ATLAS Muon Spectrometer and

Slides:



Advertisements
Similar presentations
E.K.Stefanides March 07, The Muon Spectrometer of the ATLAS detector: progress report on construction and physics studies at the University of Athens.
Advertisements

D. Peterson, Muon Spectrometers at ATLAS and CMS, presentation to LEPP 19-Nov  spectrometers at ATLAS and CMS Our charge: Survivability Resolution.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
LHeC : Muon Systems L. Pontecorvo.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
The digitization procedure occurs separately for each Muon technology, MDT, CSC, RPC and TGC. Here the main steps of each MuonHits to Muon Digits conversion.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Muon System and Physics Performance Ludovico Pontecorvo CERN-INFN.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
Muon-raying the ATLAS Detector
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
CHEP07 conference 5 September 2007, T. Cornelissen 1 Thijs Cornelissen (CERN) On behalf of the ATLAS collaboration The Global-  2 Track Fitter in ATLAS.
M. Bianco On behalf of the ATLAS Collaboration
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
ATLAS micromegas activities (MAMMA)
Luca Spogli Università Roma Tre & INFN Roma Tre
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Precision Drift Chambers for the ATLAS Muon Spectrometer
First CMS Results with LHC Beam
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
TeV muons: from data handling to new physics phenomena Vladimir Palichik JINR, Dubna NEC’2009 Varna, September 07-14, 2009.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Plots of RPC performance G. Cattani, University of Rome “Tor Vergata” & INFN Roma 2 on behalf of ATLAS Muon Collaboration.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
HEP 2007 – 20 Jul 2007 · Manchester, England Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer F.Petrucci INFN Sezione di Roma Tre and Dipartimento.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
(University of Sofia “St. Kliment Ohridski”)
Status of BESIII and upgrade of BESIII
DC56 R&D Goals, Schedule and Status
Production ad Quality control of RPCs for the CMS muon barrel system
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Atlas: Upgrade Phase I Massimo Della Pietra.
ATLAS-MUON Trigger hardware developments
China at LHC Institutional participation Resources of Fund
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
CMS muon detectors and muon system performance
IHEP group Shashlyk activity towards TDR
for the transition region on behalf of the RPC upgrade group
Commissioning of the MUON Spectrometers in ATLAS and CMS
The Compact Muon Solenoid Detector
Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack.
Multigap Resistive Plate Chambers for EAS study in the EEE Project
LHCb Muon Detector MWPC & GEM
BESIII RPC Detector Jiawen Zhang
Preparation of the CLAS12 First Experiment Status and Time-Line
ATLAS Silicon Tracker commissioning
Project Presentations August 5th, 2004
L H C A T L A S International Collaboration on the LHC Project
FCPPL 5th workshop 21 March 2012
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Pre-installation Tests of the LHCb Muon Chambers
Resistive Plate Chambers performance with Cosmic Rays
The CMS muon system performance
Presentation transcript:

ATLAS Muon Spectrometer and Chinese Activities Zhu Chengguang Shandong University First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

ATLAS Muon Spectrometer includes Magnetic system Precision chamber system MDT(Monitored Drift Tube), CSC (Cathod Strip Chamber) Trigger chamber system RPC(Resistant Plate Chamber), TGC (Thin Gap Chamber) First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Magnet System ATLAS MUON Spectrometer Field integral vs. eta for infinite momentum muons. Each curve corresponds to a fixed azimuthal angle. First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Precision Chamber ATLAS MUON Spectrometer Produced in IHEP MDT is made of Drift Tubes, Monitored due to its large size. 320000 tubes The longest drift time: 480ns, around 20 times of LHC bunch-crossing <σ>=80μm for signle tube Dead area in between neighbour chambers for barrel, longest as 1700mm Produced in IHEP First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Muon reconstructed in simulation ATLAS MUON Spectrometer Muon reconstructed in simulation endcap η Sector number  9 11 13 15 1 3 5 7 9 barrel endcap φ First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

ATLAS MUON Spectrometer CSC is MWPC with <σ>=80μm spatial resolution 32 Chambers – 16 chambers per side, covering 2<|η|<2.7 of inner EC Layer max drift time 25ns+ 2nd coordinate measurement itself; Inclined to interaction point First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Muon momentum measurement ATLAS MUON Spectrometer Muon momentum measurement Single muon Pt resolution (simulation) Inner tracker Muon spectrometer First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

ATLAS MUON Spectrometer F. Cerutti, muon week Nov 2006 ATLAS MUON Spectrometer Blue not installed Red installed Violet : partly installed Side A Side C 8 7 6 5 4 3 2 10 11 1 16 15 14 13 12 9 8 7 6 5 4 3 2 10 11 1 16 15 14 12 9 Chamber testing underway: HV, gas tightness, alignment, DCS… Full commissioning up to cosmics only in sectors 13 (part of the chambers) Total Missing chambers :126/680 ~ 19%, 2~3 months of work needed First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Last MDT Sector (Endcap)Assembled ATLAS MUON Spectrometer Last MDT Sector (Endcap)Assembled Secor installation and service system commissioning is planned for early next year from S. Palestini First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

CSC Integration and testing ongoing at CERN (B184) ATLAS MUON Spectrometer CSC Integration and testing ongoing at CERN (B184) Mechanical integration with support frames & electronics testing underway and is 32/32 complete Global alignment fixtures to be integrated with chambers Surface Installation will take place from F. Tylor CSC Integration in B184 First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Trigger Chambers ATLAS MUON Spectrometer Time resolution is better than 25ns Provide second coordination measurement for MDT SM TGC only provide second coordination measurement Produced in SDU First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Trigger scheme ATLAS MUON Spectrometer triplet TGC doublet TGC doublet RPC Trigger scheme:Pivot station  Intersecting points  Coincidence window First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

TGC assembly status ATLAS MUON Spectrometer in the pit complete stored / final test being assembled components at CERN components to be delivered Legenda: TGC 1 – C in the pit TGC 2 – C complete TGC 3 - C TGC 1 - A TGC 3 - A TGC 2 - A TGC-C-3 completed in Dec.; TGC-A-1 and TGC-A-2 started and will be stored First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

ATLAS MUON Spectrometer First TGC Big Wheel has been installed First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Chinese activities on Muon Detector Production IHEP: 32 MDT chambers of type BEE and 16 chambers of type BIS.8 SDU: 400 TGC chambers USTC: Testing of all TGC front-end electronics First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Chinese Activities Chinese Activities In Nov. 1999,a memorandum of understanding was made between CERN and NSFC( Natural Science Foundation of China), declaring that China participates the ATLAS and CMS collaboration Institute of High Energy Physics (IHEP), Nanjing University (NJU), Shandong University (SDU), University of Science and Technology of China (USTC) joined the collaboration as Chinese Cluster. Supports also came from Ministry of Science and Technology of China and Academy of Science of China. First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Mar. 2004, site review was held in IHEP Chinese Activities MDT production(IHEP) Mar. 2004, site review was held in IHEP First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Mass production Chinese Activities First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

MDT mass production Chinese Activities wire position scan The precision of wire position is required to be 20m Measurement of wire position  rms of 7.5 µm wire position scan Rejection rate  1% First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Production task status Chinese Activities Production task status Until early 2006, production was complete, and all were transported to CERN for testing with X-ray tomography。  Qualified tubes ~99%.  Assembly qualities were well under control. First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Integration & Commissioning Chinese Activities Integration & Commissioning Gas system:gas distribution system, gas leak test; Control system:temperature sensor, magnet sensor, alignment system; electronics:HV, readout,shielding; Cosmic ray test:noise、efficiency,timing; Gas system testing Electronics testing First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Design of installation for BEE Chinese Activities Design of installation for BEE  Improvement of installation structure ;  Design of installation of service system ; Installation of magnet sensor First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Site review was held in Sep. 2002 Chinese Activities TGC Production (SDU) Site review was held in Sep. 2002 First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Mass production of TGC Chinese Activities First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Detector production vs Time Chinese Activities Detector production vs Time First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Quality Control Chinese Activities Flatness control of chamber Resistance control of cathode plane 0.5~1.5MΩ Flatness control of doublet First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

TGC HV training Uniformity test Chinese Activities Check the electronic performance of channels automatically with cosmic rays The uniformaty test system produced by USTC is used at CERN for certification of all TGCs after transportation. First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Efficiency Scan Chinese Activities 4 scans for wire and strip each doublet Color with low efficiency corresponding to supporters White with excellent efficiency First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

ATLAS-MUON leader G. Mikenberg on Dec. 17, 2004 Chinese Activities ATLAS-MUON leader G. Mikenberg on Dec. 17, 2004 ……… “…(tested) 98 doublets (196 chambers), … have excelled in all aspects; in particular, …the inefficiency area never exceeded 1% (the qualification criteria has been set at <5%) and all the detectors have pass the radiation test without any need of training. This is indeed an outstanding performance … By the end of 2004, all chambers were compeleted and transportation to CERN finished in 2005 A team consisting of 3 engineers from SDU is working on the TGC commissioning at CERN now First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

TGC frontend electronics test (USTC) Chinese Activities TGC frontend electronics test (USTC) USTC designed an automatic testing system for the TGC frontend readout card: ASD(Amplifier Shaper Discriminator) Finished the test of all 25000 ASDs By the way: NJU produced 330 copper absorbers for the endcap calorimeter. First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13

Summary Muon spectrometer commissioning goes well, some in advance. Chinese cluster was involved late, but did good work and made contributions. First Chinese-French Workshop Zhu Chengguang Beijing 2018/11/13