Introduction Sign attendance sheet Owner: Jeff Ray – Project Engineer

Slides:



Advertisements
Similar presentations
(Individuals with Disabilities Education Improvement Act) and
Advertisements

Welcome! Statement of Qualifications Webinar
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Provider Training Request for Proposal Spring 2000 Bureau of Contract Management Department of Human Services.
PROCEDURES FOR SELECTING THE CONTRACTOR
RFP Overview Alan A. Phillips, CPPB CTPM Texas Southern University Summer 2012.
On Site Review Process Office of Field Services.
How Architects and Engineers Get Business with the State June 3, 2015.
How to Prepare for State Architect & Engineering Services and Upcoming Construction Projects How Architects and Engineers Get Business with the State May.
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project.
Illinois State Board of Education Innovation and Improvement Division January 13, 2010 An Introduction to the 21 st Century Community Learning Center Self.
1 Technical Assistance - PTAB Selecting and Hiring the Design Professional Dave Maxwell, P.E. Chairman, New Mexico Professional Technical Advisory Board.
1 Doing Business with the University of North Texas System September 2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
On Site Review Process Office of Field Services Last Revised 8/15/2011.
Louisville District BUILDING STRONG Selection Success “How to Put Your Best Foot Forward” Chris Karem, P.E. January 2009.
Request For Qualifications (RFQ) Missouri Local Programs How to Complete the RFQ & Get it Advertised.
Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.
COMPULSORY BRIEFING SESSION Enterprise Wireless Solution (Wi-Fi) RAF /2015/00022 Date: 18 January 2016 Time: 11:00.
Informational Webinar Troy Grant Assistant Executive Director for P-16 Initiatives Tennessee Higher Education Commission.
Designer selection procedures. Legal framework Article 3D. Procurement of Architectural, Engineering, Surveying Services, and Construction Manager at.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Procurement & Strategic Sourcing
Continuing education: Delivering Quality Programs Across Texas
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Procurement & Strategic Sourcing Commercial Print Services
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Sanitary Sewer Lift Station Rehabilitation Design Services Pre-Submittal Meeting September 20, 2016.
Procurement & Strategic Sourcing
RFP Health Education center furnishings
Pre-Proposal Conference
Award Management Services
TRAVEL SERVICES Request for Proposal
Readiness Review Course
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
United Way of Tulare County
Agenda Introductions Pre-Submittal Topics RFQ Purpose
Consultant Selection Training
“How We Do Business”.
Request for Proposal and Specifications for
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Request for Proposal and Specifications for
Funding Opportunity Announcement Number: HRSA
PRE-PROPOSAL MEETING, January 25, 2018 Contract No.:
City of Phoenix Request for Qualifications and Scoring Process Update
San Benito County Local Transportation Authority Request for Proposals # Operation of San Benito County Express and Specialized Transportation.
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
ApprenticeshipNC Regional Collaboration and Expansion Project
Oral statements or discussion during the pre-bid meeting today will not be binding, nor will it change or affect the terms or conditions within the Plans.
How to Prepare a Quality Modification Request
Russell Center Small Research Grants Program
OCPS CCNA SELECTION COMMITTEE TRAINING
ENTERGY SERVICES, INC. February 23, 2006
North American ALMA Development Program
DOTD Form September 4, 2014.
TEXAS DSHS HIV Care services group
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Brieana Reed-Harmel, Broadband Project Manager
Diversity management system (DMS)
Project Manager / Utility Liaison
Oral Statements Oral statements or discussions during this Pre-Submittal Conference will not be binding, nor will they change or affect the RFQ or the.
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

Introduction Sign attendance sheet Owner: Jeff Ray – Project Engineer Plants and Major Projects Stella Manzello – Contract Administrator SAWS Contracting Angelica Mata – Contract Administration Manager

Oral statements or discussion during the SOQ Pre-Submittal Meeting will not be binding, nor will they change or affect the RFQ or the terms or conditions of the contract. Changes, if any, will be addressed in writing only via an Addendum.

Notification of Selected Firm Interviews (if necessary) RFQ Schedule SAWS Board Award January 2018 Notification of Selected Firm October/November 2017 Interviews (if necessary) October 2017 Proposals Due September 25, 2017 By 2:00 p.m. Answers Posted September 15, 2017 10:00 a.m. Questions Due September 12, 2017 By 4:00 p.m.

Contract Requirements The project shall be designed by licensed Professional Engineer(s). The Consultant’s Project Manager, a licensed Professional Engineer in the State of Texas, shall be available to meet with SAWS staff at the SAWS Headquarters and/or SAWS project site with minimal advance notice if requested. Any management or team change during the execution of the project shall not have any effect on the progress, budget or schedule of the project. SAWS reserves the right to approve personnel changes. The project shall be managed through SAWS’ Contract and Project Management System (CPMS).

Evaluation Process Qualification statements are received Contracting reviews for responsiveness Technical Evaluation Committee will score qualification statements Good Faith Effort Plan will be scored Selection Committee reviews and recommends Interviews Negotiation Board Award

Evaluation Criteria Experience in Similar Projects – 35 Points Project Team, Resumes, and Qualifications – 25 points Project Understanding and Approach – 25 Points SMWB Participation – 15 Points

Submittal Package Submittal Response Checklist Verify that the checklist is signed and that all documents on the checklist have been included with the proposal Respondent Questionnaire Acknowledgement of Security Procedures, Addendums, and Contract Terms and Conditions Experience in Similar Projects List and describe 3 relevant projects within last 7 years your firm served: Names of client and location (city and state) Corresponding year and duration of assignments Brief description of projects Schedules and construction budgets of projects, major challenges/issues and solutions offered Respondent’s role and team members’ responsibilities in projects Reference contact to include names, titles and a current phone numbers, which has been previously verified. Firm’s record of performance

Submittal Package (Cont’d) Project Team, Resumes, and Qualifications Organizational chart identifying key personnel (including sub-consultants) with resumes Additional skills, experience, and/or qualifications specific to your firm Project Understanding and Approach Detailed approach explaining how Respondent’s Project Management Team would execute and complete the services

SMWVB Requirements SMWVB Certification accepted from the following entities: South Central Texas Regional Certification Agency Texas H.U.B. RFQ Scoring: Up to 15 Points 40% SMWB goal Local Office Small Business Enterprise (SBE) Veteran-owned Business Enterprises (VBEs): Not eligible for points, but tracked for participation.

SMWVB Questions Questions related to SMWVB may be directed to SAWS’ SMWVB Program Manager, up until the RFQ is due. Her contact information is as follows: Marisol V. Robles Contract Administration Department San Antonio Water System Email Address: Marisol.Robles@saws.org Telephone No.: 210-233-3420

Submittal Packet Reminders Maximize points by addressing all required items requested in the RFQ Be very specific in responses and avoid “boiler plate” responses Highlight areas that are unique to your firm Contact the SMWVB Program Manager for assistance Utilize the Submittal Checklist Ensure all items included and all documents signed Responses are limited to 15 pages* (required forms do not count – nor do tab dividers) Submit electronically

Additional Reminders Please register through SAWS Vendor Registration Program on the SAWS website at www.saws.org to ensure access to the latest information. To receive updates on specific projects, registered vendors must ‘Subscribe’ to the project by selecting the project, and clicking ‘Subscribe’ under the Notify Me box.

Addendum No. 1 Posted on Wednesday, September 6 Corrected page limit from twelve to fifteen. Removed State of Texas licensing requirement. Project shall be designed by a licensed Professional Engineer(s), but licensing does not need to be in Sate of Texas. Requirement of Consultant’s Project Manager does not change – PM must be licensed in State of Texas.

Communications Reminders Upon release of the RFQ until the contract is awarded, there should not be any RFQ-related communication with SAWS: Project Directors Project Managers Project Engineers This includes phone calls, emails, letter, or any direct or indirect discussion of the RFQ

POC and Technical Questions Should be submitted no later than Tuesday, September 12, 2017 at 4:00 p.m. CDT Must be in writing: Stella Manzello Contract Administration Department San Antonio Water System Stella.Manzello@saws.org

Submission Due Date Responses due electronically no later than 2:00 p.m. CT September 25, 2017 Submit at least 2 hours ahead of time SAWS will provide a response via email acknowledging electronic submission File size limit is 10 MB

Production Site – Typical Radio Panel

Production Site – Typical SCADA Panel INDOOR OUTDOOR

Anticipated Scope PLC replacement at approx. 60 primary water and booster pump stations, and SCADAPack controllers at approx. 5 District Special Project (DSP) facilities Evaluation of current radio broadband communication system for optimizing this system to provide secure and reliable communications for approx. 60 existing primary water and booster pump stations, Headquarters and a data recovery center Replacing radio communication system with a communication infrastructure that includes high speed, Ethernet IP radios, antennas, communication towers and backup power including emergency generators and / or uninterruptible power supplies

Anticipated Scope, Cont. Conduct radio path study for each site location, and field verify each site location for acceptable signal strength: Path studies will address and correct any issues, including, but not limited to, instances where signal strength is inadequate for proper operation of transmitting data across radio system. Path studies will include investigation of redundant/alternate paths for each repeater site Path studies of both computer based and physical (field verified) will be completed and results included in a Technical Memorandum. Results shall include field verifications and radio signal strengths, as well as investigation of redundant/alternate paths for each repeater site.

Anticipated Scope, Cont. Evaluation of potential removal of existing antennas located on Production tanks that are included on this project; evaluation will include brief scope of work and cost estimate for each applicable site, but not a design Control Narrative and Performance Specification may be required Reroute/extend water drain lines and addition of water sample lines for existing chlorine analyzers at approx. 15 water production facilities; Water drain lines are an approx. diameter of 2-inches; Water sample lines are an approx. diameter of 1-inch

Anticipated Scope, Cont. Geotechnical and field survey, potholing and subsurface utility investigation, and coordination with other utilities, agencies and consultants Miscellaneous civil site and improvements work Construction inspections, pre-start-up and start-up/commissioning during construction of project

Questions