Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda.

Slides:



Advertisements
Similar presentations
2.6 Plans and design - points to consider Jan-Olof Drangert, Linköping University, Sweden Planning and design - does it make any difference if they are.
Advertisements

FactorInformation Needed Enterprise: Natural Resources Unit: Soil Judging I. Intro- duction A. Protecting resources, like soil, is an important career.
Gobar Gas Plant construction
It is 2 o C The temperature drops by 3 degrees What temperature is it now? -1 o C.
Lesson 9 Design & Construction of Food Premises & Equipment
Water Delivery Systems for Horticulture Production in West Africa
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
Industrial Boilers Steam generators Closed vessels made of steel and
ACTIVE LEARNING PROCESS
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Boiler Operation Procedures
Educational Resource Library
PILE FOUNDATION.
Improving Soil Moisture Conservation By Using Vermicompost
ENVIRONMENTAL MONITORING AT SOLID WASTE (SW) LANDFILLS QUIZ Ruxandra Floroiu, Environmental Engineer, ECSSD WB Safeguards Workshop Chisinau, Moldova October.
WASH Cluster – Groundwater Pumping GWP GWP4 1 Groundwater Pumping Session 4 Water Distribution.
WASH Cluster – Emergency Training DR 1 DR3 1 DRAINAGE Session 3 Site Conditions.
Section 2 – Right Triangle Trigonometry
Learning Objective 1 Describe the safety considerations taken when service testing a fire hose.
Earth Control Measures at Project Detail Site Location Marina Barrage.
Plant sizing PPRE Oldenburg University biogas compact course April 26 – 28, 2011.
Ice. Pure and Simple ™ Welcome to the Ice-O-Matic ® on-line training modules.
Bellringer_4_Crust – Earth Science A horizon archipelago B horizon C horizon Chemical weathering coastal plain condensation delta geyser glacier Ground.
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
Proposed Modifications in Boiler Feed Tank By: D K Singhal
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
As presented by: Rodger Schuldt TCEQ Installer II License # OS19898 TCEQ Maintenance Provider License # MP00545 TCEQ Site Evaluator License # OS20270.
WASH Cluster – Emergency Training WTS WTS2 1 High water table sanitation Session 2 Technical options for high water table sanitation.
 Abandon the site and locate the structure elsewhere  Design deep foundations to carry the weight of the structure to competent stratum  Redesign the.
Site Planning: Site Drainage KMUTT First semester
Water Pollution. Watershed A watershed is an area of land from which all the water drains to the same location, such as a stream, pond, lake, river, wetland.
SITE 1 SITE 2 Site 3 Site 4 SITE 5 Selection of Site -fairly level with good quality of soil. - connected by roads -good communication facilities.
Chapter 8 Plot Plans.
Pump Installation Vigyan Ashram, Pabal.
Rainwater Harvesting.
We turn the AIR into a TOOL MOTOR BLOWER BASEPLATE Commonly used Nantong motor Imported from France Made in Taicang factory.
How do I Make Compost and How does it Benefit Soils and my Crops? Compost is a home-made fertilizer that saves farmers as much as K250,000/lima. If made.
Hydraulics For The Long Term
By Catherine Fontenot LTEC /29/ Preparations for your tree Preparations for your tree The tools you will need for the job The tools you.
Viikki Urban Tree Laboratorio Doc. Eero Nikinmaa, MSc Anu Riikonen.
Lec.16 Underground pipeline irrigation system - structures for underground pipelines.
FEDIAF Guide to Good Practice for the Manufacture of Safe Pet Food TRAINING PACKAGE Module V Plant design and maintenance Based on Version 9, 2009 of the.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Subsurface drainage – Investigations
Earth Science Unit Overview: Chapter 4 – Earth’s Water
Sam Womble County Extension Agent Victoria County.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
Environmental Toolbox. Technical Module Introduction.
 Why do we sample our soil?  Soil chemistry or biology testing  Identify field variability.
Biogas for households Mariska Ronteltap, PhD Lecturer Sanitary Engineering and Resource Oriented Sanitation Department of Urban Water Supply and Sanitation,
EA204 Environmental Technology Stormwater Management Lot Grading & Easements.
Construction of a fixed-dome bio-digester picture report of a field training in Malawi 29 th June – 16 th July 2015 All photographs taken by Asaah Ndambi.
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
Where is fresh water found? Chapter 7 Lesson 2. Learning Target/Vocabulary  Students will be able to describe the various forms of fresh water.  Vocabulary:
MANGO PRODUCTION TECHNOLOGY. Selection of Site 1. Sunny Place 2.Away from perennial water source 3. Well drained soils.
Unit 6/P2 – Subsoil investigations Name ________________
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
15 Feet : Minimum Width for Zone 1 Zone 1 Functions: Bank Stabilization Shading (water temperature control) Flood Protection Stream Inputs: Structural.
The Water Cycle.  The amount of water on Earth is finite (which means that there is a limited amount).  All of the water present at the beginning of.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Boiler Safety Valve Regulations
PIPELINES VIJAY VADER. PROCESS PLANTS  Essentially handling liquid/gases/solids  Need to transport them from one stage to another.  Transportation.
Prepared By: Suthar Pramit A. ( ). WHAT IS CROOS DRAINAGE WORK when the network of main canals, branch canals, distributaries, etc.. are provided,
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Greening Africa Together
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
Factors to Consider in Foundation Design Chapter # 02
BIOGAS PLANT.
Boiler Safety Valve Regulations
Presentation transcript:

Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda

Site selection Main considerations Easy construction works –Water logging –Rock Minimum construction cost Easy operation and maintenance –Feeding –Use of main gas valve –Composing and use of slurry –Checking of gas leakage –Draining condensed water from pipeline. The site should guarantee plant safety

Site requirements I Constant, high ambient temperature Even and smooth surface Slightly in elevated than the surrounding Close to: –dung collection point –water point –gas application point 2 meter away from foundations Space for plant and compost-pit Away from wells to avoid ground water pollution

Site requirements II Sufficient distance to trees Adequate distance from main trail or unsafe areas Good bearing capacity of soil Limited space: cattle shed on top of the plant after proper backfill Reasonably far from any machine producing vibration on soil

Setting out

Lay-out example Digester Outlet Inlet Slurry Pit Toilet

Reference line 30 – 50cm above ground level > 20 cm 30 cm

Thank you