P15311: PCB Router Phase 5 System Pass Off with Customer

Slides:



Advertisements
Similar presentations
Sponsored by the U.S. Department of Defense © 2002 by Carnegie Mellon University July 2002 Pittsburgh, PA Lecture 6: Team Planning.
Advertisements

Christian Seemayer Rob Proetti Tim DeBellis Tim Giguere Will Kelly.
Project Review. Current State Currently on track to meet our mission objectives and cover all customer needs – Unpredictable to know whether or not sensors.
MSD-II Project Review Modular Motion Tracking Sensors 1.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Process, Communication, and Certification Padma Venkata
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
P08009 Audible Memo Board Phase II Monday, October 22, 2007 P08009: Audible Memo Board Phase II Sponsor: Tala Hopkins Jon GosligaAudio Output Lead Loic.
Planning. SDLC Planning Analysis Design Implementation.
Vladimir Liberzon Oksana Sakhraui Victoria Shavirina Spider Management Technologies, Moscow, Russia
P14311: PCB Isolation Routing System Final Presentation Team Members: Matthew Clark, Marley Collier Sears, Sarah Duman, Richard Kalb, Joseph Post, Zoe.
Blackboard Strategies: Using Blackboard Pedagogically.
System Implementation. System Implementation and Seven major activities Coding Testing Installation Documentation Training Support Purpose To convert.
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
From Research Prototype to Production
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
ECE445: The Design Review Raj Vinjamuri February 3, 2014.
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Analysis Design Implementation System Integration and Testing Maintenance.
Request for Proposal (RFP)
T Project Review Sotanorsu I3 Iteration
ECE445: The Design Review Sept 2, Documentation Roadmap Request for Approval Proposal Design Review Final Paper &Presentation Sept 10Sept 16Sept.
ECE398: The Design Review Fall What the Design Review is  Board meeting with engineers- (faculty, TA, classmates)  Structured discussion of your.
T Project Review RoadRunners [IM3] Iteration
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
P15311: Isolation Printed Circuit Board Router (Rev2)
Project Management. Introduction  Project management process goes alongside the system development process Process management process made up of three.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
CNC Assembly: 3 axis rigid PVC structure NEMA 17 Motors and lead screws Off the shelf Router and Specialty collet Vacuum Table to hold down work piece.
T Project Review RoadMappers I2 Iteration
Section 1: Mission Overview Mission Statement Mission Objectives Expected Results System Modifications Functional Block Diagrams 2.
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
P15311 Customer Requirements vs Results Customer Rqmt. #ImportanceDescriptionP14311 StatusP15311 Status CR13 Capable of routing traces for finer pitched.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
T Project Review Sotanorsu I2 Iteration
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
MyFloridaMarketPlace CRB Meeting October 27, 2006.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Subsystem Build & Test Review
Groupname [PP|…|FD] Iteration
Project Management Chapter 3.
P07307: Controls for Dynamic Suspension
Project Management and Information Security
T Project Review Group: pdm I2 Iteration
IEEE Std 1074: Standard for Software Lifecycle
Session 5b Dr. Dan C. Surber, ESEP
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
CPMGT 300 Education for Service/snaptutorial.com.
Request for Proposal (RFP)
P17082 Biomechanical Elbow Model Build and Test Review
Chapter 10 Systems Implementation and Operation
Engineering Processes
P17082 Biomechanical Elbow Model Final Presentation
Game Design Mr. Gebhart.
CLINICAL INFORMATION SYSTEM
Project Management Process Groups
P15311: PCB Router Phase 4 System Demo with Customer
P17082 Biomechanical Elbow Model Build and Test Prep
Chapter 6 Activity Planning.
Modern Systems Analysis and Design Third Edition
P11017 Tactile Navigation Interface
Cases Admin Training.
Team P16228: Magnetically Levitated Propeller
Detailed Design Review (Phase 4)
Detailed Design Review: P18001
Formula Hybrid - Fall 2018 Lafayette College ECE 491.
Modern Systems Analysis and Design Third Edition
Presentation transcript:

P15311: PCB Router Phase 5 System Pass Off with Customer December 8, 2015 11/13/2018 P15311

Objectives To demonstrate that the project is meeting technical, process and individual contribution requirements: Project has met cost, schedule and technical requirements Problems and risks have been successfully being managed All team members are engaged, workload is balanced and are meeting their commitments 11/13/2018 P15311

Agenda Deliverables: Additional Processes: Individual Contribution: Closure of Phase 3 and 4 action items Project summary Test verification & documentation Problem Tracking Risk Deliverables Critical action items Additional Processes: Customer & guide engaged Use of feedback Team functioning Documentation Execution of demo Individual Contribution: Work level & results Adherence to Norms & Values/Peer Review Effective communication Other topics Discussion on customer feedback 11/13/2018 P15311

Closure of Phase 4 Deliverables Status Finish Rewire of Power and Controls Complete Refine I/O, Power, and Controls Schematics (Based on Final Rewiring) Update BOM and final Documentation In progress Finish system level testing- Power test 5s and machine labeling In progress (final touches) Complete final manual drafts In progress (need pictures) Perform long term testing Tool life Time to machine failure 11/13/2018 P15311

Project Summary Element Status Schedule: Putting finishing touches on project including labeling, final document updates, and final revisions of manuals. Cost: Operated within budget with about 20% reserve ($360) Technical: All systems tested and meet customer expectations, noting: Power test still in progress Long term testing not being performed Risk: Risk dropping according to plan. Major remaining concerns are: Robustness of Mach3 software program Tool life Board flipping 11/13/2018 P15311

Old System Areas for Improvement Added features Vacuum table Debris collection Overtravel switches Power wiring I/O Board Electrical parts Monitor mounts Video feedback Spindle replacement Cable management Added features Auto homing User control panel Pressure gauge 11/13/2018 P15311

New System 11/13/2018 P15311

Schedule Devon Joe Yev Tom Make mechanical adjustments as necessary Performed board leveling adjustments Edited new I/O board design Implement “nice to have” items ordered late Assisted EE team Assisted in I/O board fabrication Ran several boards Perform mach3 debugging Final Mechanical fixes Trialed board flipping procedures Ran circuit boards!!! Ran circuit boards Assisted with troubleshooting manual Soldered custom made board Compose technical paper Composed Poster Finalized homing button and code Manage schedule, budget, and presentation materials Created PowerPoint presentation for Thursday Addressed future improvements Finished schematics Incomplete: Complete indented BOM Incomplete: Tool life optimization 11/13/2018 P15311

Schedule Nate Kenny Emily Trouble-shooted Auto-homing with Tom and Kenny Completed I/O List and I/O Board Schematics Finished Manuals and SOP Constructed Schematics for components in the Power Panel Help Tom solder new Isolation Routed PCB Updated Risks Attempted the power test with a current probe Helped with Auto-homing User Panel Button code Updated Edge Attempted the power test with power resistors Found Mach 3 LED macro code (for E-stop state) 5s of machine Assisted Yev in Poster Design 11/13/2018 P15311

Budget Team Budget: $2,000 11/13/2018 P15311

Subsystem Test Performance Number Date (scheduled) Requirement Actual Result Mitigation Vacuum Table Holding force 18 09.11.15 5 lb. (min) 10 lb. (nom) 15 lb. Debris Collection Flow 8 10.1.15 4.0 m/s (min) 5.75 m/s (nom) 4.5 m/s OK with customer Spindle and Camera Speed, Runout, & Feedback 7 17 04.17.15 05.11.15 12k RPM (min) 0.0006 in. (min) Visual at Bit 15k RPM 0.0005 in Confirmed User panel Switch func. 11 10.28.15 11.3.15 Switch circuit tested Pass Integrate @ System Auto Homing & over-travel accuracy Flags & Code Repeat Home Motor shutoff 3 21 10.6.15 05.4.15 Working Together 0.005 in. (min) 0.0005 Keyboard & monitor mounting Mounting Sufficient 20 Aesthetics/ Comfort Power & control I/O Board Connections System Power 11.2.15 Connected & Operable I/O and power Verified Finished Install 11/13/2018 P15311

Systems Testing System Test # Date (Scheduled) Requirement Actual Result Mitigation Performance Tool Replacement Time 12 10.7.2015 2 min (max) 1 min (nom) 40 s Auto Homing Auto Homing System 4 10.6.2015 .005 in (max) .001 in (nom) .0008 in Debris Collection Percent Debris Collection 14 10.14.2015 75% (min) 95% (nom) All airborne OK with customer Mill and Drill Bit Evaluation 13 10.27.2015 50 hrs (min) 100 hrs (nom) 60 hours run time Marginal, Drill bit decided on Trace Capabilities 15 10.19.2015 .02 in (max) .016 in (nom) 0.012 in Max Power Analysis 19 1920 (max) 1800 (nom) In progress Safety Noise Generation 9 105 dB (max) 75 dB (nom) 74.9 dB Usability Set Up Study 10 10.28.2015 < 10 min In Progress Ease of Use Study 11 11.3.2015 < 45 min Aesthetics Assessment 20 Uncluttered & pleasing Pass Failure Time/Reliability 16 11.4.2015 > 50 hrs Not Done Test will not be performed due to time

Problem Resolution Completed Items Open I/O board grounding issue Getting reliable positioning on board flip Problem Tracking Sheet Edge Link 11/13/2018 P15311

Edge Link to Problem Tracking Sheet Risk Analysis Edge Link to Problem Tracking Sheet 11/13/2018 P15311

Deliverables System Function System Testing Wiring Diagrams Schematics Drawings BOM Final Technical Paper Final Poster Final User Manuals Edge Link to Manuals (near bottom of page) Edge Link to Deliverables 11/13/2018 P15311

Additional Processes Customer and Guide Engagement Customers: RIT and Jeff Lonneville Jeff has been engaged for the phase 4 system demo and phase 5 final pass off Input from RIT has come in the form of meeting with safety personnel and student/faculty surveys Guide: The team has made a conscious effort to clear up the misunderstanding of the first few weeks and engage the guide as needed for the project, paper, and presentations 11/13/2018 P15311

Additional Processes (cont) Use of Feedback Taking increased guide input into consideration Performing peer evaluations post-review Team Functioning The team has adjusted to concerns regarding being late and doing other work during class time The team has increased correspondence via email and text message Documentation All files are on edge BOM and drawings/schematics need final revisions Execution of Demo Demo can be preformed on day of review with positive customer feedback 11/13/2018 P15311

Individual Contributions Workload is even throughout team Each team member has put in extra hours in order to finish the project completely and on time Individual performance items have been discussed Excess budget may be allocated to team dinner 11/13/2018 P15311

Things to Come Power test Final usability tests 5s-ing machine Final detailed manuals 11/13/2018 P15311

Questions? 11/13/2018 P15311