ENERGY OVERVIEW STATISTICS FOR SWAZILAND

Slides:



Advertisements
Similar presentations
August 31- September 1, 2011 Rio de Janeiro, Brazil
Advertisements

Climate Change Mitigation in Developing Countries: South Africa Prepared for the Pew Center on Global Climate Change by Ogunlade.
BI Marketing Analyst input into report marketing Report TitleElectricity in Swaziland Report Subtitle Country profile of power sector, market trends and.
BI Marketing Analyst input into report marketing Report TitleElectricity in Botswana Report SubtitleCountry profile of power market trends and investment.
BI Marketing Analyst input into report marketing Report TitleElectricity in Lesotho Report SubtitleCountry profile of power market trends and investment.
BI Marketing Analyst input into report marketing Report TitleElectricity in South Africa Report Subtitle Country profile of power sector, market trends.
BI Marketing Analyst input into report marketing Report TitleElectricity in Mauritius Report Subtitle Country profile of power sector, market trends and.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
Case study on Bagasse Energy Cogeneration in Mauritius by Dr
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
The Need for an Energy Grid in the Maldives
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
Draft Energy Policy for Nairobi City County An Initiative of UN-Habitat in Collaboration with Nairobi City County Rose Muema Chief Officer, Urban Planning.
The First Mekong Energy and Ecology Training May 11-30, 2009, Thailand Development in Burma Energy Sector By Burma Energy Working Group.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
1. Objective of Seminar Energy sector at a glanceProfiles in Energy SectorAbout SynergemSeizing the opportunities 2.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
WORKING DRAFT Last Modified 8/13/2010 4:05:09 PM Central Europe Standard Time Printed :22:48 Central Europe Standard Time Renewable Energy.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
National Seminar Role of DER in the EU and Current Status in the Baltic States 6 March 2007 Current Status of Energy Policy on Development of Distributed.
ISF:RESEARCH AND CONSULTANCY THINK. CHANGE. DO INSTITUTE FOR SUSTAINABLE FUTURES South African Energy Sector Jobs to Report for Greenpeace Africa.
Energy situation & Energy policies in South Africa Presented by: Thembani Bukula.
Sanjay Garg General Manager PGCIL/ Ministry of Power
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Croatian Power System 1 The Electric Power System - Croatia -
JUNTOS CONSTRUIMOS UN PAIS DE CALIDAD HONDURAS RENEWABLE ENERGY 2012.
BI Marketing Analyst input into report marketing Report TitleElectricity in California Report Subtitle State profile of power sector, market trends and.
CAPACITY DEVELOPMENT WORKSHOP ON FOSSIL FUEL AND RENEWABLE ENERGY (FFRE) FOR INDIAN OCEAN AND AFRICAN SIDS Organized by United Nations Office for Sustainable.
SOUTHERN AFRICAN POWER POOL PPP Power Projects in Southern Africa
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
CALIFORNIA ENERGY COMMISSION Why Peak Demand Offset Measures Are Necessary When There Is “Enough” Energy Lorraine White Advisory to Vice Chair Pfannenstiel.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
Regional Training Workshop on Geographic Information System for Energy Planning JULY Dakar, Senegal Energy and Rural Electrification Planning,
Hanoi, October GROWTH RATE OF ELECTRICITY DEMAND Growth rate of Electricity consumption, period Growth rate of Electricity consumption,
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Photovoltaic (PV) Inverter Market Price, Packaging Trends, Industry Outlook.
Development of Renewable Energy Challenges and Prospects
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
ELECTRICITY COMMISSION
Damitha Kumarasinghe Director General
Distribution Tariffs in Brazil
Operationalizing One Nation One Grid
CURRENT STATUS - ENERGY TRANSITION
Off-grid Electrification Department of Rural Development
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Photovoltaic (PV) Inverter Market Price, Packaging Trends, Industry Outlook.
City of Cape Town New Urban Agenda
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
Financing of Solar power plants
COUNTRY PRESENTATION OUTLINE: BURUNDI
ENERGY OVERVIEW STATISTICS FOR SWAZILAND
THE REPUBLIC OF MALAWI MALAWI PRESENTATION AT
MINISTRY OF ENERGY AND POWER DEVELOPMENT ZIMBABWE
PORTOFOLIO COMMITTEE ON ENERGY
Electricity Sector in Egypt.
SEYCHELLES Energy Overview Statistics Chaminuka Lodge Zambia
Highlights of the Ethiopian Energy Sector
Wind Power in Bulgaria and the Region: Key Challenges
Report to the UPDEA 39th General Assembly
Conditions for viability of minigrids
DEMOCRATIC REPUBLIQUE OF CONGO
March, 30 – April 3, 2009, Honolulu, Hawaii
Vietnam Power Sector Reform And Market Devvelopmentvvvv
Solar Energy Commercialization Utility Scale Business:
The Potential of Renewable Energy in Libya
Presentation transcript:

ENERGY OVERVIEW STATISTICS FOR SWAZILAND COMESA WORKSHOP ON RENEWABLE ENERGY GUIDELINES 7th – 11th AUGUST, 2017

Country Overview Classified: Lower Middle Income Country Hhohho Region Classified: Lower Middle Income Country GDP per capita: US$3,074.00 (2014) GDP Growth: 2.5% (2014) Inflation Rate: 6.8% (2017) National Currency: Lilangeni (E1=ZAR1 1 Euro = E14.20 US$1.00 = E13.30 Lubombo Region Manzini Region Shiselweni Region Land Area: 17,363 km2 Landlocked: RSA and Mozambique Population: 1.1 million (2014) Urban: 23% Rural: 77 %

KEY ENERGY INDICATORS (2016) Maximum Electricity Demand : 230 MW Total Energy Requirement : 1256.2 GWh Total Electricity Imports : 1077.1 GWh Total Electricity Losses MOTRACO Transmission: 1.33% Transmission : 3.46% Distribution : 6.54% Commercial : 2.87% 14.2% 70% of the Population is connected to the Electricity Grid Population using off grid renewables is unknown but very minimal

Facility Charge US$/Month Electricity Tariffs – Non TOU (US$1.00 = E13.30) TARIFF CATERGORY Facility Charge US$/Month Energy Charge US$/kWh Demand Charge US$/kVA Access Charge US$/kVA Life Line   $ 0.10 Domestic $ 0.11 General Purpose $ 14.66 $ 0.15 Small Commercial – Prepayment Small Commercial - Credit Meter $ 29.32 Small Holder Irrigation $ 129.88 $ 0.06 $ 9.56 $ 3.50 Large Commercial and Industrial $ 152.80 $ 0.07 $ 11.24 $ 4.12 Large Irrigation

TOU small irrigation < 100 kVA Electricity Tariffs – TOU (US$1.00 = E13.30) TOU TARIFFS T1 T2 T3 T4 Description TOU at MV at HV network TOU at MV TOU at LV TOU small irrigation < 100 kVA Facility Charge US$/month $ 354.44 $ 170.58 $ 128.32 $ 109.07 Demand Charge US$/Kva $ 10.22 $ 10.71 $ 11.24 $ 9.56 Access Charge US$/kVA $ 4.10 $ 4.30 $ 4.12 $ 3.84 Energy – Low Demand - Peak c/kWh $ 0.11 $ 0.11 $ 0.11 $ 0.10 Energy – Low Demand - Standard c/kWh $ 0.08 $ 0.08 $ 0.08 $ 0.07 Energy – Low Demand - Off-Peak c/kWh $ 0.06 $ 0.06 $ 0.06 Energy – High Demand - Peak c/kWh $ 0.30 $ 0.31 $ 0.32 $ 0.27 Energy – High Demand - Standard c/kWh $ 0.09 $ 0.10 Energy – High Demand - Off-Peak c/kWh

Installed Power Generation Name of Power Plant (MW SCALE) Technology Type Capacity Year Commissioned Ezulwini Power Station (SEC) Hydro 20MW 1985 Edwaleni Power Station (SEC) 15MW 1964 Diesel 9.5 MW Maguduza Power Station (SEC) 5.6 MW 1970 Maguga Power Station (SEC) 19.5 MW 2011 Ubombo Sugar Limited (Big Bend 25 MW -2011) largest unit Bagasse/ Biomass 40.5 MW 1.0 MW USA Distillers Coal 2.2 MW RSSC (Simunye 30 MW – 2012) largest unit Bagasse/Coal 65.5 MW 2012 Total 178.8 MW

Installed Power Generation Name of Power Plant (SMALL SCALE) Technology Type Capacity Year Commissioned Wundersight – Grid tied (SEC) Solar PV 0.1 MW 2016 Bulembu 0.025MW 2012 Mbabane Blood Bank 0.032MW 2013 University of Swaziland (Luyengo Campus) 0.060MW 2014 Ngwenya Glass 0.090MW Mhlumeni Boarder Post 2015 Ezulwini Highway 0.070MW Tikhuba High School Wind 0.0034 MW 2017 0.0025 MW Amadi University 0.0035 MW Solar 0.0065 MW Waterford 0.022MW Total 0.4469MW

Planned Power Generation Name of Power Plant Technology Type Capacity Estimated Cost Status of Feasibility Lower Maguduza Hydro 12 MW $ 52 671 181 Financial Closure Montingy Biomass 35 MW Ongoing Wundersight Kalanga Solar Plant Solar PV 0.85MW $ 1 563 663 Ngwempisi Power Plant hydro 100MW - 120MW Prefeasibility Stage Lubhuku Thermal Power Plant Coal 150 MW – 300MW Coal prospecting completed Lower Maguga Power Plant 10 MW To Commence Feasibility Study Solar Power Plants Solar 60MW Feasibility Completed for 5MW

Transmission Map - Interconnectors 132 KV LINE From South Africa 400 KV MOTRACO To Mozambique 400 KV MOTRACO From South Africa 132 KV LINE From South Africa

KEY POLICIES AND LEGISLATION National Energy Policy, 2003 – Currently under review Swaziland Independent Power Producer Policy, 2016 Electricity Act, 2007 Swaziland Electricity Company Act, 2007 Energy Regulatory Authority, 2007 Swaziland Grid Code – awaiting approval Tariff Methodology Electricity By laws Energy Master Plan (2017 – 2035) – Under Development Energy Efficiency Policy – Under Development

THANK YOU