The second River Basin Management Plans delivery update - Argyll

Slides:



Advertisements
Similar presentations
Development of restoration policy framework Joyce Carr Scottish Government.
Advertisements

Devon Floodplain Woodland Project Nick Whatley & Richard Knott Fisheries, Recreation and Biodiversity Team (Devon) March 2009.
This is the Yorkshire Derwent Every catchment has a story...
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 3: The Local Authority - What’s happening? Castle Lake,
Feedback from engagement and consultation for physical condition River Basin Management Planning Unit.
Water Framework Directive – Coastal issues Will Akast Catchment Delivery Manager-Suffolk.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage.
Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage.
Advisory group update – September 2013 Development of the second river basin management plans Sustainable water management for the benefit of Scotland’s.
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
European Marine Sites Update Ruth Crundwell. Natural England Advisers to the government on the environment, providing practical scientific advice on how.
IMPROVING FISH PASSAGE ON THE RIVER ALMOND WELCOME.
Water Framework Directive and the SRDP Jannette MacDonald Land Unit, SEPA.
IMPROVING FISH PASSAGE ON THE RIVER ALMOND WELCOME.
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
Scottish Fisheries Management Investigation into Structures for the Management of Freshwater Fisheries in Scotland Dr Keith Hendry.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
WFD Characterisation Report Dr Tom Leatherland Environmental Quality Manager 29 October 2003.
Flood and Water Management In Scotland Dr Rebecca Wade, UWTC, University of Abertay
Defining Good Ecological Potential : Method used in the UK Niall Jones Hydro-morphology senior advisor Environment Agency.
Industry Dialogue on xoserve Services 14 th September 2007.
Science Translation, Conservation Adoption and Delivery: Revised process for needs and projects related to science translation and adoption Steve Fuller.
Water.europa.eu Compliance Checking of River Basin Management Plans Strategic Coordination Group Meeting, 4-5 November 2009 DG Environment, European Commission.
Building WFD into impact assessment Richard Sharp Geomorphology IEMA webinar Thursday 31 March 2016.
Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage.
Engineering in the Water Environment Roy Richardson.
The second River Basin Management Plans and implementation of fish barriers measures Jenny Davies RBMP coordinator June 2017.
Environmental Services Training Group
Community Empowerment and Engagement
Options to address fish barriers
Meeting Standards and Expectations in the Water Industry
The second River Basin Management Plans delivery update - Highland
The second River Basin Management Plans and implementation of fish barriers measures Jenny Davies RBMP coordinator November 2017.
Community Empowerment (Scotland) Act 2015
Monitoring, assessing and classifying the environment
Freshwater fish Classification Tools
Environmental Services Training Group
Role of Fisheries Trusts/ Boards in River Basin Management Planning
River Basin Management Planning
FORESTRY AND DIFFUSE POLLUTION
RBMP Delivery Update Outer Hebrides 2017
River Basin Management Plans delivery update – North East May 2018
Addressing fish barriers
State of play of French progress in cost-effectiveness analysis
WFD and Hydromorphology - 4/5 June 2007, Berlin, Germany -
Monitoring, assessing and classifying the environment
1. Implementation of the Water Framework Directive: notifications & infringements, RBMP assessments for the agricultural sector Expert Group on WFD & agriculture.
A pilot appraisal at catchment level for the second RBMP cycle: Experience from the UK Presented by: Simon Scanlan (Defra) Kathrynne Moore (Environment.
River Basin Planning & Flood Risk Management in Scotland
Summary of Scoping Document and feedback
Developing the second plans
Integrated River Basin Management
DG ENV/MSFD 2018 call for proposals
Preparing a River Basin Management Plan WFD Characterisation Manager
Chapter 5: Water management and adaptation
LIFE and the implementation of the Water Framework Directive
A Blueprint to safeguard Europe’s waters
GROUNDWATER CHARACTERISATION in England & Wales
ECONOMICS IN THE WFD PROCESS
Objective setting in practice
Scottish Government Responsible for environment & flooding issues
FINANCING NATURA 2000 Agenda item 2.1 CGBN Co-ordination Group
The Blueprint and Council Conclusions:
NGOs expectations for next WFD cycle
UK experience of Programmes of Measures
EU Water Framework Directive
Assessment of Member States‘ 2nd River Basin Management Plans
Presentation transcript:

The second River Basin Management Plans delivery update - Argyll Jenny Davies RBMP coordinator June 2017

Objectives and state of the water environment in Scotland HIGH GOOD MODERATE POOR BAD No deterioration Improve to Good Status by 2027 Protected Areas R e s t o r e RBMPs has two main types of objectives. First is to protect against deterioration in quality – through authorising new activities, land use planning decisions and protecting against the spread of invasive. Second is to improve to good status by 2027 - Ambitious plan – We need to do this unless there is a very good reason not to. The plans also cover protected areas – bathing waters, drinking water, shellfish waters and conservation areas. 5. Objective setting has been lead by the Water unit supported by SEPA sector leads and informed by external sector engagement consultation feedback ecosystems services data PA status (SAC, SPA, NVZ, UWWTD etc) confidence of classification and pressures estimated costs of improvement versus the ££ available (done through scenarios and impacts on use)

What needs done in Argyll? FORESTRY AND DIFFUSE POLLUTION Iterating the importance of the water environment. Jackie McColm SEPA

Hydro reviews 2 second cycle measures; Allt Kinglass has been reassessed – not as bad as we initially thought and so has been put back to the third cycle until we better understand the ecological requirements Abhain Fionain in the Awe catchment is progressing with flow trials to measures the wetted width and assess fish access.

Barriers to fish migration Active - CAR provisions/ licence review Assets - often not associated with a controlled activity but typically responsibility lies with local or national authority. Addressed through asset management programmes. Historic – financial support through WEF Some will require coordinated partnership approach led by a relevant public body or delivery group.

Process for barriers Screening Scoping Options Appraisal Design Build Evaluate

Categories of fish barriers and delivery mechanisms Active barrier Historic barrier Controlled Activities Regulation Asset barrier Water Environment Fund Active - This year, priority is for the hydro sector. This is done through the regulatory process, all these barriers have an associated CAR authorisation and improvements will be delivered through a variation of their authorisation. New Restoration Regulations

Historic Barriers On going projects: 14 barriers to be eased/removed this cycle New projects: 18 “new” barriers to be eased/removed this cycle Internal scoping study Planning phase (2017-2020) Build phase (2019/2021) Re-priotisation to fit with the allocated WEF budget. On going projects: At the build phase: Almond Barriers- 7 barriers phased over 5 years Lugton Water Barriers- 2 barriers to be done next year Water of Glencalvie- 1 barrier to be done next year At the developing stage: Kirk Burn- 1 barrier Tyne Barriers- 3 barriers New projects: Internal scoping studies: To increase understanding of the For SEPA specialists to understand the individual priority barriers for RBMP2 To prepare technical information and understanding prior to engaging consultant to assess or design fish passage. To identify, in general terms, if SEPA believe removal is a realistic option, requiring further investigating To identify if other options should be considered e.g, fish pass, bypass, partial removal. 16 scoping to happen before the end of march and another 15 in the spring. We will scope all historic barriers this cycle. We have very good feedback on the process, have learnt a lot of the barriers and this will allow us to be more efficient in delivering improvements on FBs.

Asset Barriers Active Barriers Engagement with the asset owners Scoping studies Remediation notice Active Barriers Engagement with the responsible person Licence review Engagement with the asset owners: Forestry, council, Network rail, Transport Scotland…. This is to happen this year Scoping study : Same principle than for the historic but will involve the asset owner too. Remediation notice: It is a planning tool that can be used as an enforcement tool if needed. But, we want to engage with the owners first. Developing process internally and raising awareness with asset owner

Barriers progress in Argyll Mingarry Burn, Mull is being progressed by FCS who have agreed to ease fish passage. Allt Sanna, Ardnamurchan is being progressed by Scottish Water who are modifying their drinking water supply to ease fish passage. Feochan Bheag, Kilmore. The landowner is replacing a pipe culvert with a span bridge. Glen Kerran Water, Kintyre has washed out a redundant structure all by herself! Barcaldine barrier is being re assessed as disproportionately expensive as too little US habitat, only 400m of low quality habitat.

Loch Awe Fish Continuity Project Joint project with Argyll Fishery Trust and the Wild Trout Trust This will be in September They’re keen to get interested folks from local authority, BEAR and FCS Let me know if interested

Other projects SEPA are collating information for the diffuse pollution focus area in Kintyre. Catchment visits are likely to take place later in the year. Unknown sources pressures – further monitoring and investigation is underway for these waterbodies.