TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.

Slides:



Advertisements
Similar presentations
Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005.
Advertisements

Quality Management Training Quality circles Bench Mark Kaizen.
Url: www. shahbuilwell.com Phone: ,
DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Network Design and Implementation
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
Managing the Information Technology Resource Jerry N. Luftman
Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004.
The Israel Telecommunication Corp. Limited IT Division 2003 November Production Readiness Reviews of IT Systems in Bezeq 1 Production Readiness Reviews.
Computers: Tools for an Information Age
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Company Profile.
Ocimum Systems: –Established in the year 2013 in Bangalore with a team having over a decade of expertise in the networking industry and a vision to provide.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
PowerPoint Presentation by Charlie Cook Copyright © 2004 South-Western. All rights reserved. Chapter 7 System Design and Implementation System Design and.
understanding your individual needs  Company Profile.  Organization Chart.  Customer Related Process.  Quality Policy.  Quality Our Commitment.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
ISO 9000 Introduction Imran Hussain.
Project Life Cycle Introduction and Overview © Ed Green Penn State University All Rights Reserved.
CORPORATE PROFILE
Release & Deployment ITIL Version 3
Project Management Lecture 5+6 MS Saba Sahar.
SOLAR POWER SOLUTION FOR TELECOM APPLICATIONS
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
Quality Management Systems P.Suriya Prakash Final Mech Vcet
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
AMMAR ENGINEERING SERVICES
Initiating and Planning Systems Development projects
Civil Works, SSA, Assam Every School Beautiful Every Child In School Every Child Learning A xom Sarba Siksha Abhijan Mission.
Server Virtualization: Navy Network Operations Centers
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
From Research Prototype to Production
Welcome to Address : Sr. No. 227/1, Sahakar Nagar, Dighi Road, Bhosari, Pune Phone Number:
Chapter 14 Information System Development
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Presentation to HAUC (UK) Wednesday 30 May 2012 RINA London.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
5/28/2016Focus Tech Solutions1 Introduction of. 5/28/2016Focus Tech Solutions2 About Focus  Focus Tech Solutions provides inspection services to manufacturers.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Software Engineering Lecture # 1.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Chapter 12 The Network Development Life Cycle
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Empowering Your Business Infrastructure CORPORATE PROFILE PRESENTATION.
Accounting systems design & evaluation 9434SB 18 March 2002.
Standard IP Solutions - Call us Now at or Toll Free
Rob Connatser NSS Instrument Work Packages and XLPM.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Building Coordinators Luncheon January 20, Agenda Welcome – Pete Strazdas and Jan Van Der Kley LUNCH Presentations Building Coordinator Custodial.
We are there use our Time to Save your Money Leeway Logistics Call us at :
Session Name/Lecture Name
About Us Ocimum Systems:
Systems Analysis and Design
Chingro Solutions Pvt Ltd
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
The Survival Plan.
SCOPE Commissioned to Build Data Analytics Program
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
Presentation transcript:

TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.

About Ourselves n Tics a Construction as well as Consultancy Company offering Site Management Services for over a decade, for all infrastructural activities related with Site Build Up for Telecom Sector, has now been formed into a Limited company, backed by a professionally accomplished group n Consisting of a team of over 300 experienced engineers fully conversant right from Survey, Design, Civil, Electrical, Air-conditioning & Alternate Power Supply Systems backed by a liaison team, to facilitate the execution n Our theme is Give us your Net work plan, we give you a Site ready for commissioning & integration into the Network n In other words we are you on field in Letter & Spirit What are We ?

Overview n Site Location details-Search Circle n Generalized know how of the equipment i.e. type of equipment to be provided on the site & its specifications Input from Customer Output from TICS n Site Survey & acquisition. n Site completion as per customer requirements assuring Safety, Quality & Speed. n Site hand over with complete site specific document, Acceptance Manuals, Test Reports, Warranty cards, Final Bill of Materials with market verifications, Maintenance & Operational manuals for electrical equipment. n Integration of PIU, DG, AC, Rectifier, Battery Bank, Fire and Security Systems with Telecom equipment. n Quality Assurance Plan implemented at site.

Our Offer Scope of Work n Site Feasibility Survey n Site Acquisition, n State & Local permissions n Survey Report & Proposals for Site Planning n Generation of generalized working specifications & procedures n Site Specific Document u Site Drawings - Civil, Electrical, Air-conditioning, DG, Telecom Cable Routing & Equipment Layout Plan u Scope of Work for each Vendor u Bill of Material u Site Budget u Project Planning with time schedule u Quality Assurance Plan u Dedicated Site Supervision u Monitoring of Time Schedule

Our Offer Scope of Work contd.… n Total Coordination with Vendors n Supervision of the Installation & checking of u Electrical System u Alternate Power Supply System u Air-conditioning System u Grounding System u Security & Fire Alarm System u Telecom Equipment & Outdoor Installation n Third Party Checks & Tests on the operations of the above systems n Site Hand-over Acceptance Manual n As Built Documents n Coordination with maintenance team of customer for initial operation of the site and troubleshooting

Management Tools Supervision Network TICS Head Site EngineersSenior Engineer Design Office Approved Plans Survey Survey Report As Built Document Site Completion & Verification Site Hand Over CUSTOMER

Management Tools Reporting Procedure / Site Coordination Site in Progress n Status of Work carried out at site n Material Reached at site n Delays if any n Action Proposed n Plan for the succeeding period Final Compilation of Report at TICS Office CUSTOMER Comments & Suggestions In case of emergency Instructions / Guidance

Customer Benefits n Safety, Quality & Speed n Technical Assurance n Cost Optimization - fixed cost on per site basis n Third Party Checks on all Infrastructural Activities n Rich Information on Market Rates, Vendors & Alternatives n TICS representation at site will give a logistics benefit n Zero Defect Principle n Follow up with the vendors

Our Strengths n Complete familiarity with the Infrastructure requirements of Telecom Sector n Technical Ability n Vast Resources to source out alternate vendors of all items n Complete familiarization with Northern states n Past & present experience of having worked in the area n Complete set up in Punjab, Haryana, UP East, UP West, Bihar, Bangalore & Delhi n Minimum Response Time

Comparison CUSTOMER EXECUTES n Builds up additional infrastructure team n Training of the team n High Communication & Conveyance Cost n Long Term commitment for employed staff n Variation limited on the quantum of the work to be handled n Variable Input Cost n Third Party checks at extra costs TICS EXECUTES n Existing Teams n Trained Engineers n Complete familiarization with the Northern states including Delhi n No Communication & Conveyance Cost n No Long Term commitment as cost is per site n The number of Engineers deployed proportion to roll out plan n Fixed Cost n Third Party Checks included

A Vote of Thanks n Tics is indebted to Customer for putting faith in us & in return we would endeavor to give our best, in improving on the short comings in the upcoming phase under completion & develop new thrust in Economic Extraction of Men, Money & Material-so that our services are value added -Compiled by Deepak Kaushik