which comprise the Waste Treatment and Immobilization Plant. At the top left the partially constructed structure is the Pretreatment Plant. The High Level Waste Vitrification Facility is the partially constructed building below the Pretreatment Plant. To the right of the High Level Waste Vitrification Facility is the Low Activity Waste Vitrification Plant. Above the Low Activity Waste Vitrification Plant and to the right of the Pretreatment Plant is the Waste Treatment and Immobilization Plant Analytical Laboratory, and to the right of the lab is the command facility for monitoring and controlling Waste Treatment and Immobilization Plant functions. Waste enters the Pretreatment Plant , is divided into High Level and Low Activity waste streams that are sent to their respective vitrification facilities. The waste is then mixed with glass forming frit, heated in a glass melter and poured into stainless steel containers to form three ton glass logs. Overall the project is about 65% complete.

WTP Analytical Laboratory The Waste Treatment and Immobilization Plant Analytical Laboratory is between 80 and 85% complete with much of the unfinished remainder of the project instrument acquisition and installation. The lab will wait to complete installation of instruments until about a year prior to glass production.

WTP Laboratory Hot Cells Hot cells in the Waste Treatment and Immobilization Plant Analytical Laboratory.

DOE ORP Mission Statement Our mission is to retrieve and treat Hanford’s tank waste and close the tank farms to protect the Columbia River. The DOE ORP Mission Statement is to retrieve and treat Hanford’s tank waste and close the tank farms to protect the Columbia River.

DOE ORP Prime Contractors Bechtel National, Inc. (BNI) Advanced Technologies and Laboratories International, Inc. (ATL) Washington River Protection Solutions (WRPS) Bechtel National, Inc. is responsible for the construction and commissioning of the Waste Treatment and Immobilization Plant. Advanced Technologies and Laboratories International, Inc. provides analytical services at the 222-S laboratory for routine tank farms operations. Washington River Protection Solutions manages all tank farms operations.

BNI Off-Site Commercial Laboratories BNI utilizes two non-DOECAP laboratories for industrial hygiene analyses BNI utilizes a laboratory for glass formulation research which is not a DOECAP participant Bechtel National Inc. utilizes two non-DOECAP laboratories for industrial hygiene analyses and a laboratory for glass formulation research which is not a DOECAP participant.

BNI Off-Site TSDF BNI does not utilize an off-site TSDF BNI has contracted WRPS to dispose of hazardous industrial wastes Bechtel National Inc. does not utilize an off-site TSDF, however they have contracted Washington River Protection Solutions to dispose of hazardous industrial wastes.

222-S Analytical Laboratory Complex An aerial view of the 222-S Analytical Complex in the Hanford Site 200 West Area.

222-S Analytical Laboratory The entrance to the laboratory is pictured at the top, a hot cell and lab space are at the bottom.

222-S Laboratory Hot Cells The 222-S Laboratory 11A Hot Cell Annex.

222-S Analytical Laboratory ATL performs routine inorganic, organic, and radioanalytical analysis of tank farm and environmental samples as well as inorganic analysis of industrial hygiene samples to support day to day tank farms operations (WSDOE and AIHA accredited) WRPS performs analytical method development, tank farm process support, and organic analysis of vapor samples (AIHA accredited) WRPS also administers 222-S complex operations Advanced Technologies and Laboratories International, Inc. is Washington State Department of Ecology (WSDOE) and American Industrial Hygiene Association (AIHA) accredited and participates in the MAPEP program. IH analyses are for Beryllium, Ammonia, and Mercury. Washington River Protection Solutions is AIHA accredited. IH analysis are for Volatiles, Furans, and Semi-volatiles.

Laboratory Quality Standards On-Site – Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) Similar to DOECAP QSAS but does not include IH analysis Based partly on NQA-1 for application at nuclear facilities Allows flexibility when dealing with high level rad samples Includes sampling and field analysis activities Includes process chemistry analysis Includes R&D projects related to environmental cleanup Off-Site – HASQARD for environmental laboratories and DOECAP QSAS for industrial hygiene laboratories For all Hanford on-site contractor laboratories and off-site subcontractor environmental laboratories the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) is the quality standard. For off-Site subcontractor industrial hygiene laboratories it is the DOECAP Quality Systems for Analytical Services (QSAS).

Varied Analytical Needs Industrial Hygiene Vapor Analysis General Process Chemistry Aluminum Dissolution Separation, Stabilization and/or Treatment of Selected Waste Streams Tank Corrosion Studies Analytical Support for Waste Tank Retrieval Solids Analysis Washington River Protection Solutions’ analytical needs as the tank operations contractor cover a wide spectrum of services not offered by any one laboratory.

Number of WRPS Samples Analyzed Off-Site Fiscal year 2013 includes estimates for the months of August and September. Fiscal year 2014 is projected to have sample numbers similar to 2013.

WRPS Off-Site Commercial Laboratories WRPS utilizes three DOECAP laboratories for industrial hygiene or environmental sample analyses WRPS contracts with one laboratory which is not a DOECAP participant for specialty industrial hygiene and vapor analyses Washington River Protection Solutions utilizes three DOECAP laboratories for industrial hygiene or environmental sample analyses, and one non-DOECAP laboratory for specialty industrial hygiene and vapor analyses.

Qualified DOECAP Laboratory Auditors WRPS provides three DOECAP laboratory auditors, two of whom are lead auditors ORP provides one DOECAP laboratory auditor Washington River Protection Solutions provides three DOECAP laboratory auditors and the DOE Office of River Protection provides one laboratory auditor.

Future DOECAP Laboratory Participation Provide audit support for laboratories used by ORP contractors Provide support for revision of the DOECAP QSAS and checklists The Hanford Site Office of River Protection will continue to provide audit support for laboratories used by ORP contractors, as well as support for revision of the DOECAP Quality Systems for Analytical Services (QSAS) and checklists.

DOECAP Laboratory Points of Contact Jeff Cheadle, DOE ORP Glen Clark, WRPS Here are the DOE Office of River Protection DOECAP Laboratory Points of Contact.

Non-Radiological TSDF Audits WRPS utilizes one off-site, non-radiological TSDF vendor for tank farm, 222-S laboratory and contracted WTP hazardous wastes WRPS has conducted its own audit of this vendor The vendor sends waste to several different facilities Some of these facilities are audited by DOECAP Washington River Protection Solutions utilizes one off-site, non-radiological TSDF vendor for tank farm, 222-S laboratory and contracted Waste Treatment and Immobilization Plant hazardous wastes. WRPS has conducted its own audit of this vendor. The vendor sends waste to several different facilities, some of which are audited by DOECAP.

Radiological TSDF WRPS utilizes one off-site radiological TSDF vendor with four different facilities All four facilities are audited by DOECAP WRPS participates annually in the DOECAP audit of the local facility in Washington state Washington River Protection Solutions utilizes one off-site radiological TSDF vendor with four different facilities. All of these facilities are audited by DOECAP. WRPS participates in the DOECAP audit of the local facility in Washington state.

Qualified DOECAP TSDF Auditors WRPS provides three DOECAP TSDF auditors Washington River Protection Solutions provides three DOECAP TSDF auditors.

DOECAP TSDF Points of Contact Jeff Cheadle, DOE ORP Here is the DOE Office of River Protection DOECAP TSDF Point of Contact.