Jim Cordes Cornell University

Slides:



Advertisements
Similar presentations
SKA New Technology Demonstrator Ray Norris CSIRO Australia Telescope National Facility.
Advertisements

Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review M3 Wave Energy Systems (TRL System) PI: Mike Morrow M3 Wave Energy Systems.
Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.
5-6 May 2009 AWG Meeting LAX1 Technology Development Project US contributions to global.
DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.
LIGO-G W LIGO Laboratory1 Educational Outreach Across LIGO Funding source: »LIGO operations »IPSE proposal submitted in 2003 (pending) »Advanced.
US Technology Development Project for the SKA Jim Cordes AWG Meeting March 2008, San Francisco SKA Context TDP work plan Constraints and considerations.
Introduction Breadth How it Works The Next Steps.
22 May 2008Lynn Baker USSKA Consortia Meeting Washington, DC1 Project Manager, Responsibilities and Tasks –Coordination between groups within the TDP –Promote.
SKA TDP Advisory Committee Report to US SKA Consortium, 17 November 2008, Madison Trish Henning.
22 May 2008 Jim Cordes US SKA Consortium Meeting Washington, DC1 Technology Development Project Presentation TDP OverviewJim Cordes »Programmatics »International.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
2013 Strategic Plan. Strategic Committee Timeline June Strategic Planning Meeting August Board Meeting November Board MeetingJanuary Officers Meeting.
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
SKA – The Reference Design Peter Hall SKA International Project Engineer, ISPO Next-Generation Correlators Workshop Groningen, June.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
Advancing GSMT SWG Recommendations: AURA’s Proposal to the NSF Stephen E. Strom AURA New Initiatives Office Presented to the GSMT SWG 12 February, 2004.
Presentation to the Biological and Environmental Research Advisory Committee December 3, 2002 by David Reichle 1 An Evaluation of the Department of Energy’s.
1 The SURA Regional Infrastructure Initiative Gary Crane Director, SURA IT Initiatives Southeastern Universities Research.
NRAO Users Committee Meeting May 20-21, National Radio Astronomy Observatory NRAO Users Committee Meeting – May 20-21, 2008 ALMA Operations Chris.
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
OOI CyberInfrastructure Workshop: Ocean Observation Programs Preparation Phone Meeting May 5, 2008 Alan Chave, Michael Meisinger OOI CI System Engineering.
SKA Dishes, CSIRO February 2013 SKA Dish Verification Antenna #1 Gary Hovey Astronomy Technology Program – Penticton 12 February 2013.
Peter Wilkinson1 Conclusions 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS aims to –Demonstrate SKA Scientific Viability and Readiness –Demonstrate.
Developing an Electronic Dossier System for UCLA Faculty: Planning Proposal Presentation to Committee on IT Infrastructure November 30,
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
Outline What are RII awards? What is the application process? What’s the timeline?
P.NapierEVLA Advisory Committee, 11 June EVLA Phase II Implementation/Funding P. Napier.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Strengthening Communities Awarded to support the development and implementation of collaborate and innovative community projects that address economic.
CAREER WORKSHOP APRIL 6, 2015 Overview of the CAREER Program Beth Hodges Director, Office of Proposal Development FLORIDA STATE UNIVERSITY.
H Philip Diamond RadioNet Coordinator University of Manchester Jodrell Bank Observatory Implementation Plan for next 18 months MTR: 12 April 2007 Grenoble.
June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010.
Midwest Big Data Hub Letters of Intent for NSF Edward Seidel Director, NCSA Founder Prof. of Physics, Prof of Astronomy On behalf of the Midwest.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Strengthening Communities Awarded to support the development and implementation of collaborate and innovative community projects that address economic.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
IntegratedCorridorManagement 1 Integrated Corridor Management Overview and Activities Jeff Lindley Director, Office of Transportation Management FHWA February.
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers & Jim Ulvestad NRAO 15 Oct 2009 USSKA Consortium Meeting.
The SKA: Next Week, the Next 3 Years & Beyond Jim Cordes, Cornell University 24 August 01  Concepts  Science Goals & Payoffs  Configurations, Modes.
The Square Kilometre Array Dr. Minh Huynh (International Centre for Radio Astronomy Research and SKA Program Development Office) Deputy International SKA.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Update On The Square Kilometer Array World Space Congress October 15, 2002 Jill Tarter.
Mid-Scale Projects Vernon Pankonin Team Leader. Mid-Scale Projects Programmatic Characteristics Not a formal funding program. Collection of proposals.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
17 November 2008Lynn Baker US SKA Consortia Meeting Madison WI1 TDP Activity Report Lynn Baker US SKA Consortia Meeting Madison, Wisconsin November 17,
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers NRAO 14 May 2009 USSKA Consortium Meeting Washington,
November 1, 2016 New Hanover County Schools By: Dr. Tim Markley
Bureau of International Cooperation Chinese Academy of Sciences (CAS)
Medichats 14 October 2008 ADC bit number and input power needed, in new radio-astronomical applications View of the Medicina Radiotelescopes - Italy Eng.
ATACAMA CCAT : The Cornell-Caltech Atacama Telescope
Mid Frequency Aperture Arrays
Multi-state Corridor Pooled Fund Program
Student Activities Centralized Training
Need for the ATA SKA Development Facility
Student Activities Centralized Training
Rick Perley National Radio Astronomy Observatory
Technical Foundations & Enabling Technologies – DS4
Joint Project UCB RAL SETI Institute
Mark McKinnon EVLA Project Manager
SKA PEP - Dish Array WP5 Phase 1 Dishes with Single Pixel Feed Systems
A Draft Funding Model for the SKA
EVLA Operations Jim Ulvestad
Future Radio Interferometers
Government Funding CABC March 2019 Presented by: Samad Hosseini Thinker Technology Disclaimer: the information is.
Preliminary Project Execution Plan
Presentation transcript:

US Technology Development for the Square Kilometer Array The Large-N/Small-D Concept Jim Cordes Cornell University To be covered: (1) perspective on radio sky coverage w.r.t. the high-energy sky. (2) kinds of sources expected or hoped for (3) technical capabilities of the SKA needed (4) time frame 11/13/2018 SKA2004 Penticton

US SKA Consortium Purpose: to coordinate SKA activities in the U. S US SKA Consortium Purpose: to coordinate SKA activities in the U.S. Chair: Yervant Terzian (Cornell) Vice Chair: Jack Welch (UCB) Caltech/JPL Cornell/NAIC Harvard/Smithsonian MIT/Haystack NRAO NRL SETI Institute UC Berkeley University of Illinois University of Minnesota University of New Mexico University of Wisconsin Virginia Tech 11/13/2018 SKA2004 Penticton

US NSF Support Current NSF Support: 3 yr/$1.5M grant from the Advanced Technology and Instrumentation program TDP Proposal Guidelines from the NSF June 2003 Discussion and outline phase July-Sept 2003 Task identification and organization October 2003 Development of TDP Management Plan November 2003 (approved) Identification of workplan, tasks, timeline, budgets, and writing Oct 2003 – Feb 2004 Submitted to the NSF March 2004 Reverse site visit to the NSF October 2004 Initial funding 2005.0 (?) 11/13/2018 SKA2004 Penticton

The US SKA Consortium’s Technology Development Project Overarching goal: develop the LNSD concept so that it will be an integral part of the international SKA project. End-to-end design concept Costing consistent with anticipated budget ceiling Timeline and milestones consistent with the overall project timeline set by the International SKA Project Significant Education and Public Outreach Component 11/13/2018 SKA2004 Penticton

The US SKA Consortium’s Technology Development Project Technical aspects of the TDP: Optimize antenna/receiver design Develop manufacturing process for low-cost antennas Define and develop plausible plan for wideband signal transport and digital processing RFI mitigation and management Post processing for large FOV surveys (innovations in high performance computing, networking; IVO) Operations and maintenance plan Costs and trades 11/13/2018 SKA2004 Penticton

5-year Technology Development Project 7 main work areas (“Subprojects”) Antennas and receivers Signal transport and digital processing Systems analysis and design Construction and Operations costing The ATA as a development facility for SKA feeds, receivers, RFI, large-N ops Siting the SKA in the US Education and Public Outreach 11/13/2018 SKA2004 Penticton

Proposed Subproject Funding EPO Siting ATA Antennas & Rx Ops System Analysis & Design Data Trans 11/13/2018 SKA2004 Penticton

p. 33 of TDP proposal 11/13/2018 SKA2004 Penticton

The International SKA Project Office (ISPO) Strong relationship with and reliance on the ISPO Developing the science case Identifying and leveraging synergies between national efforts Converging on a design and site for the SKA Developing an international demonstrator Identifying funding Funds requested in the TDP proposal for the US contribution to the ISPO: Project Director (Schilizzi) Project Engineer (Hall) Project Scientist (≥ 2006) Travel expenses, RFI characterization, website, etc. 11/13/2018 SKA2004 Penticton

11/13/2018 SKA2004 Penticton

SKA Demonstrators Related to the US Plan The Allen Telescope Array Science and technology, calibration, costing The DSN Array Technology (antenna development) EVLA Networking, operations, science LOFAR Science, calibration 6m reflectors ATA antenna copy as feed/receiver test platform Cut and paste tests “12m” reflectors Symmetric designs Off-axis designs 12m + 4m skirt 11/13/2018 SKA2004 Penticton

11/13/2018 SKA2004 Penticton