Lesson Four: Flood Response Methods

Slides:



Advertisements
Similar presentations
1 Because Emergencies Dont Wait For Ideal Conditions….
Advertisements

FlexibleRobustReusable Flood Fighting Barriers The Problem $5.3 Billion damage caused by flooding each year in USA $5.3 Billion damage caused by flooding.
National Guard Engineering Education. General Levee Information Levees are the most widely used method of flood control The most extensive levee systems.
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Sandbagging Techniques
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
CONSTRUCTION OF SOIL NAILING WALLS
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~Eleanor Everet.
Chapter 3 Measuring Excavation and Sitework
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Levee Seepage: Concerns, Evaluations, and Solutions Pete Nix, P. E
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
Evolution of the Williston Basin Drilling Pad ;. Drilling Pad What affects a drilling pad Types of pads in North Dakota Advances in pad construction.
©1994 Quark Management Service 1 Flood Control Procedures.
Foundation Systems.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
MAINTENANCE PART 2. Inlet free of obstructions Inlet free of obstructions Adequate scour protection provided.
PPT Installing Dry Stack Stone 1 PPT PROCEDURES TO INSTALL DRY STASCK STONE.
Chapter 18 Foundations.
9-1 Project 1. Purpose To determine which type of material (interlocking brick, wood, nothing, or aluminum cans) when arranged as a retaining wall will.
2009 Annual Conference September 22, 2009 Tom Skebey, CFM.
Preparing Foundations for Cylinders & ASME Tanks
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
BUILDING STRONG SM Portland District Flood Damage Reduction Making Stormwater Management Systems Reduce Flood Damages D. Leslie Miller, P.E. Flood Preparedness.
Duncan Flood Event – Lessons Learned Public Safety Department.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
COFFERDAMS.
International Levee Handbook Overview of the handbook Chapter 6 – Emergency Management and Operations.
Construction Inspection for FO Activities - Geosynthetics
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Flood Control Procedures
Foundation – jay Desai.
Concrete Repair.
Piling.
Substructure Groundworks - Hazards
Potential Pollutants Sediment Chemical N, P, Pesticides, Oil & Grease
Wave action and coastal landforms
Chapter 3 Lesson 1 The Erosion-Deposition Process.
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
Objectives Upon completion of this module you should be able to:
WATER AND VEHICLES DO NOT ALWAYS MIX
Learning Objectives I can construct and organize data into tables.
Essentials of Fire Fighting
Planning and Placing Concrete
B.V.Patel Institute of Technology-Diploma studies
Unit 1 Lesson 3 Erosion and Deposition by Water
CT Reinforced Earth Structures
WATER AND VEHICLES DO NOT ALWAYS MIX
EROSION.
4th Annual Construction Law Summit
The Role of Technology and Human Interventions In Destructive and
Building Construction I Sofia Sebastian 1
Constructive and Destructive Forces Review
Lesson Seven: Flood Works Monitoring
Site Plan Requirements
Stability of Slopes By: Alka Shah Civil Engineering Department
How can you reduce radon in a home?
EROSION.
Section 5.3.
Earth and Space Science
TEKS 5.11A The student knows that certain past events affect present and future events. The student is expected to identify and observe actions that require.
Commercial Foundations
Unit 1 Lesson 3 Erosion and Deposition by Water
Road Design Standards for LGED
Competency: Draw Foundation Plans
Factors to Consider in Foundation Design Chapter # 02
Commercial Foundations
Hesco Bastions.
Presentation transcript:

Lesson Four: Flood Response Methods OBJECTIVE: Explain the advantages and disadvantages of expedient flood works

Supporting Objectives Describe various expedient flood works Identify four methods of capping a levee Identify the basic materials required for various methods of expedient flood control 2

Selection Variables Current and wave conditions Duration of water exposure Soil composition Terrain 3

Categories of Expedient Flood Protection Adding height to existing flood works Creating flood works in open areas Floodproofing structures 4

Placing Expedient Flood Works on Existing Levees (Capping) Build to 2 feet above predicted flood crest Place on the crown of the structure 5

Preparing a Levee for Expedient Flood Works Watertight bond Establish or verify gradelines Depressions restored to natural grade 6

Methods of Capping a Levee 7

Considerations for Selecting a Capping Method Expected crest and duration Current and wave conditions Time available for construction Available materials, equipment, and personnel Condition of the levee 8

Earthfill Relatively easy and fast Susceptible to erosion Restricted to 3’ 9

Sandbags Dependable and easily adaptable Resistant to wave actions and erosion Very labor intensive Relatively slow 10

Sandbag Expedient Levee

Filling Sandbags

Materials Required per 100' Sandbag Sandbags Materials Required per 100' Sandbag Expedient Flood Protection Height Sandbags Required Tons of Sand Required* Cu. Yd. Sand Required 1 Foot 800 13 8 2 Feet 2,400 41 25 3 Feet 5,000 84 52 4 Feet 8,800 147 91 5 Feet 13,600 228 141 6 Feet 19,500 327 202 *Wet sand weight, all figures rounded

Flashboards Used if required capping is: Greater than 1.5 feet Less than 3 feet Exposed to waves, currents, or erosion Useful on barrow crowns, limited space Costly to construct 17

Two Board Style Front View Side View

Three Board Style Front View Side View

Building Flashboards Drive the stakes Do not excavate holes Tamp all backfill firmly Use poly sheeting Use marine grade materials 20

Mudboxes Useful on narrow crowns Can add 6 feet of height Costly to construct Very labor and time intensive 21

Six Foot Mudbox

Considerations for Using Mudboxes Subject to erosion if waves overtop Erosion must be monitored and corrected Use marine grade materials 23

Expedient Flood Works in Open Areas Provides more space for floodwaters to fill May affect overall crest Keeps flood works away from current scour Lessens damage by floating debris 24

General Considerations Access and right of way issues Gradelines are difficult to establish and maintain Seal sewer lines and drain tiles 25

Open Area Expedient Flood Works Methods Flashboards and mudboxes Difficult to adapt to changing grades Sandbags Versatile, commonly used Very labor intensive Earthfill Fast and easy Subject to erosion 26

Constructing an Earthfill Expedient Levee Survey the area Build in one-foot increments Compact each layer Base is 4 times height (minimum) 27

Jersey Barriers Readily available materials Restricted to 3 feet Must use heavy machinery Used only on flat surfaces 28

Constructing a Levee Using Jersey Barriers Survey the area Use two rows of barriers side-by-side Stagger the joints between the rows Use tamped earth to fill in gaps Use polyethylene and sandbags to reduce seepage 29

Advanced Methods HESCO Bastion Concertainer® Rapid Deployment Flood Wall (RDFW®) Portadam® system 31

HESCO

RDFW

PORTADAM

Comparison of Advanced Methods Item Portadam Hesco Bastion Sandbags RDFW Construction man-hours 26.2 57.5 453.1 48.4 Fill 450 sandbags 91 cu yd 132 cu yd 85 cu yd Removal man-hours 12.6 36.3 3.5 113.4 Total man-hours 38.8 93.8 456.6 161.8 Reusability 100 % > 95 % 0 % > 90 % Materials cost $71,300 $26,398 $30,000 $151,525

Lesson Summary 36

How should local officials determine the best method of expedient flood works to use? 37

What are some considerations when selecting methods to cap a levee?

If wave action will be a concern, which capping methods would work best?

What are four traditional methods of capping a levee? 40

What basic materials are required to cap a levee using earthfill? Sandbags? Flashboards? Mudboxes?

Group Activity: Planning for a Flood Event