1926 Subpart R Part I History of SENRAC

Slides:



Advertisements
Similar presentations
Fixed and mobile scaffolds
Advertisements

Construction Industry
Working Around/Under Loads
Steel Erection - OSHA’s First Negotiated Rule
New Rule for Steel Erection
1 The New Steel Erection Rule: Highlights. 2 Steel Erection Final Rule Published January 18, 2001 Implemented January 18, 2002 Includes exceptions for.
Steel Construction.
Steel Erection §1926 Subpart R Rev 1: 11/15/2012
OSHA’S NEW STEEL ERECTION STANDARD
Subpart R: Standard Overview
These materials have been developed based on applicable federal laws and regulations in place at the time the materials were created. The program is being.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Sub-Part M Fall Protection.
OSHA’s Fall Protection Requirements
Heavy Concrete Construction Formwork
Fall Protection Falls 4,628 fatal work injuries were recorded in the United States in deaths a week or 12 deaths every day 806 construction related.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Subpart R Steel Erection
SCAFFOLD SAFETY.
Skyscraper Construction
OSHA Office of Training & Education1 Cranes. 2 Major Causes of Crane Accidents Contact with power lines Overturns Falls Mechanical failures.
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
Safety : Scaffolds Introduction to Industrial Technology Spring 2014
Subpart R Steel Erection. Workers of the past were sometimes referred to as “Dare Devils.”
Chapter 3: Scaffold Safety
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Cranes and Slings 29 CFR and 184.
Crane & Hoist Training & Inspection Requirements Crane Safety.
Developed by Western Iowa Tech Community College This material was produced under a grant (SH20836SHO) from the Occupational Safety and Health Administration,
Most Frequently Cited Serious Violations Construction – FY 2008.
Walking-Working Surfaces and Fall Protection MODULE 9.
Fall Protection in the Roofing Industry
Safety for Working in High Places
Harwood Grant #46J6-HT13Southwest Safety Training Alliance Inc1 Module 2 Fall Hazards Did you know? Falls from elevation account for one third of all deaths.
FALL PROTECTION. WHY? –BECAUSE: Falls accounted for 10% of fatal work injuries in 1994 & Serious hazards can be present while above ground. –Examples:
Rev: Section 1 Overview of Fall Protection.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Appendices Subpart R Steel Erection
1926 Subpart R OSHA’s Steel Erection Standard Scope
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
Steel Erection These handouts and documents with attachments are not final, complete, or definitive instruments. This information is for guidance purposes.
Fall Protection Review. Objectives Increase management sensitivity on Falls safety Increase disciplined compliance to policies and procedures Increase.
Most Frequently Cited Serious Violations Construction – FY 2011 OSHA Federal Standards October 1, 2010 – September 30, 2011.
1 Falls Module 3. 2 DISCLAIMER This material was produced under grant number SH from the Occupational Safety and Health Administration, U.S. Department.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Cranes and Slings 29 CFR and 184
Fall Protection.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Most Frequently Cited Serious Violations Construction – FY 2009 OSHA Federal Standards October 1, 2008 – September 30, 2009.
Most Frequently Cited Serious Violations Construction – FY 2007.
Office of Safety & Health Consultation Office of Safety & Health Consultation presents Focus Four Fall Protection in Construction Focus Four Fall Protection.
The New Steel Erection Rule Developed by S teel E rection N egotiated R ulemaking A dvisory C ommittee (SENRAC) in 2001 Occupational Safety and Health.
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
Most Frequently Cited Serious Violations Construction 2000.
§1926 Subpart M Presented by: ETTA, OSH Division, Fall Protection in Construction.
This presentation was created by the N.C. Department of Labor for safety and health training. §1926 Subpart M Presented by: ETTA, OSH Division,
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
Excavation, Concrete, and Steel Erection OSHE 382, Spring 2016
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Steel Erection 29 CFR 1926, Subpart R
How to Survive OSHA’s Steel Erection Standard
Most Frequently Cited Serious Violations
Steel Erection - OSHA’s First Negotiated Rule
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
INTRODUCTION TO THE NEW SUBPART R
Steel Erection 29 CFR 1926, Subpart R
Presentation transcript:

1926 Subpart R Part I History of SENRAC Part II Highlights of proposed standard Part III If time permits overview of Directive

OSHA’s Steel Erection Negotiated Rulemaking Advisory Committee

What is SENRAC? The Steel Erection Negotiated Rulemaking Advisory Committee (SENRAC) consists of representatives of employers and employees that will be significantly affected by the proposed rule covering steel erection in construction. The Committee began negotiations in June of 1994.

Purpose of SENRAC The committee's purpose is to; - resolve issues - arrive at a consensus, and - develop a proposed rule governing steel erection.

Participation Appointees to the Committee include representatives from labor, industry, public interests and government agencies. Many interested parties have attended the public meetings and have participated in the workgroups established by SENRAC.

Members of the committee Army Corps of Engineers Ben Hur Construction Company Regional Administrator International Association of Bridge, Structural & Ornamental Iron Workers; International Association of Bridge, Structural & Ornamental Iron workers; El Paso Crane & Rigging, Inc.; International Brotherhood of Boilermakers, Iron Ship Builders, Blacksmiths, Forgers & Helpers; Network, Inc.; Building and Construction Trades Department (AFL-CIO) Black & Veatch; United Steelworkers of America; Gilbane Building Company; Williams Enterprises of Georgia, Inc.; Holton & Associates, Ltd.; CAL/OSHA; International Association of Bridge, Structural & Ornamental Iron Workers; International Union of Operating Engineers; National Institute for Occupational Safety and Health (NIOSH) C. Rockwell Turner-L.P.R. Construction Co.; National Erectors Association.

Highlights of OSHA’s New Proposed Steel Erection Standard 1926 Subpart R - Steel Erection

1926.750 Scope and Application

1926.750 Scope and Application (a) Scope Hazards associated with steel erection activities: Single & multi-story buildings Bridges Other structures where steel erection occurs

1926.750 Scope and Application (b) Application Hoisting Connecting Welding Bolting Rigging structural steel Steel joists and metal buildings Installing metal deck, siding systems Miscellaneous metals Ornamental iron Similar metals Moving point to point

1926.751 Definitions Controlling Employer

site-specific erection plan and construction sequence 1926.752 Site layout, site-specific erection plan and construction sequence

(a) Approval to begin steel erection (b) Site layout 1926.752 Site layout, site-specific erection plan and construction sequence. (a) Approval to begin steel erection Controlling employer Concrete curing (b) Site layout Access roads Work area properly maintained (c) Overhead protection Preplanned hoisting operation (d) Site-specific erection plan Employer elects to develop alternate means of protection

1926.753 Hoisting and Rigging

1926.753 Hoisting and rigging. (a) General (b) Working under loads. Pre-shift visual inspection of cranes (b) Working under loads. Preplanned routes for suspended loads Exceptions EE’s making initial connection Rigged to prevent material displacement (c) Multiple lift rigging procedure.

Pre Shift Visual Inspections

Pre planned routes for suspended loads Working under the load Pre planned routes for suspended loads

Exception to working under loads: riggers making initial attachments securing load Promotes crane safety by including elements of current ANSI B30.5 - 1994.

Multiple lift Two connectors were erecting lightweight steel "I" beams on the third floor of a 12-story building, 54 feet above the ground. One employee removed a choker sling from a beam and then attempted to place the sling onto a lower empty hook on a series of stringers. While the crawler tower crane was booming away from the steel, the wind moved the load line and stringer into the beam the employee was standing on. The beam moved while the employee was trying to disengage the hook, and fell to his death.

"Multiple lift rigging."

Rigging

1926.754 Structural steel assembly

1926.754 Structural steel assembly. (a) Structural stability shall be maintained at all times during the erection process (1) The permanent floors shall be installed as the erection of structural members progresses, and there shall be not more than eight stories between the erection floor and the upper-most permanent floor, except where the structural integrity is maintained as a result of the design. (2) At no time shall there be more than four floors or 48 feet (14.6 m), whichever is less, of unfinished bolting or welding above the foundation or uppermost permanently secured floor, except where the structural integrity is maintained as a result of the design. (3) A fully planked or decked floor or nets shall be maintained within 2 stories or 30 feet (9.1 m), whichever is less, directly under any erection work being performed.

1926.754 Structural steel assembly. (c) Walking/working surfaces. Tripping hazards Skeletal structural steel Coated steel

(d) Plumbing-up Connections used properly secured Removed only with approval of competent person

1926.754 Structural steel assembly(continued) (e) Decking. Hoisting, landing & placing of deck bundles Strapping Roof and floor openings. Space around columns. Floor decking. Derrick floors. Hoisting, landing & placing of deck bundles

1926.755 Anchor bolts

1926.755 Anchor bolts. (a) General requirements for erection stability. (b) Repair, replacement or field modification.

1926.756 Beams and columns

1926.756 Beams and columns. (a) General (b) Diagonal bracing Load shall not be released until final members secured by at least two bolts per connection, drawn wrench tight per project structural engineer of record (b) Diagonal bracing Secured by at least one bolt per connection

1926.756 Beams and columns. (continued) (c) Double connections at columns and/or at beam webs over a column Common connection holes

1926.756 Beams and columns. (continued) (e) Perimeter columns. (f) Perimeter safety cables.

1926.757 Open web steel joists

Steel Erection Operation An employee was assigned to connect the X-braces at the end of 40-foot long bar joists. Only one end of the bar joist he was working on had been welded. The employee was sitting on the unwelded end of the bar joist trying to connect the X-braces. He lost his balance, dislodging the bar joist from its end support, and fell approximately 24 feet to his death.

Steel Erection Operation Five iron workers were distributing 90-foot-long open web bar joists on a building under construction. The bar joists were supported by vertical columns spaced 30 feet apart. The steel columns were not framed in at least two directions and the bar joists were not field bolted to the vertical columns to prevent collapse. The bar joists shifted, causing the vertical columns to lean. This caused entire section of columns and pen web bar joists to collapse. Two employees rode the iron down. One was fatally injured and one received serious injuries.

1926.757 Open web steel joists (a) General. (b) Attachment of steel joists and steel joist girders. (c) Erection of steel joists. (d) Erection bridging.

Open web steel joists

Open web steel joists

1926.758 Pre-engineered metal buildings

1926.758 Pre-engineered metal buildings Erection shall not begin until site has been completed Anchored by minimum of 4 anchor bolts Rigid framed - 50 percent bolts installed

Falling object protection. 1926.759 Falling object protection.

1926.759 Falling object protection (a) Securing loose items aloft. (b) Overhead protection.

Falling objects

1926.760 Fall protection

No can do??

1926.760 Fall protection (a) General requirements. (b) Connectors. (c) Controlled decking zone (CDZ). (d) Covering roof and floor openings. (e) Custody of fall protection.

Fall protection

Connectors

Fall protection

Fall protection

Controlled Decking Zone (CDZ) None

1926.761 Training

1926.761 Training (a) Training personnel. (b) Fall hazard training. (c) Special training programs.