The Ladybird ( th Street NW)

Slides:



Advertisements
Similar presentations
THURSTON REGION MULTIMODAL TRAVEL DEMAND FORECASTING MODEL IMPLEMENTATION IN EMME/2 - Presentation at the 15th International EMME/2 Users Group Conference.
Advertisements

Emphasizing TDM in Transportation Planning Asher Mercer TDM Summit November 18, 2009.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Oakland Industrial Park Transportation Needs Assessment Study Sponsored by A service of Hampton Roads Transit Prepared by THE MARKETING SOURCE,
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
MD 22 MULTIMODAL CORRIDOR STUDY. MD 22 MUTIMODAL CORRIDOR STUDY Purpose: Investigate and identify feasible and cost efficient transportation and safety.
GREATER NEW YORK A GREENER Travel Demand Modeling for analysis of Congestion Mitigation policies October 24, 2007.
Juneau Downtown Tourism Transportation Study May 27, 2003.
Advancing Active Transportation In Toronto ACT Canada Sustainable Mobility and Healthy Communities Summit December 2, 2014 Carol Mee, Toronto Public Health.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING April 16, 2014|3:00PM -5:00PM | ROOM 1E-108.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Wimbledon Station - a station fit for Chris Chowns (Principal Transport Planner) Nick Greenwood (Transport Planning Manager) LB of Merton Transport.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
Junction 25 Business Travel Network Launch Event 19 TH November 2009.
1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development.
CBD Curbspace & Multimodal Decision Framework Study Seattle Planning Commission Meghan Shepard, Michael James November 13, 2014.
Metrobus 30s Line Study Improving Your Customer’s Transit Experience Virginia Transit Association May 20,
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
2030 Mobility Plan City of Jacksonville Planning and Development Department January 2011.
Public Consultation A RE YENG REVIEW LINE 2B 13 August 2015.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
The Bikers Convention By David Wilson Maintenance Officer.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014.
Traffic Flow Parameters Surface Street Application.
Phase 2: Data Collection Findings and Future Steps.
Urban Studies CGC1D. What’s Happening in this picture?
Transit Pricing Programs Value Pricing for Transportation in the Washington Region June 4, 2003 Richard F. Stevens Washington Metropolitan Area Transit.
BADBURY PARK, SWINDON MANAGING RESIDENTIAL GROWTH.
Florida’s First Eco-Sustainable City. 80,000+ Residential Units 10 million s.f. Non-Residential 20 Schools International Clean Technology Center Multi-Modal.
Village of Palmetto Bay
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Priority Development Areas Ursula Luna-Reynosa, Economic Development Director David Kleinschmidt, Public Works Director November 3, 2011.
TDM - Vancouver Experiences Strategic Transportation Planning, Sustainability Group TDM - Vancouver Experience October 21 st ACT TDM Summit 2008 Jo Yee.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
Counting that Counts: Bike and Pedestrian Documentation.
From Here to There: Transportation Demand Strategies to Support the Grounds Plan at the University of Virginia Presented by Chris Conklin, P.E.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Smyrna’s Major Thoroughfare, Bicycle, and Pedestrian Plan TOWN COUNCIL RETREAT APRIL 14, 2015.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Commission on Improving the Delivery of Transport and Pedestrian Infrastructure  Dealing with Traffic Growth &  Considering the needs of all Road Users.
Transportation Modeling Options for City Departments LSA Associates, Inc. City of Fort Collins January 2001.
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Jeremy Area Transportation Plan
General Manager Logistics Systems UK
Travel and Transport Review Update
Citilabs’ Sugar Analyst – Measuring Accessibility
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
Transportation Makes a Difference
Transportation Management Plan Modernization Project
Transportation Makes a Difference
Ventura County Traffic Model (VCTM) VCTC Update
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
Travel Demand and Traffic Forecasting
Methodology and Results
Proposed Driscoll Expansion Brookline, Massachusetts
Managed Parking solutions
Design Standards.
Urban Studies CGC1D.
Colorado Avenue University of Colorado, boulder
Utility Relocation: 11th/Mill
Naval Complexes Meeting April 15, 2019
Presentation transcript:

The Ladybird (4330 48th Street NW) Transportation Presentation November 9, 2016

Site Location The Ladybird (4330 48th Street NW) - Transportation

Local Transit Facilities The Ladybird (4330 48th Street NW) - Transportation

Project Transportation Characteristics Proximity to transit and alternative travel modes: Nearby Tenleytown-AU Metrorail Station (0.8 miles away) 2 Nearby Metrobus routes Site has Walkscore of 77 “Very Walkable” and Bikescore of 65 “Bikeable” Census Data 46% drive to work 27% take transit to work 5% cycle to work 8% walk to work 14% other (work from home/retired/other) Implementation of on-site pedestrian, bicycle, & loading facilities The Ladybird (4330 48th Street NW) - Transportation

Site Plan The Ladybird (4330 48th Street NW) - Transportation

Potential Grocery Market Area The Ladybird (4330 48th Street NW) - Transportation

Parking - Direction of Approach The Ladybird (4330 48th Street NW) - Transportation

Project Traffic Generation Residential: AM Peak Hour: 12 inbound/ 46 outbound PM Peak Hour: 47 inbound/ 26 outbound Grocery (Portion of trips intercepted from Massachusetts Avenue): AM Peak Hour: 82 inbound/ 51 outbound PM Peak Hour: 177 inbound/ 170 outbound The Ladybird (4330 48th Street NW) - Transportation

Potential Traffic Mitigation Strategies Signal timing adjustments Physical traffic signal modifications Mid-Block Massachusetts Avenue Crossing & HAWK Signal Pedestrian improvements & upgrades (mid-block crossing & signal) Loading Management Plan Construction Traffic Management Plan Transportation Demand Management Plan Residential elements Grocery employee elements The Ladybird (4330 48th Street NW) - Transportation

END The Ladybird (4330 48th Street NW) - Transportation

Trip Generation The Ladybird (4330 48th Street NW) - Transportation

Truck Turning Diagrams – WB-30 Inbound The Ladybird (4330 48th Street NW) - Transportation

Truck Turning Diagrams – WB-30 Outbound The Ladybird (4330 48th Street NW) - Transportation

Truck Turning Diagrams – WB-50 Inbound The Ladybird (4330 48th Street NW) - Transportation

Truck Turning Diagrams – WB-50 Inbound The Ladybird (4330 48th Street NW) - Transportation

Truck Turning Diagrams – WB-50 Outbound The Ladybird (4330 48th Street NW) - Transportation

Truck Turning Diagrams – WB-50 Outbound The Ladybird (4330 48th Street NW) - Transportation