OSCAR/Surface (User Perspective)

Slides:



Advertisements
Similar presentations
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
Advertisements

TASK TEAM ON WIGOS QUALITY MANAGEMENT (TT-WQM). Topics:  Activities and discussions of the task team  Proposal for WIGOS Quality Monitoring System ST-QM.
Development and Implementation of the WIGOS Data Quality Monitoring System (WDQMS) Doc. 4.4 ICG-WIGOS Task Team on the Plan for the WIGOS Pre- operational.
REVIEW OF OUTCOMES FROM THE 2 nd WIGOS Workshop on Quality Monitoring and Incident Management ICG-WIGOS-5 WMO; OBS/WIGOS.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Tim Oakley, GCOS Network Manager 2 nd Workshop on WIGOS Quality Monitoring and Incident Management ​ 15 th – 17 th December 2015, Geneva Global Climate.
Monitoring Tools Timo Pröscholdt WMO; DRA. Today  Report  Timeline  Outlook.
ICG-WIGOS-6 Report from the Commission for Basic Systems
WIGOS Pre-operational Phase
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
GCOS Welcome and Update
WIGOS regulatory and guidance material
WIGOS IMPLEMENTATION LEAD BY WORKING GROUP ON INFRASTRUCTURE
The Plan, Status and First Results
Concept Proposal for RA-III Regional WIGOS Centre
WIGOS Data Quality Monitoring System (WDQMS)
Stuart Goldstraw, Met Office, UK
1st Session of the Task Team on WIGOS Data Quality Monitoring System
12th – 14th January 2017 Tim Oakley, GCOS Network Manager
Ivan Čačić President RA VI
OPAG on Integrated Observing Systems
GCOS Networks (GSN & GUAN) (2015 Report – GCOS Network Manager)
ET-SBO Report to ICT-IOS-9
WIGOS Data Quality Monitoring System (WDQMS)
Task Team on WIGOS Data and Partnerships
5th Session of the Task Team on WIGOS Metadata
(Dakar, Senegal, 28 – 30 September 2016)
The Plan, Status and First Results
Sue Barrell, Bertrand Calpini
Regional WIGOS Centres
WIGOS Pre-operational Phase
WIGOS Pre-operational Phase
Regional WIGOS Center in RA VI
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
4.2(2) WIGOS Editorial Board (WEdB)
WIGOS implementation in RA II
GUAN Task Team (Document 6.4)
WIGOS Data Quality Monitoring System (WDQMS)
Overview of the WMO Integrated Global Observing System (WIGOS)
Dr Sue Barrell, Australia
Inter-Commission Coordination Group On WIGOS
OSCAR/Surface, Vol. A, and the WMO Members
REPORT on RWCs in RA VI Ivan Čačić President RA VI ICG-WIGOS-7
OSCAR/Surface – and all you ever wanted to know about it
Co-chair Introduction
WDQMS NWP Pilot Project
Decisions and Recommendations for the
Organisation Météorologique Mondiale Pour une collaboration active dans le domaine du temps, du climat et de l’eau OMM Operating principles of the WMO.
Technical Coordinator - Data Buoy Cooperation Panel
Agenda Item 7.1: Aggregation Rules
(Name of the country) Presentation
Workshop (… 2016) WIGOS Project Office
Status of WIGOS implementation in Russian Federation
The interaction between WDQMS and OSCAR/Surface
WMO RA-II WIGOS Workshop Workshop summary and recommendations
WIGOS Pre-Operational Phase;
Guidance on WIGOS Data Partnerships Draft v1.0
Regional WIGOS Centre Tokyo
GCOS Update Document 10.2 ICG-WIGOS-8, Geneva (Jan 2019)
ICTT-WIS 1st Session CAS perspective on WIS
WIGOS regulatory and guidance material
AWS Network Requirements Analysis and Network Planning
The WIGOS Pre-Operational Phase
WIGOS - Regional and National Implementation Planning
COLLABORATION AND ENGAGEMENT WITH CROSS-CUTTING WMO PRIORITIES; WIGOS MAIN OBSERVING COMPONENTS GLOBAL CRYOSPHERE WATCH 25 Jan 2019 Árni Snorrason Chair,
Recommendations from TT-WSI
ICG-WIGOS, eigth session, Jan 2019
Inter-Commission Coordination Group On WIGOS
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Co-chair Introduction
Presentation transcript:

OSCAR/Surface (User Perspective) Global Climate Observing System WDQMS OUTPUTS AND DELIVERABLES OSCAR/Surface (User Perspective) 12th – 14th December 2017, ECMWF, UK TT-WDQMS-2 Tim Oakley, GCOS Network Manager

My use of OSCAR/Surface and WDQMS GCOS ‘GOS’ Networks CBS-LC-GCOS Climate Networks

OSCAR/Surface

Contents of OSCAR/Surface Reporting schedule WIGOS ID’s Discussion Points Contents of OSCAR/Surface Reporting schedule WIGOS ID’s Metadata Task Team (TT-WMD)

Resulted in many gaps, inconsistencies and errors. Contents of OSCAR/Surface Significant proportion of the current Metadata for Surface and Upper-Air is still taken from the WMO Volume A (flat-file) Resulted in many gaps, inconsistencies and errors. Many Members and Centres are waiting for the machine-to- machine interface, both for inputting and outputting Metadata.

GCOS Surface Network (GSN) Example of inconsistency GCOS Surface Network (GSN) 1023 – Agreed stations list of GCOS 986 – GSN network affiliation in OSCAR/Surface GCOS Upper Air Network (GUAN) 177 – Agreed stations list of GCOS 166 – GUAN network affiliation in OSCAR/Surface

Look at OSCAR/Surface

Metadata Task-Team (TT-WMD) Draft Recommendations from TT-WMD-6; Zurich 27th – 30th Nov. ICG-WIGOS to provide clarification about the transition phase for WIGOS Station Identifiers; The session recommends that, in order to engage all the non-NMHSs contributors to WIGOS, a more flexible way of assigning WIGOS SIs should be adopted, e.g. “issuer of identifier” field could be delegated to Programmes/Network, instead of using Member countries’ code, for certain Programmes. The issue of the accuracy and maintenance of WIGOS metadata should be clearly considered, e.g. to be under the responsibility of Regional WIGOS Centres (RWCs). To consider ways to improve the issue of PRs understanding the scope of their mandate includes all observing networks including those outside the NMHS, particularly in relation to WIGOS and WIGOS metadata.

Metadata Task-Team (TT-WMD) Draft Recommendations from TT-WMD-6; Zurich 27th – 30th Nov. WIS is not able to provide the schedule of international reporting – one of the main reasons is that there is no way to know which parameters are contained in the reports exchanged, therefore, a metadata element is needed in the WMDS to capture that. One new element was agreed to be added to the WMDS: “Schedule of International Exchange”. The OSCAR/Surface development team is recommended to add a new field, which will be needed to capture the output from the WDQMS, i.e., the real performance of the stations. The details are still to be discussed with the TT-WDQMS.

Conclusion WIGOS Metadata Standard (WMS) is comprehensive description of the required metadata across all WIGOS component observing systems. (But is still being developed) OSCAR/Surface has implemented much of the capability to record the mandatory WMS metadata. (But is still being developed and as yet lacks a long-term home) But the use and benefit of WMS and OSCAR/Surface is dependant on the uptake by WMO Members and critically the accuracy of the metadata Similar to WDQMS, WMS has the challenge of defining the standard and the process, whilst at the same being implemented into the operational world.

THANKYOU