BOND PROGRAM- Door Lock & Building Access

Slides:



Advertisements
Similar presentations
- 0 - Life Academy Seismic Evaluation and Relocation Timeline Analysis Division of Facilities Planning and Management.
Advertisements

Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 21, 2008 BUILDING TOMORROW TODAY Cordoba Corporation.
DISTRICT IMPROVEMENT PLAN Technology Domain Annual Progress Report Lakewood School District # 306.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District November 1, 2007 BUILDING TOMORROW TODAY Cordoba Corporation.
1 ECM/EDMS Project HSD, TRD, SRCA September 26, 2007.
Bond Program Planning Imperatives Study Session October 12, 2004.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
PARCC Progress Update 1 June 26, In the Last Year… 2 June 2012 Minimum Technology Specifications, Version 1.0, Released Item Development Began August.
Facilities Excellence Project Delivery Methods Board of Trustees April 12, 2005.
Capital Program Update Maintenance Garage On schedule - Final Completion is May 19, 2007 but the District needs to move in April because the.
Christian Academy of Lawrenceburg Strategic & Infrastructure Investment Plan Christian Academy of Lawrenceburg Strategic & Infrastructure Investment Plan.
MENDOCINO COLLEGE MASTER PLAN Mendocino College Faculty and Staff Presentation December 10, 2008.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Central Plant Solano Nursing Sim Lab Student Union Decision Center Construction Plan Summer 2008 Bell Tower Crawl Space Data Center Upgrade.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Bond Construction Update Citizens’ Oversight Committee Long Beach Community College District January 28, 2008 BUILDING  TOMORROW  TODAY Cordoba Corporation.
The BIM Project Execution Planning Procedure
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
Eden Central School District Board of Education Meeting Eden CSD 2020 Project Update September 16, 2015.
PROP K UPDATE Citizens’ Oversight Committee Meeting October 17, 2013.
ENL1819T Progress Report Confidence in Our Success.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Calistoga Joint Unified School District Measure “A” Citizens’ Oversight Committee Meeting October 27, 2011.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Calistoga Joint Unified School District Measure “A” Citizens’ Oversight Committee Meeting January 18, 2012.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Pinole Valley High School (PVHS) Project Status 1 Facilities Subcommittee Meeting February 10, 2015.
HEARTLAND COMMUNITY COLLEGE COLLEGE DEVELOPMENT PLAN PHASE II PROJECT SCHEDULE August 26, 2009.
Agriculture and Industrial Technology Complex Capital Planning and Development Project Highlight.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Facilities Modernization Program Funded by Measure B Project Report September 21, 2015.
West Valley College Division Council Committee and Performance Goals Committee Retreat Wednesday, August 22, pm Baltic Room, Campus Center.
+ Facilities and Security Updates December Security Security systems for ES and MS/HS We have had walkthroughs and quotes from 3 potential vendors.
 Board of Trustees Meeting June 25,  Topics of Discussion 1. District 5-Year Construction Plan 2. Cost Components of Construction 2.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Budget and Program Advisory Committee Interest Meeting November 12, 2015 Hammondsport Central School High School Library.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
DIVISION MEETING 5/5/05 Natural Sciences Division.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District March 3, 2010 EDUCATE  ENGAGE  EMPOWER 1.
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
Mt. San Jacinto Community College District Five Year Construction Plan
Revitalization of AIT, CONS and DRA programs
April 2016 Bond / Facilities Update Presentation
2017 Measure X First Quarterly Meeting
Capital Improvement & School Construction Bond
SONOMA COUNTY JUNIOR COLLEGE DISTRICT Measure H update for the Governing Board April 11, 2017.
Bond Oversight Committee
Facilities and Sustainability Committee
2014 Bond Program October 22, 2016.
CORE PROJECTs July 27, 2018.
College of Alameda Integrated Planning and Budgeting Process
David Salazar, Chief Facilities Executive
Facilities Modernization Program
Projects in the Pipeline
M E A S U R E ‘G’ P R O G R A M U P D A T E
Citizens’ Bond Oversight Committee September 21, 2016
Presentation transcript:

BOND PROGRAM- Door Lock & Building Access District Citizen’s Oversight Committee June 8, 2018

AGENDA I. Introductions II. Current Progress Interior Lock Example Execution Strategy Phase I Phase II Active Design & Construction Projects AGENDA

CURRENT PROGRESS BOND PROGRAM- DOOR LOCK & BLDG. ACCESS Research & Development – COMPLETE Active Shooter Response Guidelines (Best Practices) Industry Standards (Manufacturer, Architects) Division of the State Architect (DSA) College Facility Directors Sheriff’s Department

CURRENT PROGRESS, CONT. BOND PROGRAM- DOOR LOCK & BLDG. ACCESS 2. Chancellor’s Directive No. 185 – DOOR HARDWARE/ LOCKING DEVICES- COMPLETE Performance Requirement (Form, Fit & Function) Multiple Door Hardware Sets Acceptable

INTERIOR CLASSROOM LOCK SAMPLE BOND PROGRAM- DOOR LOCK & BLDG. ACCESS For Reference Only

INTERIOR CLASSROOM PANIC BAR SAMPLE BOND PROGRAM- DOOR LOCK & BLDG. ACCESS For Reference Only

CURRENT PROGRESS, CONT. BOND PROGRAM- DOOR LOCK & BLDG. ACCESS 3. Preliminary Door Inventory – COMPLETE As-Built/Record Drawings Building Information Models (BIM) Total Classroom Door Count: 3,300 Doors (e.g., Classrooms, Lecture Halls, Studios, Labs)

CURRENT PROGRESS, CONT. BOND PROGRAM- DOOR LOCK & BLDG. ACCESS 4. Field Verifications– In Progress Validate Quantity, Type, Condition & Location of All Doors/ Locks Identify Doors that Require Modifications

EXECUTION STRATEGY BOND PROGRAM- DOOR LOCK & BLDG. ACCESS Phase I Lock Replacement “Not Requiring” Door Modifications Phase II Lock Replacement “Requiring” Door Modifications Electronic Access Control (Exterior Doors)

PHASE I – DOOR LOCK REPLACEMENT BOND PROGRAM- DOOR LOCK & BLDG. ACCESS Timeline Estimated Budget: $2.8M (Rough Order Magnitude) Completion Schedule: Design – Fall 2018 Installation – Winter 2018/Spring 2019 GOAL: Install 70% of ALL Classroom Door Locks by April 2019 $1,100 per Door @ 2,500 Doors for design, installation, labor and hardware, DSA

PHASE II – DOOR LOCK REPLACEMENT & BLDG. ACCESS BOND PROGRAM- DOOR LOCK & BLDG. ACCESS Timeline Completion Schedule: Define Scope and Establish Budget- Summer 2018 Design – Fall 2018 to Spring 2019 Installation – Fall 2019

BOND PROGRAM- DOOR LOCK & BLDG. ACCESS ACTIVE DESIGN & CONSTRUCTION PROJECTS Projects in Design: Directing Architects to Revise Plans Projects in Construction: Evaluating Potential Change

QUESTIONS