Pierluigi Paolucci - I.N.F.N. Naples

Slides:



Advertisements
Similar presentations
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Advertisements

Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
Cables for the RE4 Upscope in CMS
Integration and Services RE3/1 and RE4/1
Production ad Quality control of RPCs for the CMS muon barrel system
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
RPC Barrel HV & LV system Lappeenranta University
T1 Electronic status Conclusions Electronics Cards:
DT & RPC Grounding STATUS
Electronics for RPC Upscope
HV & LV status LV system in W+1 and W+2 is OK
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
HV-LV, cabling & services
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
RPC’s HV-LV project Introduction HV and LV requirements
RPC HV&LV systems Introduction Detector description Requirements
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
RPC HV&LV systems Introduction Detector description Requirements
Pierluigi Paolucci - I.N.F.N. Naples
Resistive Plate Chambers in CMS
A. Boiano1, F. Loddo2, P. Paolucci1, D. Piccolo1, A. Ranieri2
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
The IFR Online Detector Control at the BaBar experiment at SLAC
Alfonso Boiano1, Flavio Loddo2, Pierluigi Paolucci1, Antonio Ranieri2
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
RPC HV&LV systems Introduction Detector description Requirements
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
The IFR Online Detector Control at the BaBar experiment at SLAC
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Detector Control System: towards the final system
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
HV & LV status LV system in W+1 and W+2 is OK
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Pierluigi Paolucci - I.N.F.N. Naples HV, LV I.N.F.N. Naples Barrel and Endcap projects High Voltage Low Voltage Detector Control System Cabling and routing Rack and Crate Schedule, status and cost F. Loddo2, P. Paolucci1, P. Passeggio1, A. Ranieri2 ,L. Roscilli1 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples Barrel description I.N.F.N. Naples There are 3 different kind of chambers with 2 or 3 bigaps and equipped with 6 or 12 or 18 Front-End Boards RB2/3 Bigap ALV1 DLV1 ALV2 DLV2 HV1 HV2 RB3 and RB4 ALV1 DLV1 ALV2 DLV2 HV1 HV2 Bigap RB1 and RB2/2 Bigap ALV1 DLV1 ALV2 DLV2 HV1 HV2 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples HV & LV schema I.N.F.N. Naples Reduction of HV 1020  480 ch LV 1560  960 ch 1 HV ch. per chamber 2 LV ch. per chamber SECTOR schema 6 FEBs / 2 bi-gaps 6+6+6 FEBs / 3 bi-gaps 1+1 HV 1 HV 2 LV 6+6 FEBs / 2 bi-gaps 12 LV channels 8 HV channels per wheel TOT gaps 408 2040 HV 96 480 FEBs 936 4680 LV 144 720 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples HV & LV schema I.N.F.N. Naples Control Room LV ch. 720 LV baords 60 EASY 20 HV ch. 480 HV boards 80 12 SY1527 HV-EASY HV-EASY Detector HV distributor 1 in – 2 out HV distributor 1 in – 2 out 3 4 RPC LV RPC LV 2 5 1 6 12 7 11 8 RPC LV RPC LV 10 9 HV 4-polar cable LV cable HV 10x4-polar cable panel HV panel HV 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples LV connections schema I.N.F.N. Naples 60 LV boards placed in 20 crates (1 per balcony) Power consumption: board (12 ch.)  116 W crate (3 boards.)  350 W wheel (4 crates)  1.4 KW Total  7.0 KW 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples HV: where we are I.N.F.N. Naples High Voltage (SY1527-EASY-A3012): The power supply tender has been assigned to the CAEN in the 2004; A complete prototype has been delivered in Dec 04 and has been tested in Naples using the RB3 chamber. Delivery will begin in Sept 05…to Dec 05. All HV cables will be assembled at the CPE when the cut lengths will be ready The “big” multi-conductors cables tender has been assigned to the Kerpen and it will be delivered in July 2005 at CERN; The barrel HV distributors are in production; The HV patch panels in the 2005; 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples LV: where we are I.N.F.N. Naples Low Voltage (SY1527-EASY-A3009) : The power supply tender has been assigned to the CAEN in the 2004; A complete prototype has been delivered in Dec 04 and has been tested in Naples and then modified by the CAEN to reduce the noise (see next). Delivery will begin in Sept 05…to Dec 05. All HV cables will be assembled at the CPE when the cut lengths will be ready. Cable, connector and pins have been received. 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples LV Test Napoli feb 05 Noise ripple 01/05: +/- ~ 10 mV (150 KHz) +/GND ~ 1 V (150 KHz) -/GND ~ 1 V (150 KHz) EASY CRATE - + mP GND crate GND shield LV cable Solutions proposed: +/GND  C ~ 10 mF mP GND / crate GND  C ~ 100 mF better crate GND sense reference connections new connector Same for the HV board 10 mt Result 04/05: +/- ~ 10 mV (150 KHz) +-/GND ~ 30 mV (150 KHz) Ana1+ Ana1 – Dig1 + Dig1 – Ana2+ Ana2 – Dig2 + Dig2 - RPC RB3 distrib. shield safety GND Ref. GND 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples Rack LV From LV power supply with floating output ALV1 AGND1 ALV DLV1 DGND1 shielded cable AGND ALV2 AGND2 DLV DLV2 DGND DGND2 shield LV distrib. board 4 pairs IRON – MAGNET safety ground AGND FEB 1 chip chip AGND FEB copper strip chip kapton Double Gap 2 AGND DGND Double Gap 1 Chamber metallic structure AGND chip chip FEB 6 HVReturn Grounding Schema Copper 2 Copper 1 chamber GND 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Barrel/Endcap HV and LV numbers I.N.F.N. Naples HV COST Channel SY1527 A3512 EASY distrib Barrel 480 1 80 12 30 500 K€ Endcap 432 72 472 K€ 3500 Euro LV COST Channel SY1527 A3009 EASY distrib Barrel 720 1 60 20 260 K€ Endcap 864 72 16-20 280 K€ 3200 Euro 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Barrel/Endcap HV and LV costs I.N.F.N. Naples Barrel Hardware Equipment Cabling TOT HV 300 K€ 140 K€ 60 K€ 500 K€ LV 230 K€ 14 K€ 16 K€ 260 K€ Endcap Hardware Equipment Cabling TOT HV 272 K€ 140 K€ 60 K€ ? 472 K€ LV 250 K€ 14 K€ 16 K€ ? 280 K€ The total cost of the HV & LV systems is 760 – 752 K€; The HV-LV barrel cost increase (80 K€) is due to the hardware cost; 10% of the total cost is due to the cable installation. 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples HV & LV cable drawings I.N.F.N. Naples 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples USC55 barrel HV system 8U EASY 1 2 3 4 5 6 - fan tary heat exchange HV distributor 2U 50 U 36 input ch. 48 output ch. Total: 144 output ch. 144 input ch. "full" crate schema General Information HV EASY board: 7 ch. Full EASY crate: 42 ch. EASY (6 out 7): 36 ch. HV distributor: 32 input ch. 16 output ch. Rack height tot: 56 U turbine 4 U air defl. 2 U Rack available height 50 U 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

USC55 HV barrel racks composition EASY 1 2 3 4 5 6 - fan tary heat exchange HV distributor 2U 56U/ 56 U 36 input ch. 48 output ch. S1H02 turbine air deflector 4U 8U EASY 1 2 3 4 5 6 - fan tary heat exchange HV distributor 2U 36 input ch. 48 output ch. S1H03 turbine air deflector 4U 8U EASY 1 2 3 4 5 6 - fan tary heat exchange HV distributor 2U 36 input ch. 48 output ch. S1H04 turbine air deflector 4U 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

USC55 HV barrel racks composition S1H05 4U turbine Some numbers about this configuration: 3 “full” racks with: 4 EASY crates with 6 HV boards; 24 HV boards A3512; 9 HV distributors; tot of 144 HV channels; total height 56U (full). 1 “half” rack with: 2 SY1527 mainframes; 2 EASY crates with 4 boards; 3 HV distributors; tot of 48 HV channels. SY1527 HV 8U SY1527 LV 8U EASY 1 2 3 4 - - - fan tary heat exchange 8U 24 input ch. HV distributor 2U 48 output ch. 42U/ 56 U EASY 1 2 3 4 - - - fan tary heat exchange 8U 24 input ch. TOTAL numbers 14 EASY crates; 80 HV boards A3512; 480 HV channel; 30 HV distributors; 2 SY1527 mainframes. 2U air deflector 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples RPC Rack Map 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples Rack composition 4 EASY crate per rack (S1H02-03-04-05); 9 HV distributors; 6 HV board A3012 per EASY crate; Rack S1H06 with 2 Mainframes + 2 A3486 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples Production I.N.F.N. Naples The EASY HV system will be delivered in Naples from September 2005 to January 2006: 80 A3012 + 12 EASY crates + 1 SY1527 They will be tested in Napoli; The EASY LV system will be delivered at CERN from September 2005 to January 2006: 60 A3009 + 20 EASY crates + 1 SY1527 They will be test at CERN using the common facilites 2 EASY crate (LV + HV) will be used for the magnet test and for the cosmic challenge and they will be delivered in Napoli at the end of Sept 2005. HV and LV cable and connector are already at the CPE company where they will be assembled when the cut-length will be known (starting from the 2 cosmic challenge sectors) No news about the AC-DC converter for the LV system 11/12/2018 Pierluigi Paolucci - I.N.F.N. Naples