Huntsville City Schools Huntsville High School Softball Program Upgrades Jeff Gattis Construction & Renovation Coordinator January 9, 2018
HHS Softball Program Upgrades PROGRAM HIGHLIGHTS New Fieldhouse 45 Lockers with movable benches Lockers will have space for cleats, gloves and uniforms and will be lockable Restrooms will match existing Baseball Locker Room restrooms to include fully tiled walls and upgraded plumbing fixtures Coaches will be provided separate restrooms with showers, lockers with locks and storage space ( Shower is handicap accessible)
HHS Softball Program Upgrades A “Cubby” storage room is located at the entry vestibule for additional uniform storage The locker room will have direct access to the remodeled dugout The locker room will include brick and CMU walls, structural steel, shingle roofing, wood roof trusses, metal doors and frames and will be fully equipped with new heating and cooling systems.
HHS Softball Program Upgrades Indoor Hitting and Pitching Facility New hitting and pitching facility will be a pre-engineered building with metal siding, metal roofing and will be fully insulated Exterior walls will have CMU knee walls Two (2) separate hitting and pitching lanes that are separated by retractable netting High Quality turf flooring Three (3) roll-up doors for equipment access Direct access from new locker room area
HHS Softball Program Upgrades Exterior Plaza Plaza will have a decorative paved entrance way Plaza area will be fully landscaped and lighted Plaza will be fenced
HHS Softball Program Upgrades Floor Plan Floor Plan Here