NedPower Mount Storm Project Update for Grant County September 25, 2007.

Slides:



Advertisements
Similar presentations
Planning For The Future Idaho Powers 2006 Integrated Resource Plan.
Advertisements

STÒRAS UIBHIST LOCH CARNAN COMMUNITY WIND FARM. Loch Carnan Community Wind Farm Iochdar Hill was deemed to be most promising due to: Strong low cost grid.
CURRENT LAND BANKING TRENDS. President Obama Commits $100 billion In Clean Energy Technology Clean Energy Is Foundation of Proposed Stimulus Creating.
1 Siting, Real Estate and Interconnection Issues for Wind Projects Tim Conboy IPED Financing Windpower May 8, 2008.
Community Wind Development
Report to Northwest Oil & Gas Forum Garfield County Fairgrounds, Rifle, CO | September 4, 2008 David Grisso, Operations Field Leader, South Piceance.
Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
FPUA Storm Readiness 2007 Florida Public Service Commission Internal Affairs May 23, 2007 Craig Brewer- Superintendent of Electric T&D.
JEA Storm Readiness 2006 Florida Public Service Commission Internal Affairs June 5, 2006 Presenter: Ted Hobson, VP, Fuels, Purchased Power & Compliance.
1 1 Dominion: New Directions in Energy. 2 2 Map excludes Cirro Energy and Peoples and Hope LDCs 1.7 million non-regulated retail customers in 12 states.
1 1 Dominion: New Directions in Energy. 2 2 About Dominion: Diverse Generation Mix Dominion Virginia Power.
KANE COUNTY DIVISION OF TRANSPORTATION STEARNS ROAD WETLAND MITIGATION SITE SECTION NO BR PRE-BID MEETING.
Solar Photovoltaic Power Stations. Fully Commissioned in Months Phased-In Generation Within One Month 99%+ Availability Offset Substation and Feeder Expansion.
Bill Murray Dominion November 8, 2010 Energy Panel.
Waste Coal Power Plants
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Gamesa Wind Activity in West Virginia West Virginia Wind Working Group October 14 th, 2008 Joshua Framel Senior Project Developer Philadelphia, PA.
Background to the Banks Group lEstablished in 1976 in the North East of England as a surface coal mining company with associated plant and transport business.
Invenergy S.B. 441 –Implications for Wind Energy West Virginia Wind Working Group – September 18, 2007.
Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
Dominion Update November Dominion: In Virginia Headquartered in Virginia  More than 9,000 employees in the Commonwealth  Annual Virginia payroll.
1 NEDPower Mount Storm Wind Farm Project Update 10/20/2009.
 Jeremy Turner, Executive Director Phoenix, Arizona May 21, 2010.
Simulation of Georgia Mountain Wind Project, Vermont (2.5 miles) Simulation by Saratoga Associates and Northeast Wind Wind Energy: Toward Building Consensus.
American Public Power Association The Challenge of Building a Coal Plant in Today’s Environment Raj Rao President, Indiana Municipal Power Agency Chairman,
Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.
Alternativenergy Flat Ridge Wind Facility Ted Hofbauer – Asset Manager.
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
Etowah County Alabama. Etowah County has been selected to be the first site in Alabama for a wind energy farm. Pioneer Green Energy is the developer The.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
Nuclear’s Role in the Clean Energy Mix The Energy Bar Mid-Year Meeting on Energy Markets, Renewable Energy and Change Washington, DC December 3, 2009 David.
Power Grid
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.

1 Broken Hill Solar Plant Community Information Session 1 July 2015.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Transmission interconnect into the existing ‘Durbin-Monterey’ 69kV line 
Project Oasis West Des Moines, Iowa Presentation January 30, 2013.
Harnessing the Wind – we’re #1!
Fire Island Wind CIRI, through its Fire Island Wind LLC subsidiary, is developing Southcentral Alaska’s first utility-scale wind project Aerial view of.
CIR I Wind Generation in Alaska: A Case Study Update on the Fire Island wind project.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
CPPP Stakeholder Meeting Springfield, Missouri November 18, 2010 Associated Electric Cooperative Inc.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
1 Integrating Wind Energy into the Electric Grid Wind Power Forum October 26, 2011 Brian Conroy, Electric System Engineering Central Maine Power Company.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
2009 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 6, 2009.
Wind Turbine Power Plant. Sources ●
Biomass Cogeneration Facility Savannah River Site Aiken, SC
AESO Update to PCC October 15, AESO October 2015 Update AESO currently developing 2015 Long-term Plan –Exploring low growth scenario corresponding.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Ocean Electric Power The Future of Marine Energy The Claverton Group Conference 24 October 2009.
Community Wind for Virginia
Wind Energy in Iowa Lori McDaniel
Akuo Energy USA NM EnergyPlex Conference
Four Corners Wind Resource Center Webinar
Dominion Overview.
Community Wind Development
WIND TURBINE GENERATORS.
2nd Annual Mason Energy Symposium Energy-Water Nexus Land-Based Wind
Mass Government Finance Officers Assoc
First Wind Northeast Transmission Overview
Dominion Investments in Virginia
COMMUNITY UPDATE OCTOBER 23, 2013
Lostock Sustainable Energy Plant (SEP) Local Liaison Committee
Chesterfield Neighborhood Coal Ash Update January 9th, 2019
Senator Dance Town Hall Coal Ash Update December 5, 2018
Lostock Sustainable Energy Plant (SEP) Local Liaison Committee
Presentation transcript:

NedPower Mount Storm Project Update for Grant County September 25, 2007

AGENDA Project Summary Project Location Photo of Completed Turbine at the Site [Agenda Item]

Project Summary 50 / 50 partnership between Shell and Dominion One of the best wind resource locations in the eastern United States Phase I – 82 turbines / 164 megawatts operational by 2 nd quarter 2008 – Fully permitted and under construction Phase II – 50 turbines / 100 megawatts operational by 4 th quarter 2008 – Pursuing final permits; engineering underway Phase I Turbines are currently being delivered and erected on site Expect to be tied to the 500 kV electric transmission grid by October 2007

Project Location Grant County, West Virginia. Mt. Storm Coal-Fired Station Phase I Site 164 MW 5500 Acres Phase II Site 100 MW ~2000 Acres Wind project site is located on a ridgeline approximately 2 miles east of Dominions Mt. Storm coal-fired facility

Photo of Completed Turbine at the Site