QPS EVALUATION SERVICES INC.

Slides:



Advertisements
Similar presentations
SC 18 Ad Hoc Task Group API Staff Issues Ed Durante, Chair.
Advertisements

ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002 NON-CONFORMITIES AND EXEMPTIONS AERONAUTICAL STUDIES.
PPAP Requirements Training
Company Confidential Registration Management Committee (RMC) Other Party (OP) Assessor Workshop San Diego, CA January 20, AS9104/2 Oversight Process.
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Documentation Management Biosafety and Biosecurity Awareness Training For Afghan and Pakistani Bioscientists January 12-14, 2010 SAND No P Sandia.
The Quote Request Model Joanne Woytek. 2 Conference ‘11 Why Use the Quote Request Tool  Only recommended method for: Determining what is available on.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
COMPETENCY CERTIFICATION WITHIN THE INDUSTRY Hazardous Area Standardisation - A case study from Australia 3 What is Competency Competency comprises the.
Company Confidential Registration Management Committee 1 AS9104/1 Certification Structures - Client and CB Agreement July 17, 2014 Tim Lee Chair - IAQG.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Practical Use of the IECEx System & Schemes John Francis Waudby Senior Inspector of Electrical Engineering Mine Safety Operations.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Perform visual inspection tests.
1 IECEx and China’s Requirements Presented by Mr. Liu Weijun Chief Engineer Certification and Accreditation Administration of the People’s Republic of.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Provide a continuous supply of.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Proposition 1 Workshop: the Grant Application Process July 2015.
Webinar FSSC audit report 7th september 2015
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
94/9 requires an EC Type examination certificate Annex III Certificate and a QA-Notification (production audit Annex IV/VI/VII) Manufacturers need for.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Safety of Electrical Products and the IEC Conformity Assessment Schemes A presentation to Regional Workshop in Conjunction with COPANT May, 2004.
Federal Service for Environmental, Industrial and Nuclear Supervision LEGAL REQUIREMENTS ON EXPLOSION PROTECTED EQUIPMENT FOR THE GAS AND PETROLEUM ACTIVITIES.
DIA ERS SIAC IND CMC eCTD Submissions Part II – IND to NDA
IECEE CB-FCS Full Certification Scheme
IECEE CB-FCS Full Certification Scheme
IECEE Factory Surveillance Service (FSS)
NON-CONFORMITIES AND EXEMPTIONS AERONAUTICAL STUDIES
Jim Munro Chairman IECEx Panel of Assessors
IECEx Rules, Procedures and Reports
a Certificate of Conformity
ExTAG Training Workshop Calgary 2012 QAR related Issues
THE IECEx SCHEME IN CANADA Canadian Regulations and Access to the Market Presented by : Dave Adams, Technical Advisor, CSA International Welcome to the.
Jim Munro Chairman IECEx Panel of Assessors
IECEx Industry Seminar Integrating IECEx and ATEX for Europe
Evolution of the IECEx Scheme – Ex TAG Training Workshop Shanghai
TA/GA Orientation Fall 2017 Department of Aerospace Engineering.
with Audrey Turley, B.S., RM (NRCM), CBA (ASQ)
Michel BRENON IEC ExTAG Secretary
Introduction of ISO/IEC 17065: 2012
Acceptance Process for Manufactured Products by Certification:
Duck, Duck, Goose Keeping your IRB Ducks in a Row
Jim Munro Chairman IECEx Panel of Assessors
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
IECEE Factory Surveillance Service (FSS)
IECEx Budapest 2003 Meetings Mr. Chris Agius, Secretary IECEx
ISO 9001 Awareness Training.
SCD Grants & Contracts Policy & Procedure 670.
IEC and Information Technology
IECEE Factory Surveillance Service (FSS)
Engineering Waiver Management
IECEx Assessment Processes - IECEx Melbourne
IECEx MC WG07 Report WG07 – Working Group on the introduction of an IECEx Mark of Conformity Timothy Duffy Rockwell Automation Convenor – ExMC WG07.
COMP390/3/4/5 Final Year Project Design
Standard Operating Procedures and Termination Procedures
Management Verifications & Sampling Methods
IECEx ExTAG Training Workshop 29th September
AS 9100 Awareness Training.
On-Line Certificate System
Sub-contracting by ExTLs
Jim Munro Director TestSafe Australia
9-3 Applying for Employment
USOAP Continuous Monitoring Approach (CMA) Workshop
Presentation transcript:

QPS EVALUATION SERVICES INC. IECEx process for exchange of ExTRs among ExCBs Information required Customer/Manufacturer expectations Review of experiences ExTAG Workshop, Calgary September 3rd, 2012 Dave Adams, Manager Haz Loc Depart

Why we’re talking about it The effective exchange of ExTR packages between Issuing and Receiving ExCBs is essential to the manufacturers to obtain multi-country or multi-regional certifications based on a single test program and single submission of samples. This makes the Scheme the Scheme!

How to do it To accomplish this IECEx System objective, ExTR documents need to be developed and maintained in a timely and user-friendly fashion, and ExTR packages need to be compiled and approved by the Issuing ExCB with enough detail to clearly support all technical decisions. The bold section is the main issue with any ExTR exchange

Reference Documents OD009: Procedures for the Issuing of IECEx Certificates of Conformity, IECEx Test Reports and IECEx Quality Assessment Reports OD010-1: Guidance for the development, compilation, issuing and receipt of ExTRs. Part 1: Development and posting of blank IECEx Test Report (ExTR) Documents OD010-2: Guidance for the development, compilation, issuing and receipt of ExTRs Part 2: Procedures and guidance OD017: Drawing and documentation Guidance for IEC Ex Certification – for use by Manufacturers and ExTLS For our purposes, OD010-2 is the main document. OD009 (Section 2) gives guidance on the main steps required to issue and ExTR, from initial Application to issuing the ExTR OD010-1 gives guidance on development and posting of blank ExTR forms

The Process In theory the process is quite simple; The manufacturer obtains an ExTR from the ExCB of their choice (the “Issuing ExCB”) The manufacturer submits this ExTR to an ExCB in another member country (the “Receiving ExCB”) to obtain National or regional Certification of that member country The Receiving ExCB reviews and accepts the ExTR, applies any National Differences and issues the National /Regional Certificate

The Process If there are issues with the ExTR the Receiving ExCB does NOT contact the manufacturer, but rather contacts the Issuing ExCB. All efforts shall be made to resolve any issues between the Issuing and Receiving ExCBs, without involving the manufacturer. Where this is not possible, the Issuing ExCB shall contact the customer to resolve the issue with the original ExTR.

Manufacturer’s Expectations That the ExTR will be accepted by the Receiving ExCB, And; Either: The included National Differences Report will be accepted by the Issuing ExCB, or; The manufacturer is made aware of the National Differences and that the Receiving ExCB must complete this assessment. That the National or Regional Certificate will be issued in a reasonable amount of time and without major issues.

Our Main Issue ExTR packages need to be compiled and approved by the Issuing ExCB with enough detail to clearly support all technical decisions.

The Goal The Receiving ExCB should be able to completely determine compliance with the Standards listed with only the following documents; The Complete ExTR Package; Specifically; The Ex Test Report (ExTR) including Checklists The Certification Documentation listed in (or attached to) the ExTR

The ExTR Package The ExTR Package must be consistent and completed as per OD010-2 It provides guidance on exactly how to complete; The ExTR Cover Page, ExTR Test Report including Checklists, ExTR of National Differences, ExTR Addendum, ExTR of Partial Testing and Receipt

ExTR Test Report and Checklist Must be completed as per OD010-2, Section 2.4 Ex Test Reports The “Verdict” Column Every clause requiring a verdict must be completed Acceptable Verdicts are either “YES” or “NA”

ExTR Test Report and Checklist The “Result – Remark” Column For every clause requiring a verdict the “Result - Remark” column can/should be utilized to; Reference applicable manufacturer’s drawing(s) or component specification data sheets Reference internal ExCB test report(s) or other documents Reference Attachments and Annexes to ExTR Summarize test conditions and/or test results Clarify which equipment feature being referenced Provide justification for waiving requirements Etc. All ExTRs forms are WORD documents; any cell in the checklist can be expanded to fit all required comments

ExTR Test Report and Checklist The “Storybook Report” Used for IS evaluations – IEC 60079-11 Can also be used for equipment “families”, multiple methods of protection, and complex equipment or systems Basically a recapitulation of the information contained in the Certificate with an expanded “Description of Equipment”, “Markings” and “Summary of Tests Performed” sections Supplements the Ex Test Report and Checklists

Manufacturer’s Certification Documents The Certification Documentation must be as per OD017 for the applicable method(s) of protection They must “give a full and correct specification of the explosion safety aspects of the electrical equipment” (IEC60079-0, 6th Ed, Clause 24) With properly completed Certification Drawings, there is no need to include the various component/material spec sheets in the ExTR (they must be retained in the project files)

Recommendations Read and know OD010-2 and OD017 Complete the ExTR Package as per OD010-2 Ensure customer documents are as per OD017 Use the “Result – Remark” column to give complete details Use the “Storybook” Report where useful Include Attachments and/or Appendixes as necessary

Recommendations The test engineer, the ExTL Reviewer and the ExCB Reviewer must all keep this in mind – ExTR packages need to be compiled and approved by the Issuing ExCB with enough detail to clearly support all technical decisions.

Conclusion The following is required for a “Complete ExTR Package”, which should be acceptable to a Receiving ExCB under review; The ExTR Package is completed in accordance with OD010-2 Checklist “Result – Remark” columns fully completed The Manufacturer’s Certification Documents are in accordance with OD017 Storybook Report included, as necessary

Discussion Questions or Comments? Other ExCB experiences

The End? Dave Adams, P. Eng. Manager, Hazardous Locations Department QPS Evaluation Services Inc. Email:  dadams@qps.ca Web:  www.qps.ca Office: 1-587-351-3000 Mobile: 1-780-224-4414 Fax: 1-587-351-3001