Project Management Basics

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT for CONSTRUCTION
Advertisements

Key Concepts: Definition of a Project Characteristics of a Project
HIGH PERFORMANCE MANAGEMENT CONFERENCE PROJECT MANAGEMENT
Free Powerpoint Templates Page 1 Free Powerpoint Templates Introduction to Project Management What is a Project? Project Life Cycle Project Management.
Project Management Concepts
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Sylnovie Merchant, Ph.D MIS 210 Fall 2004 Lecture 1: The Systems Analyst Project Management MIS 210 Information Systems I.
Project Management “Introduction to Project Management: Tools, Techniques, and Practices” BA 320 Operations Management.
Software Project Management By Assistant Prof. Samana Zehra
Project Management Education
Project Management for Purchasing Managers Paul Lewis MA, MBA, PMP ® Manager, Project Management Office February 11, 2010 / NAPM-Utah.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Mani Subramanian. What is Project? is a temporary endeavor with a beginning and an end. Delivers Unique Product, Service or result.
BISM 8470 Issues in IRM Topic: Software Project Management.
Project Management Training
ECE2799 Project Management Prof. Mazumder Prof. Bitar Updated 3/18/2016.
IT-301 Project Management I: Unit 4: Cost Management.
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
Introduction to Project Management Project management.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
+ CIW Lesson 10 Part A. + IT Project and Program Management Successfully managed IT projects increase productivity and increase profits IT projects differ.
Controlling Chaos Project Management to the Rescue.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
COMP201 Project Management.
Project Management.
Chapter 11 Project Management.
Project Management Business Management.
Chapter 33 Estimation for Software Projects
Project Cost Management
Stacy Kowalczyk WIC Technical Hour 3/30/2005
Project Management Methodology Used in Responding to Publishers’ Surveys Presenters: Jay Johnson, Institutional Research and Planning Liana Crisan-Vandeborne,
Project Management What is Project Management?
8.04 Utilize project-management skills to start, run, and end projects
February 23, 2017 Luncheon.
Introduction Project Management.
INSTITUTE OF PROFESSIONALS Professional Body Approved by the Professional Bodies Act 1973 (NRCD 143) as a Chartered Body for Project Management Professionals.
Systems Analysis and Design in a Changing World, 4th Edition
Overview of Project Planning
Assistant Professor of Computer Science Washington State University
Software Project Management
Project Management and Information Security
Project Management Framework
“Core project management knowledge areas & tools”
Project Management.
The value of a project-oriented approach to IT and how we do it in IBM
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
Introduction to Project Management Avneet Mathur
Software Project Planning &
Project success and failure factors
Software Project Management
Project Management Complexity, Risks, Failure and Technology
Project Theory and Application
Project Management.
Project Management Framework
Chapter 33 Estimation for Software Projects
Introduction Project Management.
P ROJECT M ANAGEMENT Skills.
Introduction Chapter 1 Copyright ©2016 Pearson Education, Inc.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
Roles and Responsibilities of a Project Manager
Defining project management
CBGD: Nguyễn Thanh Tùng
Chapter 26 Estimation for Software Projects.
Introduction to Project Management
Planning for Design Project
Driving Successful Projects
PROJECT PLANNING AND SCHEDULING BY: AMINATH SHAAYAN SHAHID.
Presentation transcript:

Project Management Basics What is PM? Why is PM important? Phases of PM Compiled by: Alex J. Ruiz-Torres, Ph.D. From information developed by many.

What is PM? What is a Project? a set of tasks/activities that in combination will result in an important output/product, requiring significant amounts of time. Definitions from the Project Management Institute (PMI): A project is temporary in that it has a defined beginning and end in time, and therefore defined scope and resources. And a project is unique in that it is not a routine operation, but a specific set of operations designed to accomplish a singular goal. https://www.pmi.org/about/learn-about-pmi/what-is-project-management

What is PM? Projects characteristics: Result in unique products Temporary as there is a start and end for a project Cross-functional as they require resources with a variety of expertise areas Deals with uncertainty including changes in requirements (the goal of the project may change some), time delays, and changes in the resources among others.

What is PM? What is Project Management? the planning, directing, and controlling of the resources (people, equipment, material) needed/used to meet the technical, cost, and time constraints of a project. From the PMI: Project management, then, is the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements.

Why is PM important? Projects are an essential element of any business, required in efforts such as: Product development Process change and improvement New technology adoptions Expansion and globalization efforts Project management as a management discipline underpins much economic activity. In industries as diverse as pharmaceuticals, software and aerospace, projects drive business. And in the public sector, it is effective project management that translates politicians' promises of new roads, schools and hospitals into gleaming new constructions that improve everyday life. - Dr Malcolm Wheatley BSc (Econ), MA, MBA, PhD

Phases of PM Phase 1: Design and Planning Outcome: what is the product/goal this project will achieve? Implement a new computer system Increase product yield by 10% Open a restaurant in Miami Define Tasks: a description of the specific activities required to achieve this goal. Develop process flowchart Analyze data on returns Implement …

Phases of PM Phase 1: Design and Planning Develop the Work Breakdown Structure This is a multi-level description of the tasks. Based on their complexity, split into more detailed descriptions. Project Task 1 Task 2 Task 3 Subtask 1.1 Subtask 1.2 Subtask 3.1 Subtask 3.2 Subtask 3.3

Phases of PM Phase 1: Design and Planning Get project approved! For each task the following must be established: Task time : estimate of the task duration. Dependencies: how activities relate to each other. For example, columns must be built before roof. Some activities can occur in parallel. Resources: what resources are required to complete the task Cost: how much in terms of resources, materials,… Using the per task information generate overall estimates for the project time and cost Get project approved!

Phases of PM Phase 2: Monitor and Control The project manager (PMr) must continually monitor the performance of the project and its resources. Is the quality of the completed tasks as expected? Are the activities being completed on time? Are the tasks costs within their budget? Will the project be completed on time?

Phases of PM Phase 2: Monitor and Control The PMr must communicate these metrics to the project stakeholders Internal and external groups affected by the project for example project resources, upper management, customers, suppliers, …

Phases of PM Phase 2: Monitor and Control The PMr continuously controls the assignment of resources and re-scheduling of tasks Some tasks could be performed by a set of resources. The PMr must determine what resource will do what. When tasks are taking too long or delayed, the PMr determines if additional resources be added to speed up the activity. If costs are above the plan, find savings in other areas or obtain approval for overruns.

Phases of PM Phase 2: Monitor and Control This phase also includes communicating to stakeholders of the changes and of the status of the projects performance metrics. A delay in one part of the project will affect other parts, so they must be informed. Changes in the requirements must be documented and informed to the assigned resources. Cloud based software applications are used to manage projects and communicate across stakeholders.