Transmission Workstream, 6 August

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Enduring Offtake Arrangements including an Off-Peak Interruptible Service Peter Bolitho.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Enduring NTS Offtake Arrangements Transmission Workstream 5th September 2006.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Interactions with the implementation of RIIO-T1
Transitional Exit Capacity Proposals -Update
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Exit Capacity Release Methodology Statement
Entry Capacity Overrun price calculation
Transmission Workstream, 01 October 2009
Exit Capacity User Commitment – Transmission Workstream update
Transmission Workstream 4th July 2007
UNC Modification Proposal 0373
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
Capacity Methodology Statements
Mod 0452 (PARCA) – Further thoughts
Exit Capacity Substitution and Revision
Exit Capacity – Managing Incremental Signals
7th July 2011 Transmission Workgroup - Elexon
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Enduring Offtake Arrangements (Including an alternative daily interruptible capacity release mechanism to facilitate use of spare capacity) Peter Bolitho.
Update on Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Enduring NTS Exit Capacity Arrangements - Update
MOD National Grid NTS Initiated Flow Swaps
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
QSEC auction timetable
Long Term Non Firm Capacity Update
MOD Deemed applications – User pays initial thoughts.
Proposals to be Reviewed
Transmission Workstream – Partial Assignment
Review Group /09/2007.
UNC Transmission Workstream 7th December 2006
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Richard Fairholme Transmission Workstream 4th September 2008
Flat, flex, assured pressures Network Development Statement
Information Provision for Transitional Exit Capacity
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Stefan Leedham Transmission Workstream 2nd November 2006
Exit Overruns in the Enduring Regime
Transmission Workstream 4th December 2008
Transmission Workstream 05 November 2009
Presentation transcript:

Transmission Workstream, 6 August Exit Update - Annual Application Window - Systems Update - Current Licence Consultation Transmission Workstream, 6 August

Annual Application Window: Update & Next Steps Reduction window and application window now closed DCs: 23 increase applications and 12 reduction applications DNs: 40 increase applications and 11 reduction applications We will now analyse all of these applications along with initialised levels for purposes of network planning Allocations will be made in line with the ExCR by 30 September After DN adjustments to applications accepted beginning September where flex or pressure requests have been rejected Contact made with some applicants re exceeding MSPOR limit – advise that contact is made with site operator in first instance and customer services for further questions Ad hoc applications will be accepted from 1 October We believe that the process went well, but would welcome any feedback.

Systems Update Extensive piece of work to get all exit functionality into Gemini Likely to be delivered in three phases Requirement gathering / analysis on phase 1 complete, that stage now started for phase 2 NB Some elements subject to further internal discussion Release 1 2010 (starting January 2009) Release 2 2011 (starting August 2009) Release 3 2012 (starting TBC) Data Migration Set up of Processes Enduring Annual NTS Flat Exit Applications Annual NTS Flat Exit Applications ARCA Logging and Tracking Reporting Trading & Assignments Forwards & Options Full ARCA Solution Credit Monitoring & Terminations Daily Auctions Constraint Management Actions Invoicing & Overruns Decommissioning of current Exit Capacity Processes

Current Licence Consultation: Licence / UNC definitions National Grid has become aware of a number of sites that are classified as single Supply Points under the UNC, but have more than one baseline in the Licence Supply Meter Point = physical location where gas is made available for offtake i.e. the end of the NTS Supply Point = notional commercial point used for system balancing, deemed gas flow and transitional regime capacity booking One or more Supply Meter Points can be comprised in a single Supply Point where gas offtaken from the NTS is supplied to premises: Owned or occupied by one person In close geographical proximity to each other Comprised within a common curtilage, and Which serve each other in some necessary or reasonably useful way

Licence Consultation: Issue In the enduring exit regime capacity is made available at those NTS Exit Points that are listed with a baseline in the licence Staythorpe, Stallingborough and Didcot all satisfy the single premises requirement but each has two baselines in the licence This could cause inefficient booking of capacity and unnecessary signalling of incremental where a site has more than point at which it offtakes gas directly from the NTS If gas can go down either stream then would need to book sufficient at both to avoid exposure to overruns, effectively double counting If baselines are aggregated, one capacity booking covers both gas streams allowing site flexibility and avoiding exposure to overruns and inefficient investment signals

Licence Consultation: Proposals Therefore propose that, if a site requests it, and Single Premises Requirement is met, then baselines will be aggregated i.e. Current Name Current Baseline Merged Name Merged Baseline Didcot A 87.29 Didcot 137.76 Didcot B 50.47 Stallingborough 38.34 Stallingborough 66.5 (phase 1) Stallingborough 28.16 (phase 2) Staythorpe PH1 38.12 Staythorpe 76.24 Staythopre PH2 38.12

Impacts and Next Steps Responses requested by 13 August 2009 A formal consultation is then expected to be issued mid August, which would allow for any changes to be directed to the licence in September National Grid will then be able to allocate any applications received in the July Annual Application Window against the merged baselines The prevailing Maximum Supply Point Offtake Rate or Maximum CSEP Offtake Rate in the relevant NExA(s) will continue to apply Where users have been initialised at both sites that are being merged, the initialisation numbers will be added together