All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks.

Slides:



Advertisements
Similar presentations
Jubail Industrial City A $45 Billion Super Project
Advertisements

1 Compliance & Credits: The Tools, The Rules and How They Affect Your HUD Multifamily Housing Project (Real Estate Assessment Center Inspections) Presented.
How to, kinds of and info on – maps!
I Can Draw A Map.
CLIFFS launch meeting 26 October 2005, Holywell Park, Loughborough University BIOLOGICAL AND ENGINEERING IMPACTS OF CLIMATE CHANGE ON SLOPES (BIONICS)
Preparedness Planning Campus Utility System RMA Webinar Feb 28, 2013.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: August 5 th, 2013 – August 9 th, 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Confined spaces What all agricultural workers need to know.
Methow Valley Irrigation District Alternatives Evaluation Presented by Bob Montgomery, P.E. and David Rice, P.E. January 31, 2013.
What A Homeowner Needs to Know
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
 Review of Servicing Initiative Mandate  Sanitary Sewer Concept  Storm Sewer Concept  Water Main Concept  Principles of A Joint Servicing Agreement.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Week 1.
Village of Denzil PS 3150 Pilot Project summary. Pilot Project Introduction A pilot project was initiated with the Village of Denzil to provide further.
Preliminary Design of Galvez Estates Subdivision.
20th July 2002 Chevron UK full surface tank fire.
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
Muon Campus AIP Review MC-1 Building GPP Update Russ Alber FESS Engineering January 23, 2013.
Measure E Town Hall November 24, 2003 Donna Jones Dulin Gilbane Building Co.
Feedback and Improvement Bizarre Accident of the Week Safety Photo of the Week Collider-Accelerator Department Take 5 for Safety.
The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
10/9/20151 RAINWATER HARVESTING MASTER PLAN IN JAMIA MILLIA ISLAMIA CAMPUS NEW DELHI (First of its kind in India with the Proposal to develop Rainwater.
Area of Inundation Industrial Drive Area of Flooding =
Julius West Middle School Construction Updates
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Watersheds Human activities and structures, as depicted
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Muon Campus MC-1 Building GPP Update Russ Alber FESS Engineering November 28, 2012.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander.
1 OF 16 INFO:You observe that this fire pump system is leaking. This fire pump system is not designed to leak. DEF:Leaking Central Water Supply (Domestic.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
FESS/Ops Shut Down Summary Week Ending 9/7/12. – FESS needs a CUB Cooling Outage for installation of Barriers in the CUB Chiller 4160 Volt Starter Cabinet.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
FESS/Ops Week Ending 1/20/13. CUB Status – Boiler #1 ON LINE CB Kramer due in to Wire in second recirculating Pump and install NFPA 70E mitigations –
FESS/Ops Shutdown Summary Nov 9 th, CUB Status – Boiler #1 ON Primary Recirculating Pump repaired Second Belly Pump to be Wired – Boiler #2 OFF.
FESS - OPS SHUTDOWN UPDATE. ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP.
FESS/Ops Shutdown Summary Week Ending 3Aug12. CUB Shut-Down Activities Shut Down Plant on July 21 hrs. Electrical – High Voltage Air Switch/Fuse.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
Sewerage & Water Board of New Orleans Water Hammer Hazard Mitigation Project February 4, 2015.
What climate change impacts has your community faced? Increased intensity of precipitation - Road infrastructure, Business disruptions, Storm water system.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
1 Risks at Komati Water Scheme PED Operations. 2CONTENT  Executive Summary  Pump station layout schematic  KWS Maintenance risks  KWS Operational.
Cogeneration Power plants generate lots of waste heat Modern coal fired plants convert 38% of the energy in the coal to electricity, the other 62% is waste!
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Conventional Facilities/Siting Jonathan Hunt Project X Machine Advisory Committee March 18-19, 2013.
Managing the UK’s water
City of Whitehorse 2017 Capital Projects & Service Requirements Peter O’Blenes, P. Eng February 21,2017.
What led to Temple Hill Road and Nirvana Gardens?
1.3-GHz Cavity Vacuum Furnace at IB4
UMCP Learning Objectives
Direction water flow Notes: Occupancy type is PUBLIC The WCs (toilets) are public flush valve.
Fire Fire drill.
Project-Based Learning: Design and Build a Rain Garden
Site Plan Requirements
Unit: Water and the Atmosphere
I Can Draw A Map.
Chapter 4 Water Supply.
...i "' ' ' ' ' ' - '. ' "'A " y,,.,, ;J t;
Effects of Disasters on Wastewater Treatment and Collection Systems
Presentation transcript:

All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks

Weekend Activities ( between 10 and 11 inches of rainfall) Flood Control Surface Water Activities New Muon Lab switchgear Main Ring B-3 transformer MI-40 transformer Sanitary lift station and adjacent structures in Village Meson Detector Building roof Site 29 power outage

Site Ponds

West Weir

East Weir

Andys Pond

Power Line Road

Weekend Activities ( between 10 and 11 inches of rainfall) Flood Control Surface Water Activities New Muon Lab switchgear Main Ring B-3 transformer MI-40 transformer Sanitary lift station and adjacent structures in Village Meson Detector Building roof Site 29 power outage

Domestic Water Project Single DWS line vulnerability Second DWS feed to WH and footprint GPP project starts this week Method of Horizontal Directional Drilling WH east parking lot impact 9/17–10/17

Industrial Cooling Water Supplies fire and cooling water make-up System is in poor shape Several recent pipe and valve failures No significant operational impacts – yet –Pond water quality diminished –Increased silt levels and zebra mussel shells Plans for GPP and longer term line Item project Infrastructure must be part of future project planning