Deep ExperienceLocal Focus Widest Range of TechnologiesBroad Customer BaseGrowth Platform Global Scale SEE goes north of the polar circle Christian Sigmund,

Slides:



Advertisements
Similar presentations
Edwardsport IGCC Mine Stabilization Project Construction at the Largest Remediation Mine Grouting Project in North America Presented by: Howard Concrete.
Advertisements

1  1 =.
TEMPERATURE CONVERSION
CONSTRUCTION DRILLING INC.
Cofferdam.
As one of the first steps in the retrofitting process, workers removed the existing concrete floor.
Construction of the new Kaiserschleuse lock in Bremerhaven
Water Delivery Systems for Horticulture Production in West Africa
CENTRE FOR BUILDING TECHNOLOGY Institute for Timber Engineering and Wood Technology, TU Graz / Austria Case study no. 10 Leonardo da Vinci project no.
Company Presentation.
The Seismic Dilatometer test (SDMT) in geotechnical inshore and offshore investigation Fino a qualche decennio fa le indagini geotecniche venivano eseguite.
Massimo Sacchetto Annalisa Trevisan CPT EXECUTED IN DIFFICULT CONDITIONS USING CPTWD AND FUTURE DEVELOPMENTS BRASIL September 2012 Porto De Galinhas.
Least Common Multiple (LCM)
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
Foundations and basements
Building Strong! IHNC SURGE BARRIER GIWW MRGO. Building Strong! Trestle Construction About 2000’ of trestle allows precision installation of piles and.
CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE.
Basic Coring Device: Components: Head Tube Cable Piston The Head attaches to the top of the tube. The piston is inside the tube and attaches to the cable.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Hybrid Pile n Definition –A pile installed by combining driven and auger/drilled techniques. n Why use a ‘Hybrid’? –by incorporating a ‘driven element’,
Foundation Fundamentals GSD 6204 Building Technology Harvard Graduate School of Design.
Basic Civil Engineering-Foundation
FOOTINGS.
Introduction to Deep Foundations.
TECHNOLOGY AND INNOVATION Substructure design, manufacturing and new concepts Stockholm, 2009 September 15 th INNOVATIONS IN DESIGN AND INSTALLATION.
Pad Foundation Lectured by: Ms. Noorhidayah Sunarti
Bridge Engineering (4) Foundations – Caisson Foundations 1. *Caisson foundations 1.1 IntroductionIntroduction A caisson is basically a structure.
Foundation Engineering CE 483
B ASEPLATES S LIDE S HOW. Anchor Bolts are positioned and placed in the concrete before it cures. Plastic caps are placed over the anchor bolts to protect.
FOFFF.
Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010 Case Study Session
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
SUMMARY FROM ACI 224.1R-93. When anticipating repair of cracks in concrete, it is important to first identify the location and extent of cracking. The.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
BY CHRISTOPHER. FACTFILE  Main port: Sullom Voe (Shetland) (oil terminal).  Oil vessels: Oil rig  Supply vehicles: Bristow helicopters and oil supply.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
Recent Construction Sites of Micropiles in Germany Thomas F. Herbst Wessling / Munich Germany 5th IWM 2003 Seattle – Session 2.
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
Foundation Loads Dead Load Live Load Wind Load
Research at Northwestern University: End-bearing Micropiles in Dolomite.
Drilling Interlocked O-Pile Walls with DTH + PPV FINLAND.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Procedures and.
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
COFFERDAMS.
Auckland Harbour Bridge By Tamashi. Pictures of the Auckland Harbour Bridge.
CAISSON FOUNDATION.
FOUNDATIONS.
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Part 10-2a Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. II-2013) (Part 10-2a, PP 2007, animation+p/r : compr.)
Best 20 jobs jobs sites.
CASE JEILL ENTERPRISE CO., LTD. KOREA.. ( VIEW OF JOB SITE-01 )
Construction Methodology for Suramadu Main Bridge.
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
Sardar Patel Institute Of Technology
Drilling and sampling in foundation engineering
Outline Introduction Test section details Axial load test results
Abandoned Wells Do you have an old well lurking in your yard?
STRAIGHT FORWARD DRILLING
EAG346-Sem II 2014/2015 Lesson 2.
B.V.Patel Institute of Technology-Diploma studies
Arch205 Materials and building construction 1 foundation
CONSTRUCTION METHODS & TECHNOLOGY
Harbors and Ports Engineering Geology – CE31FB2.
Arch205 building construction foundation
BASEPLATES SLIDE SHOW.
Scott McFarlane & Richard Merifield
BUILDING CONSTRUCTION Foundation
Presentation transcript:

Deep ExperienceLocal Focus Widest Range of TechnologiesBroad Customer BaseGrowth Platform Global Scale SEE goes north of the polar circle Christian Sigmund, Keller Austria

SEE goes north of the polar circle Narvik

SEE goes north of the polar circle Narvikterminalen, Norway

SEE goes north of the polar circle Narvikterminalen, Norway Narvik Harbor Slab AreaPile Area

SEE goes north of the polar circle Narvikterminalen, Norway First job Sealing slab

SEE goes north of the polar circle First job: sealing slab Most shallow pit – inclined

SEE goes north of the polar circle First job: sealing slab Deepest pit: 15 m / 10 m water

SEE goes north of the polar circle First job: sealing slab Deepest pit: 15 m / 10 m water 20% additional columns ! KCI in use!

SEE goes north of the polar circle First job: sealing slab

SEE goes north of the polar circle First job: sealing slab

SEE goes north of the polar circle First job: sealing slab

SEE goes north of the polar circle Narvikterminalen, Norway Second job Joint sealing between piles and rock

SEE goes north of the polar circle Second job: Joint sealing between piles and rock

SEE goes north of the polar circle Second job: Joint sealing between piles and rock

SEE goes north of the polar circle Second job: Joint sealing between piles and rock Procedure sea level sea bottom bedrock –25 m –60 m to –75 m ±0 barge with site installation auxiliary ship with crane steel pile Ø 1100 mm Initial situation; positioning of the barge / pontoon above the steel pile

SEE goes north of the polar circle sea level sea bottom bedrock –25 m –60 m to –75 m ±0 Second job: Joint sealing between piles and rock Procedure steel pile Ø 1100 mm steel pile concrete plug Soilcrete- drilling bedrock installation of rods; drilling down to the final sealing depth

SEE goes north of the polar circle sea level sea bottom bedrock –25 m –60 m to –75 m ±0 Second job: Joint sealing between piles and rock Procedure steel pile Ø 1100 mm grout bedrock steel pile Soilcrete- sealing execution of sealing element ; pulling out of the rods

SEE goes north of the polar circle sea level sea bottom bedrock –25 m –60 m to –75 m ±0 Second job: Joint sealing between piles and rock Procedure –75 to –90 m steel pile Ø 1100 mm Soilcrete- sealing installation of rods including a down the hole hammer; drilling down into the bedrock; pulling of rods

SEE goes north of the polar circle sea level sea bottom bedrock –25 m –60 m to –75 m ±0 Second job: Joint sealing between piles and rock Procedure Steel ties –75 to –90 m steel pile Ø 1100 mm grout Soilcrete- sealing injected grout steel tie Installation and injection of the steel ties

SEE goes north of the polar circle sea level sea bottom bedrock –25 m –60 m to –75 m ±0 Second job: Joint sealing between piles and rock Procedure steel pile Ø 1100 mm steel ties injected grout –75 to –90 m Soilcrete- sealing All steel piles of the new harbour area are now anchored into the bedrock

SEE goes north of the polar circle Second job: Joint sealing between piles and rock

SEE goes north of the polar circle Second job: Joint sealing between piles and rock

SEE goes north of the polar circle Second job: Joint sealing between piles and rock

SEE goes north of the polar circle Second job: Joint sealing between piles and rock

SEE goes north of the polar circle Second job: Joint sealing between piles and rock

SEE goes north of the polar circle Second job: Joint sealing between piles and rock

SEE goes north of the polar circle Second job: Joint sealing between piles and rock Drilling depth

Thank You!