Developing a Project Plan

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 6: Developing a Project Plan
Project Management 6e..
Chapter 6 Time Planning & Networks
Developing the Project Plan
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Project Management Project Management
Developing a Project Plan Chapter 6 Luck favors to a prepared mind….. Louis Pasteur.
Developing a Project Plan
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Developing a Project Plan
1 University of Wales Bachelor of Science (Industrial Engineering and Management) Year 3 Copyright © 2012 MDIS. All rights reserved.Section
إدارة المشروعات Projects Management
Chapter 4: Schedule, cost, and situation analysis (pt. 1) ISE 443 / ETM 543 Fall 2013.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 © 2007 Pearson Education.
Project Scheduling: Networks, Duration estimation, and Critical Path.
MGMT 483 Week 8 Scheduling.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Project Development Scheduling and Probability of Completion.
Project Management OPER 576 Project Networks Greg Magnan, Ph.D. April 29, 2004.
Project Scheduling: Networks, Duration Estimation, and Critical Path
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 15.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Project Scheduling: Networks, Duration estimation, and Critical Path
Importance of Project Schedules
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
7-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 7 Project Time Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Developing a Project Plan Chapter 6.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Dr. Hany Abd Elshakour 2/18/ :27 PM 1. Dr. Hany Abd Elshakour 2/18/ :27 PM 2 Time Planning and Control Activity on Arrow (Arrow Diagramming.
PROJECT MANAGEMENT week 5
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
9-1 ELC 347 project management Day 19. Agenda Integrative Project –Part 4 Due –Part 5 Due Nov 24 (page 342) –Any of the first five sections can be resubmitted.
BU630-4 Project and Operations Management
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Project Management MGT 30725
Project Management -- Developing the Project Plan
Project Management: PERT/CPM
Project Scheduling KULIAH 10 Magister Sistem Informasi
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
& Urban Planning Civil Engineering Department
Project Scheduling KULIAH 10 Magister Manajemen
Time Planning and Control Activity on Node Network (AON)
Chapter 6: Project Time Management
Projects: Critical Paths
Developing a Project Plan
Activity on Arrow Project Management.
Project Scheduling: networks, duration estimation, and critical path
PLANNING ENGINEERING AND PROJECT MANAGEMENT
ENM448-Project Planning and Management
Critical Path Analysis
Project Scheduling: Lagging, Crashing and Activity Networks
Time Planning and Control Activity on Node Network (AON)
Project Management (lecture)
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
Project Management (lecture)
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

Developing a Project Plan Student Version CHAPTER SIX Developing a Project Plan McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.

Developing the Project Plan The Project Network –A flow chart that graphically depicts the sequence, interdependencies, and start and finish times of the project job plan of activities that is the critical path through the network. Provides the basis for scheduling labor and equipment. Enhances communication among project participants. Provides an estimate of the project’s duration. Provides a basis for budgeting cash flow. Identifies activities that are critical. Highlights activities that are “critical” and can not be delayed. Help managers get and stay on plan.

A circle represents a node A circle represents a node. The completion of all activities incoming to a node is considered an event, as is the start of the project. An arrow one of the activities of the project. A dashed arrow represents a dummy activity. Dummy activities are used to represent precedence relationships.

Constructing a Project Network Terminology –Activity: an element of the project that requires time. –Merge Activity: an activity that has two or more preceding activities on which it depends. –Parallel (Concurrent) Activities: Activities that can occur independently and, if desired, not at the same time. A B D C

Constructing a Project Network (cont’d) Terminology –Path: a sequence of connected, dependent activities. –Critical path: the longest path through the activity network that allows for the completion of all project- related activities; the shortest expected time in which the entire project can be completed. Delays on the critical path will delay completion of the entire project. C A B D (Assumes that minimum of A + B > minimum of C in length of times to complete activities.)

Constructing a Project Network (cont’d) Terminology –Event: a point in time when an activity is started or completed. It does not consume time. –Burst Activity: an activity that has more than one activity immediately following it (more than one dependency arrow flowing from it). Two Approaches –Activity-on-Node (AON) Uses a node to depict an activity. –Activity-on-Arrow (AOA) Uses an arrow to depict an activity. B A C D

Basic Rules to Follow in Developing Project Networks Networks typically flow from left to right. An activity cannot begin until all preceding connected activities are complete. Arrows indicate precedence and flow and can cross over each other. Each activity must have a unique identify number that is greater than any of its predecessor activities. Looping is not allowed. Conditional statements are not allowed. Use common start and stop nodes.

Types of project networks Activity on arc (AOA) project network, where each activity is represented by an arc. A node is used to seperate an activity from each of its immediate predecessors. The sequencing of the arcs shows the precedence relationship btw the activities. Activity on node (AON) project network , where each activity is represented by a node. Then the arcs are used just to show the precedence relationships that exist btw activities.

Activity-­‐on-­‐node Activity-­‐on-­‐arrow 9

Dummy Activities Sometimes it is necessary to insert dummy activities (duration zero) in order to maintain the clarity of the diagram and the precedence relationships between activities. In activity-­‐on-­‐arrow PERT diagrams, each activity must be uniquely identifiable by its start and end nodes. However, sometimes multiple tasks have the same predecessors and successors. 10

Dummy Activities Case One A task should be uniquely identifiable from its start node and finish node This means that two or more tasks cannot share the same start and finish nodes B A D 1 2 3 4 Task D has immediate predecessors of B and C C Tasks B and C have the same start and finish nodes 11

A dummy task is inserted to preserve the immediate predecessors of D Dummy Activities Inserting a dummy activity can ensure that multiple tasks have different successors. A 2 B 3 D 1 5 A new node is inserted to give C a different finish node to B A dummy task is inserted to preserve the immediate predecessors of D 4

Network Computation Process Forward Pass—Earliest Times –How soon can the activity start? (early start—ES) –How soon can the activity finish? (early finish—EF) –How soon can the project finish? (expected time—ET) Backward Pass—Latest Times –How late can the activity start? (late start—LS) –How late can the activity finish? (late finish—LF) –Which activities represent the critical path? –How long can activity be delayed? (slack or float—SL)

Forward Pass Computation Add activity times along each path in the network (ES + Duration = EF). Carry the early finish (EF) to the next activity where it becomes its early start (ES) unless… The next succeeding activity is a merge activity, in which case the largest EF of all preceding activities is selected.

Backward Pass Computation Subtract activity times along each path in the network (LF - Duration = LS). Carry the late start (LS) to the next activity where it becomes its late finish (LF) unless The next succeeding activity is a burst activity, in which case the smallest LF of all preceding activities is selected.

Example Example 2: Problem A publisher has a contract with an author to publish a textbook. The simplified activities associated with the production of the text book are given below. The author is required to submit to the publisher a hard copy and a computer file of the manuscript. Develop the associated network for the project.

Example: Project Activities Activity Predecessor(s) Duration (weeks) A: Manuscript proofreading by editor None 3 B: Sample pages preparation 2 C: Book cover design 4 D: Artwork preparation E: Author’s approval of edited manuscript and sample pages A,B F: Book formatting E G: Author’s review of formatted pages F H: Author’s review of artwork D 1 I: Production of printed plates G,H J: Book production and binding C,I

Example: Network (AOA) 7 5 5 3 7 5 5 7 2 3 4 6 7 K=0 E=2 F=2 3 7 3 3 2 G=2 9 9 A=3 B=2 8 5 7 2 9 8 H=1 9 1 9 2 3 6 I=2 11 15 D=2 11 15 J=4 8 9 1 C=4 7 11 11 4 11

Example: Network (AOA) Findings: The critical path is A, D and H. The maximum time is 25

Example: GANNT Chart Time Scheduling Note: Consider time duration and activity predecessor(s).

Determining Free Slack (or Float) –Is the amount of time an activity can be delayed after the start of a longer parallel activity or activities. –Is how long an activity can exceed its early finish date without affecting early start dates of any successor(s). –Allows flexibility in scheduling scarce resources. Sensitivity –The likelihood the original critical path(s) will change once the project is initiated. –The critical path is the network path(s) that has (have) the least slack in common.

Practical Considerations Network Logic Errors Activity Numbering Use of Computers to Develop Networks Calendar Dates Multiple Starts and Multiple Projects

Extended Network Techniques to Come Close to Reality Laddering –Activities are broken into segments so the following activity can begin sooner and not delay the work. Lags –The minimum amount of time a dependent activity must be delayed to begin or end. Lengthy activities are broken down to reduce the delay in the start of successor activities. Lags can be used to constrain finish-to-start, start-to-start, finish-to-finish, start-to-finish, or combination relationships.

Hammock Activities Hammock Activity is a schedule or project planning term for grouping smaller subtasks that hang  between two dates. The sub tasks are not really related in a hierarchical sense. there is no fixed sequence of tasks – any of these subtasks can be done at any time, but there is no particular sequence. The objective is to group dissimilar activities that must be performed to achieve an overall goal, but their individual sequence is not important or logical. ––Duration of hammock activities is determined after the network plan is drawn. --The size of the hammock, or the duration of the hammock is calculated by the start date of the earliest task, and the finish date of the last task.

GANTT CHART vs PERT CHART GANTT chart visually shows the duration of Tasks whereas a PERT chart visually shows the sequence dependencies between tasks. GANTT visually shows the Time overlap of Tasks whereas a Network does not show time overlap but does show which tasks could be done in parallel. Some form of GANTT chart can visually show Slack Time available within an Earliest Start and Latest finish time.. Most Project Managers find PERT very helpful for scheduling, monitoring and controlling Projects. PERT is recommended for Large Projects with high intertask dependencies and the GANTT chart for simpler Projects. Most Project Management Case Tools nowadays (eg. MS- Project ) allow the best feature of PERT to be incorporated into GANTT Charts.