Forward Looking Cost Base

Slides:



Advertisements
Similar presentations
Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
Advertisements

Optimal pricing for sustainability of regulated infrastructure industries South African Economic Regulators Conference of 2012 Deon Joubert 21 August 2012.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
Australian Energy Regulator AER Preliminary decisions for Energex and Ergon Energy 2015−20 Conference 12 May 2015.
ARTSA Improving Heavy Vehicle Safety Summit Chain of Responsibility and its potential to improve safety Marcus Burke National Transport Commission 16 April.
Public-Private Partnerships: State of Practice and Research Needs The 14 th Annual Public Private Partnership Conference World Bank, Washington, DC September.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
Transportation leadership you can trust. presented to NCHRP Project Panel presented by Cambridge Systematics, Inc. with PB Consult Inc. Texas Transportation.
An Overview of Our Regulatory Proposal
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
The View from Wall Street: A Capital Markets Perspective Debra G. Coy Svanda & Coy Consulting 2010 Mid-America.
Public Policy and Efficiency: Some Lessons from the Reform of the Australian Gas Industry Kevin Davis Colonial Professor of Finance Department of Accounting.
DATE: 21 August 2012 Determining the Regulatory Asset Base Anthony Felet – Regulatory Finance Specialist 1.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall. Performance Evaluation Chapter 10 1.
BSc Economics and related programmes
Australian Energy Regulator AER Preliminary decision for SA Power Networks 2015−20 Conference 13 May 2015.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER – Sebastian Roberts, General Manager Networks ◦Consumer challenge panel – Robyn.
Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals December 2014.
Investment and portfolio management MGT 531.  MGT 531   Lecture # 16.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
IPART’s review of CityRail’s regulatory framework – stakeholder roundtable 31 July 2008.
Managing Costs Strategically - A Road to Success By Manoj Misra Head of Regulatory(SP) Vodafone-India.
SAPN’s proposal: initial comments Bruce Mountain.
Getting Ready! Potential issues for consumers Queensland Distribution Network Regulatory Proposals Bev Hughson, Consumer Challenge Panel (CCP) 8 August.
1 RORB Return on Rate Base. Legal Basis  Section 43, (f) of Republic Act No Section 43. Functions of the ERC – x x x (a) x x x (f) x x x “The rates.
Victorian electricity distribution pricing review, 2016–20 Overview of revised proposals January
Briefing for financial market analysts 30 April 2013 Draft report on the effectiveness of information disclosure regulation at Auckland Airport.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Nordic Skiing Financial Management Plans - Planning Your Run.
The Australian Energy Regulator Economic benchmarking Input data.
Minor projects proposed approach.  Purpose of the session is to provide an overview of the proposed process for the review of Transpower’s minor projects.
Draft 2015 electricity distribution price-path reset Briefing for financial market analysts 4 July 2014 Sue Begg Commerce Commission.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
NTC policy update: Working toward a safer, more productive heavy vehicle industry Natroad Annual Conference Paul Retter, Chief Executive and Commissioner.
ATA Technical and Maintenance Conference Paul Retter, Chief Executive and Commissioner National Transport Commission Sal Petroccitto, Chief Executive Officer.
Revised draft decision: Initial default price-quality paths for gas pipeline services Briefing for financial market analysts 24 October 2012.
Initial observations on the Initial Observations Nathan Strong Chair, ENA Default Price Path Working Group.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Performance evaluation
Chapter 13 Financial performance measures for investment centres and reward systems.
Presenter: Dave Torres, Senior Product Manager, Forecast 5 Analytics
Local Government Sustainability in Queensland – Where to from here?
ACCELERATING UGANDA’S ECONOMIC GROWTH MOMENTUM
Andrew Reeves, Chairman Asia-Pacific Partnership on Clean Development and Climate: Energy Regulatory and Market Development Forum 4 November 2010.
First Quarter Fiscal Year 2009 Financial Results December 19, 2008
Maryland Commission on Climate Change 5/23/16
Proposed capital expenditure Categories
Energy Services Company Models: Opportunities for Transit
Fair Go Rates System Dr Ron Ben-David Chairperson
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
Question and answer session
Decentralization and Performance Evaluation
COMPETITION ASSESSMENT of Laws and Regulations
Economic Regulation of Irish Water
Yellowknife Airport: Governance and Revenue Generation
Catholic Health Australia
Stakeholder forum Consultation on Heavy vehicle Road Reform Phase 2 Independent price regulation and Forward Looking Cost Base August 2018 First of all.
Energy Services Company Models: Opportunities for Transit
Maryland Commission on Climate Change 5/23/16
Fair Go Rates System Dr Ron Ben-David Chairperson
Maryland Commission on Climate Change 5/23/16
Long-Term Financial Model & Ontario AM Working Group Meeting
Chapter 9: Setting the list or quoted price
APPROACHES TO MANAGING HOSPITAL CAPITAL SPENDING UNDER THE NEW HOSPITAL PAYMENT MODEL November 1, 2013.
Coal as Green Energy Source
Minerals & Energy Parliamentary Portfolio Committee
East meets West meets East
Presentation transcript:

Forward Looking Cost Base Technical Overview Ramon Staheli, Project Director Pricing Matt Barry, Manager Economics 8 August 2018

Contents What is a forward looking cost base How does it work Advantages and disadvantages Use and experience in other sectors

What is a forward looking cost base It is a tool to spread lumpy capital expenditure over time Infrastructure related expenditure tends to be lumpy, but we want revenue (charges) to be smooth over time A fundamental criterion for financial sustainability is that the net present value of expenditure and revenue is the same – the FLCB can help us achieve this Outcomes produced by the model depend heavily on policy decisions outside the model, e.g. rate of return on capital

Components of the FLCB The key output of the FLCB is a revenue requirement This consists of three building blocks Return of assets (depreciation) Return on assets Operating expenditure

Information requirements Model uses actual expenditure and forecasts in a range of common opex and capex categories Information on asset lives needed for each asset category to calculate depreciation For prototype model, road agencies populated a template, effectively ‘translating’ organisation-specific data into a common format More complex than reporting historical expenditure under PAYGO

Start / End of Regulatory Period Single Asset Example Asset Life Initial Cost of Asset Commissioning Date Replacement Date Depreciation Start / End of Regulatory Period

Building Blocks Approach - Stylised Opening RAB Year 1 Depreciation WACC Return on Capital Opex Revenue Require ment Commissioned assets Year 1 Year 2

Policy settings required The FLCB prototype model is consistent with longer term reform considerations under LTMR It could be used by an independent price regulator as outlined in the consultation RIS A number of policy decisions need to be agreed before it could be used – the current prototype uses placeholder assumptions to function Further work would be required, both within and outside of the FLCB model for more sophisticated calculations as may be required under possible future reform scenarios (including public consultation)

Policy Decisions Made… Revenue Determined…. ..in the short to mid term by…. ….in the mid to longer term by…. The green triangles are determined by the desired outcomes of the line in the sand approach – that is, the desired transitional revenue path from the status quo to a FLCB. The transition period: A longer transition will see a slower depreciation rate (shifting the bottom green arrow down) The initial RAB will be calculated “backwards” to achieve the desired initial revenue requirement and transition path. The blue triangles indicate the building blocks over time driven by future expenditure. Once the opening RAB is depreciated out, this would directly determine the building blocks. The following “policy” elements will effect the blue triangles: Cost of capital rate: An increase will steepen the top blue arrow, increasing the return on capital. Asset lives: Shorter asset lives will result in a steeper depreciation curve. This will be partly(?) offset by a lower cost of capital (the relative gap between the top and middle arrow will narrow) Cost allocation: Any change to the cost allocation approach that increased HV cost base would see a higher opex and steeper blue arrows. Return on capital Return on Capital Depreciation Depreciation Revenue Requirement initial year Opex Transition years Policy Decisions Made… ….line-in-the-sand drawn after…. ….WACC and cost allocation agreed

Advantages and disadvantages Flexibility – the model is very flexible about how costs are spread over time Better intergenerational equity – assets paid for as they are consumed rather than up-front Smoother revenue requirement over time Better for users as charges would be less volatile Better for road managers as revenue less volatile – this could lead to better long-term maintenance plans and/or contracting efficiencies Has the potential to more closely align expenditure and revenue over time compared to backward looking approaches Stability over time dependent on stability of policy settings Slightly more complex than PAYGO from a modelling perspective

Experience in other sectors The building blocks model is used in the regulation of other network industries such as telecommunications, gas and electricity in Australia Important difference is that full economic regulation exists in these industries – this has a strong influence on processes, timelines and costs Would expect application under the reform explored in the Consultation RIS to be significantly less complex and costly due to the proposed nature of the independent price regulator

The National Transport Commission leads regulatory and operational reform nationally to meet the needs of transport users and the broader community for safe, efficient and sustainable land transport. Keep in touch with the latest NTC news by registering to receive our free e-newsletter and alerts at www.ntc.gov.au