Copywrite SESC January 2009 Unit 26, Dinnington Business Centre Outgang Lane, Dinnington South Yorkshire S25 3QX Tel.: +44(0)1909 518500 Fax +44(0)1909.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Health & Safety Management
A Joint Code of Practice Objectives and Summary Presentation
Fire Risk Assessments – Are You Competent?. Fire safety legislation requires that, for most premises except private dwellings, a fire risk assessment.
Background Presenters Work done in preparation for WHS changes
Effectively applying ISO9001:2000 clauses 6 and 7.
Professional Health and Safety Consultants Helping your enterprise or your institution with safety management
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
OHS Induction Training
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
1. (c) Alan Rowley Associates Laboratory Accreditation Dr Alan G Rowley Quality Policy based on Quality Objectives Quality Management System Communicate.
FACILITIES MANAGEMENT Duty Holders process, FM and University James Stapleton FM Health, Safety and Risk Manager.
Presentation Retail Security Key Holding Mobile Patrols Access Control Systems Manned Security Receptionist CCTV Monitoring.
ISO 9001 : 2000.
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
Contractor Safety Management
BRC Storage & Distribution Safety and Quality Management System Training Guide
The Islamic University of Gaza
Customer Service & Customer Protection in MANSELL
ISO 9001 Interpretation : Exclusions
Quality Management.
Fire Safety Jonathan Harrison Fire Protection Inspector West Yorkshire Fire & Rescue Authority.
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
AUDITS AND INSPECTIONS
FPSC Safety, LLC ISO AUDIT.
Personnel Basic Principles of GMP Workshop on
4. Quality Management System (QMS)
4. Quality Management System (QMS)
Safety procedures in sport
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Welcome ISO9001:2000 Foundation Workshop.
1 CHCOHS312A Follow safety procedures for direct care work.
Ship Recycling Facility Management System IMO Guideline A.962
Occupational Health and Safety
Basics of OHSAS Occupational Health & Safety Management System
What is it? Why it is so important?
The Policy Company Limited © Control of Infection.
Hazards Identification and Risk Assessment
This class cannot be shared or copied without the written permission of PracticeWorks Systems, LLC.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
QUALITY MANAGEMENT STATEMENT
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
MODULE ONE. AIM To understand the causes and spread of infection and be able to apply the principles of infection prevention and control.
Be Prepared For Change Are you Prepared?. Be Prepared For Change Are you Prepared?
§ Title: OSHMS Compliance Audit – OSHAD Expectations
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
OHSAS Occupational health and safety management system.
Health & Safety for School Governors Presented by Phil West Health and Safety Advisor RBWM.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
Successes criteria : All will be able to: You need to have a definition of legislation, policies and procedures then sate which ones do you have to follow.
NHS PAM Electrical Systems 2 nd June ) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.
Dinnington Business Centre Outgang Lane, Dinnington

Roles and responsibilities PM
UNIT V QUALITY SYSTEMS.
Contractor Control system
Contractor Control system
Premises Assurance Model
OHS–Occupational Health & Safety
Contractor Control system
How to conduct Effective Stage-1 Audit
S E C S The Complete Package outhfield ngineering alibration
HR AUDIT (An Early Evaluation System) (An Early Evaluation System) S.Jayaprakash., M.Sc (IT), PGD.HRM, DLL & AL.
Presentation transcript:

Copywrite SESC January 2009 Unit 26, Dinnington Business Centre Outgang Lane, Dinnington South Yorkshire S25 3QX Tel.: +44(0) Fax +44(0) The Complete Package S C S & outhfield ngineering alibration ervices Ltd. E

Copywrite SESC January 2009 QUALITY MANAGEMENT SE&CS Limited is dedicated to providing a services that meet the specific needs of our clients while maintaining exceptional quality. Our objective is to provide client satisfaction through the delivery of service, on time, and with continued support after delivery. We satisfy all regulatory requirements and are responsive to the needs of our customers and their employees. This policy will be achieved by empowerment of our employees, supplemented by the permanent objectives of senior management to continually improve the effectiveness of our Quality Management System. This policy will be communicated to all levels of our organisation and will be included as part of a regularly scheduled management review where the objectives of our organisation and the continued suitability and relevance of the Quality Policy will be examined. Our employees are a key ingredient for the success of our quality goals and the involvement of people at all organisational levels enables the organisation to benefit from their abilities. Senior management is committed to ensuring all employees have the skills, positive environment, training and resources to achieve our quality goals and to work at meeting or exceeding SECS Ltds internal and external customer expectations. All personnel have the responsibility, authorisation and organisational freedom to identify and record non-conforming product or service, and to initiate action to prevent the occurrence of any non- conforming service, product, process or quality system. Our employees are responsible for understanding and following this quality policy. SE&CS Ltds commitment to Quality is under pinned by the Managing Directors retention of the overall responsibility for the Quality Management System.

Copywrite SESC January 2009 DOUGLAS PHIN CONTRACTS & COMMERCIAL DIRECTOR QS, QUALITY MANAGER ALEX PHIN MANAGING DIRECTOR PRINCIPLE DUTY HOLDER, DESIGN AND INSTALLATION ENGINEERING MANAGER CAROL KERRY-ACCOUNTS & ADMINISTRATION HEALTH & SAFETY ADVISORS EMPLOYMENT LAW ADVISORS SENIOR ELECTRICAL TEST ENGINEER SENIOR MECHANICAL ENGINEER CALIBRATION ENGINEERS Company Organagram CALIBRATION ENGINEERS FIRE ALARM ENGINEERS EMERGENCY LIGHTING ENGINEERS AUDITORS, SURVEYORS & CDMC ADVISORS CALIBRATION ENGINEERS PAT TEST ENGINEERS ELECTRICAL CONTRACT MANAGEMENT ELECTRICAL SITE CONTRACTORS ANDREW CONNELLY ACCOUNTANT ELECTRICAL TEST ENGINEERS

Copywrite SESC January 2009 CORE SERVICES Tool & Equipment Calibration * Portable Equipment Testing Electrical Installation Periodic Testing ** Fire Alarm Testing Emergency Lighting Testing Sound Level Testing *Calibration, SE&CS Ltd go onto site in mobile workshops order to expedite audits for its clients. The problem being where tools are in daily use their accuracy drifts and have been altered over a number of years. Accuracy is checked against UKAS verified and calibrated equipment and existing equipment is compared and issued a certificate indicating deviation and variation from the standard device. Small adjustments and repairs are made on site and records amended. **Electrical Installation Testing, SE&CS Ltd go onto site in order to expedite the test and audit for its clients. The installations are tested and results recorded in accordance with BS 7671 and the condition of the installation is surveyed and noted in the engineers report for damage and miss-use. #For the purposes of costing and quoting a general site wide survey is undertaken by SE&CS Ltd to determine the extent audit prior to quotation so that the clients is appraised of the expected cost at the outset. Microwave Emissions Testing

Copywrite SESC January 2009 ADDITIONAL SERVICES ***Electrical installation, SE&CS Ltd were asked to go to site in order to expedite a problem for major client, the basic problem being that the electrical distribution had been altered over a number of years and existing drawings had not been amended by Electrical Contractors, SE&CS supplied the engineering & testing labour to the client on a day work basis. The site was completed surveyed and tested with CAD drawings, test certificates and distribution schedules were produced together with a condition report and photographic record of existing installation on a CD-ROM. Surveying, Condition, Structure & Measured * Surveying, Electrical Condition & Distribution ** Surveying, Fire Risk & Strategy (RRO Compliance) Design, Electrical Distribution *** Design, General & Emergency Lighting Design, Fire Prevention Design, Disabled Access & Signage *SE&CS Ltd are able to undertake a wide variety of surveys and audits as required by current legislation with regards to buildings, safety and access. Our consultants are highly trained, professional and qualified. **SE&CS Ltd are able to undertake a wide variety of design and. Our engineers are highly trained, professional and qualified.

Copywrite SESC January 2009 QUALITY SERVICES

Copywrite SESC January 2009 QUALITY SERVICES

Copywrite SESC January 2009 QUALITY SERVICES ASSESS: The extent of the task CONSULT: With the client on the task AGREE: On the extent and the cost COMMIT: To the time & date COMPLETE ASSESS CONSULT AGREE COMMIT PROCESS PROCESS: To undertake Procedures & Tests COMPLETE: Procedures, Services & Audits

Copywrite SESC January 2009 CUSTOMER LIST

Copywrite SESC January 2009 Thank you for watching the World of SECS Limited The concepts, logos and brands in this presentation have been commissioned by SECS Limited and remain the exclusive property of SPUTNIK Consulting / Jeremy Spake. They may not be copied or used without prior written permission. This presentation may not be stored in any form of retrieval system. Designed by: Media SPUTNIK Consulting & Design Produced on behalf of: SESC Limited SECS Limited is registered in England with limited liability No Credits