EQ programs at Mochovce NPP – Severe Accident Cases

Slides:



Advertisements
Similar presentations
CURRENT METEOROLOGICAL HAPPENINGS THE SITING AND ACCIDENT CONSEQUENCES BRANCH DIVISION OF SITE AND ENVIRONMENTAL REVIEWS OFFICE OF NEW REACTORS Brad Harvey,
Advertisements

Plant Vogtle 1&2 10 CFR Pilot Program NESCC Meeting
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
Company Presentation January Noliac Group Technology, Products and Applications Noliac is specialized in a high degree of customization.
Swiss Federal Nuclear Safety Inspectorate Integrated Oversight An Approach to Systematic Supervision of NPP Safety Dr Peter Flury 31 May 2006.
Electrical Cable Aging: What does IEEE Std Recommend? Module 5 Dr. John H. Bickel Evergreen Safety & Reliability Technologies, LLC.
1 wp4 – Technical Issues for payload integration within the Nacelle for High Altitude flight Budapest 24/11/04 Marco Bobbio Pallavicini Carlo Gavazzi Space.
Maintenance Optimisation At Rovno NPP Robert Hudson.
Generation Aino Ahonen CABABILITY OF APROS IN THE ANALYSES OF DIESEL LOADING SEQUENCES E. Raiko, H.Kontio, K.Porkholm, presented by A. Ahonen.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
Orynyak I.V., Borodii M.V., Batura A.S. IPS NASU Pisarenko’ Institute for Problems of Strength, Kyiv, Ukraine National Academy of Sciences of Ukraine Pisarenko’
Lecture 2 - Fundamentals. Lecture Goals Design Process Limit states Design Philosophy Loading.
Statistical Analysis of Loads
Fire Safety in Nuclear Power Plants and Modeling Fire in a Generic EDG Room by COMPBRN III M. B. Öztemiz, Ş. Ergün Hacettepe University Nuclear Engineering.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Glenn Research Center at Lewis Field Random Vibration Testing of Hardware Tutorial 1 Fatigue Life Assessment William O. Hughes/7735 Mark E. McNelis/7735.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Analytical Approaches to Evaluate Residual Cable Lifetime Module 4 Dr. John H. Bickel Evergreen Safety & Reliability Technologies, LLC.
EQE International The use of Fragility Analysis in Seismic Safety Cases for Nuclear Power Stations.
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
Internal Arc testing of paper-oil insulated transformers Igor Žiger, univ. spec. transf. IEEE Transformer Committee meeting Atlanta, Georgia, 2016.
Federal Service for Environmental, Industrial and Nuclear Supervision LEGAL REQUIREMENTS ON EXPLOSION PROTECTED EQUIPMENT FOR THE GAS AND PETROLEUM ACTIVITIES.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Specifications for Rotating Anode X-ray Tube Ass’y Model : M125S20X Maximum X-ray Tube Voltage kV Focal Spot Size (Small/Large)
Ground Bond and Ground Continuity Testing
Motor Protection Dr. Hendro Rijanto.
2013 ISOE International ALARA Symposium
GSR022: Review of Security and Economy Required Transfer Conditions
JSC Atomenergoproekt, Moscow, RF
Severe Accident Qualification EPR™ OL3
FIELDS SCM Thermal iPER
Spent Fuel Pool Instrumentation NRC Order EA
Orynyak I.V., Borodii M.V., Batura A.S.
(BOUNDARY CONDITIONS)
EQE International The use of Fragility Analysis in Seismic Safety Cases for Nuclear Power Stations.
Mild Environment Qualification and Maintenance
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Flooding Walkdown Guidance
ACCURACY IN PERCENTILES
IEEE 383 Standard for Qualifying Electric Cables and Splices for Nuclear Facilities Preview SC-2 May 12, 2014 Robert Konnik.
IEEE SC-2 International Standard Review
Project WECC-0100 Update Load Modeling Task Force
Transformers. Transformer An A.C. device used to change high voltage low current A.C. into low voltage high current A.C. and vice-versa without changing.
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Complementarity of deterministic and probabilistic approaches
IEEE SC-2 May 12, 2014 Robert Konnik
IEEE SC 2 May 12, 2014 Robert Konnik
Exercise physiology Preparation & training methods training principles
BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components Version 1.0, May 2015 This material was.
Severe accident management at Paks NPP
Nuclear Program in Czech Republic
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
LIGHTNING AND INSULATIONS COORDINATION
Transformer Loading Considerations
TRTR Briefing September 2013
Pedro Cruz Yábar Brussels, 21st June 2016
Project WECC-0100 Update Load Modeling Task Force
Preliminary Hazard Analysis of Bunker
RSFs & categorisation 20 May, 2019.
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
SPORTS TRAINING.
Grid system is accomplished by three-phase alternating currents.
Introduction to Motor Drives
Mikael Olsson Control Engineer
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
National Institute of Wind Energy(NIWE)
Technical Requirements
Presentation transcript:

EQ programs at Mochovce NPP – Severe Accident Cases Marek Tengler (IEEE SC2, Orlando) (15-17th June, 2011)

EQ programs at Mochovce NPP – Severe Accident Cases 1. Brief information - Mochovce NPP (MO34) Mochovce NPP (utility SE, ENEL) PWR plant type VVER 440 model V-213 - Four units with original design electric power output 440 MWe, each - 2 Units in operation - Design Lifetime: 30 year (+10) - Seismic hazard: Design value PGA = 0,15g SSE for 1x10E4 years COMPLETION PHILOSOPHY FOR UNIT 3 AND 4: UPGRADE DESIGN GENERATION II NPP INTO GENERATION III NPP 2 EQ programs at Mochovce NPP – Severe Accident Cases

EQ programs at Mochovce NPP – Severe Accident Cases 2. SA – Qualification vs Survivability Assesment BASIC ASSUMPTION Equipment shall be subject to an assessment to demonstrate that its design provides a reasonable level of confidence that it shall operate in the environment under which it is required to perform its functions in Design Extension Conditions and it shall be able to operate over the timespan for which it is needed. Qualification of components and systems, as required for those coping with Design Basis Conditions, does not necessarily apply. - Demonstration of equipment survivability does not require the same rigorous demonstrations and the same conservatisms as a true qualification process. 3 EQ programs at Mochovce NPP – Severe Accident Cases

Design Basis Conditions (LB LOCA) - Thermo-dynamic profiles (temperature, pressure), - Post-accident duration (5h – 100 days), - Radiation conditions: dose, dose rate, TID Design Extension Conditions (SA defined in Basic Design) - Temperature peak (primordial): 139°C (duration < 30 min.) Pressure peak (primordial): 350 kPa°C (duration < 30 min.) - Post-accident duration (primordial): 1 year +, - Radiation conditions (primordial): cca 0.3 MGy Humidity: 100% 4 EQ programs at Mochovce NPP – Severe Accident Cases

EQ programs at Mochovce NPP – Severe Accident Cases Alternative parameters of SA DEC for MO34 Variant 1 H2 burning Peak temperature 1600 °C Pressure wave Variant 2 Permanent temperature 139°C – 1 year Variant n+1 SCIENTIST‘S APPROACH VS ENGINEER‘S APPROCH DECISION SHALL BE BASED ON ENGINEERIG JUDGMENT 5 EQ programs at Mochovce NPP – Severe Accident Cases

EQ programs at Mochovce NPP – Severe Accident Cases 3. Applied approach for equipment evaluation/assessment for SA conditions Distinction of accordingly environmental zones - MILD environmental zone - HARSH environmental zone RULES FOR HARSH ZONE Applied for equipment with existing qualification documentation Not combine DEC (SA) with DBC (LB LOCA) Definition of target values: TD environmental extreme peak SA radiation dose is considered as contribution to TID (accident dose) No margins are considered 6 EQ programs at Mochovce NPP – Severe Accident Cases

EQ programs at Mochovce NPP – Severe Accident Cases 3. Applied approach for equipment evaluation/assessment for SA conditions (cont‘d) 7 EQ programs at Mochovce NPP – Severe Accident Cases

EQ programs at Mochovce NPP – Severe Accident Cases 3. Applied approach for equipment evaluation/assessment for SA conditions (cont‘d) RULES FOR MILD ZONE Applied for equipment with existing qualification documentation and equipment to be tested SA ageing is not considered in line equipment conditioning followed by simulation of postulated event (seismic, accident …) SA is considered as design requirements (radiation resistance, degree of protection –IP, anti-explosion design etc.) No margins are considered 8 EQ programs at Mochovce NPP – Severe Accident Cases

EQ programs at Mochovce NPP – Severe Accident Cases 3. Applied approach for equipment evaluation/assessment for SA conditions (cont‘d) Distinction of accordingly environmental zones - MILD environmental zone - HARSH environmental zone RULES FOR HARSH ZONE Applied for equipment with existing qualification documentation Not combine DEC (SA) with DBC (LB LOCA) Definition of target values as environmental extreme peak No margins are considered 9 EQ programs at Mochovce NPP – Severe Accident Cases

EQ programs at Mochovce NPP – Severe Accident Cases 3. Specific example – SA Capability of electric motor Special designed electric motor in accordance of pump performance characteristics Radiation resistance of winding insulation material – MICALASTIC tested for 1x10E7 Gy 1010 EQ programs at Mochovce NPP – Severe Accident Cases

EQ programs at Mochovce NPP – Severe Accident Cases Loading moment of the pump exceed the moment of motor, i.e. at moment equality the start-up of motor is stopped in this point, however the current will be 180 A – 3.2 times of nominal value The issue should be the time during standby regimes where is postulated interval of voltage drop to value of 65% Un. In Technical Specification of the motor is a allowable period of refreshment 7sec. What happened if period of voltage refreshment is longer? 11 EQ programs at Mochovce NPP – Severe Accident Cases