Investment Work Package I.2 H2 to Transportation Fuels:

Slides:



Advertisements
Similar presentations
Hydrogen Filling Station and related renewable energy projects Center for Energy Research at UNLV.
Advertisements

International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Smart Energy Campus September 16, Project Overview  Workforce Training  Solar PV  Solar Thermal  Small Scale Wind  Plug-in Hybrid Electric.
Wind-to-Hydrogen Project: Advanced Testing & Results Kevin W. Harrison NREL National Hydrogen Association Long Beach, CA May 4, 2010 NREL is operated by.
COMPANY PRESENTATION COMPETENT ENGINEERING FOR YOUR BUSINESS SUCCESS.
Michigan’s Hydrogen Rules Department of Environmental Quality.
SOLAR PUMPING March 7 th Solar Pumping / ¿What is Solar Pumping? Solar Pumping consists in supplying water pumps with the energy generated by.
NATIONAL INSTITUTE OF AEROSPACE TECHNOLOGY Rosa Mª Rengel Gálvez Marina B. Gutiérrez García-Arias 11/09/2007 Rosa Mª Rengel Gálvez Marina B. Gutiérrez.
Copyright of Shell Alternative EnergiesMay 5, HYDROGEN REFUELING COST REDUCTION TO ENABLE COMMERCIALISATION National Hydrogen Association 2010 Conference.
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
CONFIDENTIAL Combined Vehicle Fueling and Back-Up Power Applications National Hydrogen Association Annual Conference May 5, 2010.
The project finance termsheet Broad characteristics: 12 mln USD for expansion of power plant. Two year grace (construction) period, reimbursement over.
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
By Jack, Mike, Terrance, and Mohammad. Construct a city that consumes hydrogen as its primary fuel, we need an abundant energy and water supply, a hydrogen.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
The Home Energy Station - More than a distributed Hydrogen refueling solution Dr. Jim Winkelman Plug Power Inc. International Conference on Automotive.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
1 September 13, 2007 Engineering Advancement Association (ENAA) of Japan Sam Miyashita Hydrogen Safety R&D and RCS process in Japan.
AQMD’s Five Cities Program: Demonstrating Hydrogen Vehicles and Infrastructure Patricia Kwon South Coast Air Quality Management District.
PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011.
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
By: E. Anderson, S. Szymanski, and L. Dalton
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015.
Experience from large helium inventory management at CERN ILC Cryogenics and Helium inventory meeting CERN, Wed. 18 th of June 2014 D. Delikaris Technology.
Integrating Hydrogen Fueling Station Into An Existing Fueling Station Mathew Thomas NHA Hydrogen Conference and Expo ∙ May 3-6, 2010 ∙ Long Beach, California.
Efficient Hydrogen Refueling Station Design NHA, Long Beach, CA 5 th of May 2010 Alistair Wardrope ITM POWER | Efficient Hydrogen Refueling Station Design.
E Fuel Cells and Hydrogen. Erection and maintenance of energy plants Financing of energy projects Construction and operation of electricity.
ANASOFT VIATUS. Challenges Supply chain optimization is necessary for achieving competitive price of final products Synchronization and utilization of.
Boiler Operations, Maintenance and Performance Conference.
About company Kurgankhimmash is the leading Russian company manufacturing process equipment for oil & gas producing, oil & gas refining, chemical, energy,
Progress Meeting 20 Nov 2012, Karlsruhe LEADER 1LEADER1 WP1 REFERENCE DESIGN OBJETIVES AND SPECIFICATION (SCK-CEN)
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Dena Grid Study II Integration of Renewable Energy Sources in the German Power Supply System from with an Outlook to 2025 Jaakko Iivanainen.
Making use of Energy lesson 8
Belenos Clean Power Holding Ltd
ROOFTOP SOLAR PHOTOVOLTAIC SYSTEM
Progress Briefing - Energy Initiative
The New C55* CPVSd 10-20hp People. Passion. Performance.
Uniper Energy Services
SHS Packages for ERC-Regulated SHS Electricity Service of ECs
Renewables: Moy Wind Farm
42-a Machine st., 101 Yekaterinburg Russian Fediration Phone:+7(343)
PRESENTATION OF MONTENEGRO
Infrastructure & Safety
China’s Fuel Cell Vehicles Technology Roadmap1
Component Availability Effects
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
CNG Refueling Technique & Smart Fill

ESS RF Development at Uppsala University
ChE 473K Plant Design R. Bruce Eldridge.
Thomas MAZOUR IAEA, Div of Nuclear Power/NPES
Investment Work Package I.2 H2 to Transportation Fuels:
Status of Hydrogen System Development
System of solutions for non pollution inland transportation
GenComm Workshop Galway, Ireland 16/11/2018 GenComm Workshop.
GenComm Workshop Stornoway Scotland 22/11/2018 GenComm Workshop.
City of San Mateo WWTP Site Layout for newly constructed
Opportunities for Hydrogen-Based Energy Storage for Electric Utilities
It’s 2018…so What’s new with landfill gas?
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Multi-operators sites Some French case studies
CYnergy Kick-Off Meeting
Renewable Power to Fuels Symposium
Presentation transcript:

Investment Work Package I.2 H2 to Transportation Fuels: Solar-fueled H2 refueling station (HRS) Stornoway, June 26./27.st 2018

Agenda WP Progress WP Adjusted Timeline Design Results Procurement Process Steps Ahead

WP I.2 Progress 2018 2019 2020 Pre-Design Risk Analysis Selection Status June 2018 2018 Risk Analysis Selection refined-Design Procurement Contracts Technical Review Risk Mitigation Permits Civil work Installation 2019 Installation Commissioning Monitoring Analysis Installation Analysis Replication 2020 SWOT

Authorities engineering Timeline WP I.2 Pre-Design Procurement Risk assessment Authorities engineering Civil work Plant construction SAT Operation

Main Distribution Panel WPI.2.1 Design Results Dispenser 700 barg 6 kg H2 600 km LT:30 min PV Array DC/AC 35 kWp Electrical Grid 70 KVA/3Ph/400V Main Distribution Panel Electrolyzer 5,0 Nm3 H2/hr @32 barg Compressor Bank Multi-Stage´Compressor Multi Stage Storage (Seasonal and Loading) Storage* 55 kg H2 (Seasonal & Loading) Water Supply 30 L/h @3-5 barg

Fig1.H2 Refueling Station Location (Source Google Maps) WP I.2.1 Design Results PV Array Fig1.H2 Refueling Station Location (Source Google Maps) Station (Incl. security clearance) IZES GmbH SCOPE Location: Innovation Campus Saar Saarbrücken, Germany Semi-Autonomous Operation (PV Array) 700 barg loading Seasonal and Loading Storage (1 Vehicle)* Peak Production Expansion Water Treatment Unit Containerized Solution Monitoring and Plant Management System

WP Design Results

WP I.2.1. Design Results Design: Refining Hydrogen Quality adjusted to SAE2719, Cost optimized Compressing conditions simulated and suggestions for energetic optimization Filling conditions modified, according to vehicle manufacturers claim Cost optimized

WP I.2.1 Risk and Mitigation Explosion Protection (reject zones) Fire Protection (fire loads) Respect securtiy distances to buildings and storages (3 m Horizontal, Vertical Vent Clearance) Noise Levels: <65 dBA in operation >45 dBA idle Third Party certified Permit Process Route: Supplier & IZES => ZÜS & TÜV (Comissioner) => Construction and Operation Authorities

WP I.2.2 Procurement RFO as a basis for Suppliers (4 Offers Received) Turn-Key Solution, Self-Contained, Outdoor Solution. Components: Electrolyzer: Initially 5 Nm3/hr Water Treatment Plant Gas Conditioning Equipment: 99,999% of H2 Compression Bank: Sufficient to load 6 kgs @ 700 bars Storage Tank: 50 Kg- Minimum Overall (Flexible for different pressure steps) Dispenser: Sufficient to load 6 kgs @ 700 bars. LT: 30 mins Facility Control System: Plant Slave of the PV Array/Normal Mode Warranty: running hours dependant *The plant will not be fully fit for a commercial application! (Modelling should resolve this!)

Thanks! IZES gGmbH Contact Points Bodo Groß, gross@izes.de Wulf Clemens clemens@izes.de