Huntsville City Schools Huntsville High School Softball

Slides:



Advertisements
Similar presentations
Common Components of a Traditional Wood Framed Building
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Carriage house expansion at the Grover Cleveland birthplace
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
Building and Grounds Committee Mike Clarey, chairman Ken Plueger Tom Reuter Tim Pick Bill Anthony Fr. Matt Hewitt.
IIT – Bailey Hall – Graduate Student Housing – Existing Conditions
Addressing Highest Priority Facility Needs
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Civil Engineering & Architecture 2.3 Residential Design.
 Indoor batting cages are often used in climates where season weather does not permit outside activity. They can be beneficial in keeping batting practice.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Wood Frame Construction Common Components of a Traditional Wood Framed Building Gateway – Unit 7 – Green Architecture © 2012 Project Lead The Way, Inc.Green.
7 Set of Floor Plans Primary Considerations
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
Gore Public Schools Goals and Ideas over short and long term.
Common Components of a Traditional Wood Framed Building
Building Plans.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD CHATSWORTH HSChatsworth.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Orthographic Drawings
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
1 Town of Taghkanic Highway Department Highway Facility Addition and Salt/Sand Storage.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
APPLICATIONS OF TECHNOLOGY
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
White Pigeon Community Schools
Common Components of a Traditional Wood Framed Building
Warm-up 9/20/16 What is the underlayment called below the shingles?
Common Components of a Traditional Wood Framed Building
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Foundations of Technology Construction
Major Steps In Building a SFR
Objective 6.02 part 2: Recognize components of construction
Wood Frame Systems Civil Engineering and Architecture®
* 07/16/96 Site Development Plan * ##.
BOND ELECTION PROPOSAL November 12, 2013
Capital Improvements Presentation
Warm-up 9/19/16 What template are we using?
Raytown Quality Schools Bond Project Update
Shutter House Small Project.
INDOOR BASEBALL / SOFTBALL FACILITY
Commercial Construction Projects
Common Components of a Traditional Wood Framed Building
Carleton College Summer 2018 Science and Campus Construction Plan
Components of Construction
How & When to Get Permits for Work in Your Home
2018 Bond Review and Proposal
Common Components of a Traditional Wood Framed Building
Project S.O.A.R December 10, 2018 Meeting
New White Lake Township Library
Operations Department
Common Components of a Traditional Wood Framed Building
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Master Facilities Committee Evaluation and Identification
Proposed Facility Capital Project List
Huntsville High School Sports Lighting Upgrades
Common Components of a Traditional Wood Framed Building
LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI
The Edge Extreme Makeover.
Presentation transcript:

Huntsville City Schools Huntsville High School Softball Program Upgrades Jeff Gattis Construction & Renovation Coordinator January 9, 2018

HHS Softball Program Upgrades PROGRAM HIGHLIGHTS New Fieldhouse 45 Lockers with movable benches Lockers will have space for cleats, gloves and uniforms and will be lockable Restrooms will match existing Baseball Locker Room restrooms to include fully tiled walls and upgraded plumbing fixtures Coaches will be provided separate restrooms with showers, lockers with locks and storage space ( Shower is handicap accessible)

HHS Softball Program Upgrades A “Cubby” storage room is located at the entry vestibule for additional uniform storage The locker room will have direct access to the remodeled dugout The locker room will include brick and CMU walls, structural steel, shingle roofing, wood roof trusses, metal doors and frames and will be fully equipped with new heating and cooling systems.

HHS Softball Program Upgrades Indoor Hitting and Pitching Facility New hitting and pitching facility will be a pre-engineered building with metal siding, metal roofing and will be fully insulated Exterior walls will have CMU knee walls Two (2) separate hitting and pitching lanes that are separated by retractable netting High Quality turf flooring Three (3) roll-up doors for equipment access Direct access from new locker room area

HHS Softball Program Upgrades Exterior Plaza Plaza will have a decorative paved entrance way Plaza area will be fully landscaped and lighted Plaza will be fenced

HHS Softball Program Upgrades Floor Plan Floor Plan Here