Discussion Session “Strawman” BCD  BCD (now)

Slides:



Advertisements
Similar presentations
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Advertisements

Nick Walker – GDE meeting Frascati Discussion and Approval of the BCD Nick Walker ILC-GDE Frascati –
How to Participate Today Open and close your Panel View, Select, and Test your audio Submit text questions Raise your hand Q&A addressed at the end of.
This session will resume in 15 minutes. This session will resume in 14 minutes.
Doc.: IEEE /0494r0 Agenda May 2015 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmc May 2015 Agenda Date: Authors:
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
Doc.: IEEE /0726r0 Agenda June 2015 Dorothy Stanley, HPSlide 1 IEEE TGmc July 2015 Agenda Date: Authors:
Session Leaders: Kristin Pierce, CTE Specialist Kelly Amy, CTE Specialist Elluminate Session #2 Volusia County Schools 200 N. Clara Ave. DeLand, FL
CISIP Writing Framework Approaches to Teaching and Learning Science and Writing.
ILC EDMS project suite Status Maura Barone GDE/Fermilab ILC Valencia - November 7, 2006.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
IEEE-SA Attendance Tracking Tool Project Wrap Up for 802 Implementation Dallas – November 2008.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Vancouver Linear Collider Workshop – 23 July 2006.
Anglophone West School District Education Council Sustainability Study – Bath Elementary and Middle Schools Executive Summary April 23, 2015.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Presentation of templates and supporting documents Anna Cook EGEE-II / EGEE II Transition.
List of Decisions #Decision for the Board 1 Does the Board agree to its composition? The Board requested that its composition be considered “proposed”
State Library Administrative Agencies (SLAA) FY2014 Changes to Survey Anna Sandoval Girón, Researcher Mengmeng Zhang, Research Associate American Institutes.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
6-7 April 06 MAC Review Global Design Effort 1 Configuration Control – Change Control Board (CCB) Report Nobu Toge GDE KEK.
Doc.: IEEE /1442r2 Submission December 2012 Marc Emmelmann, Fraunhofer FOKUSSlide 1 TGai Draft Review Overview Date: Authors:
Date Event Global Design Effort 1 CCB Report GDE Meeting, Vancouver, July, 2006 Nobu Toge KEK/GDE.
Lunch and Learn: Update on the Decommissioning of FEMA’s DFIRM Tools July 19,
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
1 Status of the BCD GDE Area System Leaders Meeting (Jan.19-20, 2006) Nobu Toge (KEK)
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Agenda items TEB activities at KILC TDR SVN repository roll-out
Executive Secretary Agenda Items November 2016 Plenary
Oct 22 Group Leaders Planning meeting
Executive Secretary Agenda Items November 2016 Plenary
Global Inventory of Statistical Standards
IFSP Aligned with the Early Intervention Data System
Status and Plan of GDE Design Work (Including Road Map for RDR)
Executive Secretary Agenda Items November 2017 Plenary
Technical Design Report preparation
TGu Timeline Date: Authors: March 2006 March 2006
Executive Secretary Agenda Items November 2016 Plenary
2013 WORLD GLAUCOMA CONGRESS July 17-20,
Preparation for New Curriculum Proposal System (CPS)
Action/ Deadline/ Event
March 2009 Closing Report for TGmb
Prop-50 IP Address Transfers
TGu Timeline Date: Authors: March 2006 March 2006
WELCOME TO PAIGNTON COMMUNITY & SPORTS ACADEMY
TGu Timeline Date: Authors: January 2005 January 2005
Please add the technical content of your presentation
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
TGu Timeline Date: Authors: May 2006 May 2006
Finalizing a Vision for a Caring School Community
PCS CONTENT ON CMS.
TGu Timeline Date: Authors: May 2006 May 2006
Your Affiliation (Logo) Here
LEVEL 1 PERSON CENTRED CARE
Ctclink executive leadership committee May 31, 2018
DR Session Introduction
Review plan of the nature reporting – update 6
IEEE TGmc Sept 2012 Agenda Date: Authors:
TGu Timeline Date: Authors: May 2006 May 2006
TGu Timeline Date: Authors: January 2005 January 2005
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
This session is being recorded
Presentation transcript:

Discussion Session “Strawman” BCD  BCD (now) Ownership of BCD  CCB They now take responsibility for the content changed and/or added. Final version by Bangalore at which point only formal change control requests. Responses to this Meeting Responses to written inputs, independent reviewers and inputs at this meeting will be recorded and posted by end of the year TeV Option - Alternative in the BCD, I will revise the text will explicitly reflect the intent to study the upgrade alternative (option 1) - design and cost 9-Dec-05 GDE - Frascati

Discussion Session: Problems New GDE Organization for RDR We need systems integration We need a single point of contact for each area, technical system and global group We need infrastructure / Tools – EDMS, management tools, etc We need the technical manpower to carry out the work of the area groups, technical systems, etc Problem -- Communications within and between board, area groups, EC, etc. GDE websites – please post minutes, technical notes, meetings, etc (Max will help) 9-Dec-05 GDE - Frascati

Discussion Session Communications: ILC NewsLine, postings on our website – give inputs Brochure, informational materials, etc Logo Venues / Dates of future GDE meetings Bangalore, India 9-11 March Vancouver, Canada 18-20 July Valencia, Spain 6-8 November 9-Dec-05 GDE - Frascati