VIG TG Update NFRC Fall Membership Conference

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

BOT Retreat: Strategic Priorities for 2007 ACC Board of Trustees August 2006.
FAA Managers Association (FAAMA) New Leader Training – FAAMA V Chapter Leadership In accordance with FAAMA National and Chapter By-Laws: Chapter by-Laws.
The Pathway to Success Strengthen Engagement of Alumni in the Life of the University Goal 5 – Initiative 2.
Governance Hot Topics National Office Dialogue 1.
Project Charter – Softball NSW Team Cathy Kerr – General Manager Andrew Dodshon – President Andrew Hamilton – Consultant Steering Committee Frances Crampton.
Bylaws, Rules, and Periodic Review – Updates from Standards and Practices Julie Adams, ASCCC Executive Director Craig Rutan, ASCCC South Representative.
RESEARCH WORK AT THE UNIVERSITY OF MASSACHUSETTS Center for Energy Efficiency and Renewable Energy Building Energy Efficiency Program University of Massachusetts.
Consultation Responses A Volunteer Guide For further information please contact:
Travel Website Enhancement Project Project Update First Name Last Name.
The State of IEEE John Vig 2009 IEEE President and CEO IEEE Region 8 Meeting Venice, Italy April 2009.
THE QUE GROUP WOULD LIKE TO THANK THE 2013 SPONSORS.
ASTM G197 Task Group Chair: Joe Hayden/Pella Corporation Status Update September 22, 2014.
Protocol Lifecycles.  At their meeting in May, the GSA Board approved a new policy that establishes a well-defined three-year lifecycle for GSA protocols.
L.E.A.P.S EL PASO TEXAS JUNE 06, LAW ENFORCEMENT REPORT All Command Centers are reporting an increase in: Auto Theft, Burglary of Vehicles plus.
ENACTUS TRAINING Using the Team Member Package Developed by D Caspersz & D Bejr, 2013.
Overview of the Program Prioritization Process Task Force Representatives K-State Research and Extension Annual Conference October 18, 2012.
MCHP plans: October 2013 – February 2014 Coordination Board meeting Kyiv,
- 1 - TTA View of Budget & Secretariat Functions March 28~29, 2012 (Tokyo, Japan) TTA.
How to Log your Non-Profit Board Participation. Logging Board Participation Hours There area two steps to recording your Board Participation hours. 1.Add.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO WMO World Meteorological Organization Working.
Updates to Rules of Procedure RoP GEO-XII Plenary.
1 CS 3870/CS 5870: Note 14. Prog5 Due 10 PM Wednesday, Oct 21 Authentication and Authorization 2.
State Center Community College District Willow International Center Center-to-College Status Naming Process & Timeline.
A subsidiary of Downloaded from A Public Private Partnership to fight HIV/AIDS in Gombe state Engr.Haladu.
Volunteering and You: Getting Involved in ACUI Joe Gutowski Case Western Reserve University ACUI Volunteer Development Coordinator.
Strategic Financial Task Force Info 1 Work in support of existing programs and services Work specific to the Strategic Plan Work that would support emerging.
BSA 502 Week 6 Final Team Assignment Business Systems Paper and Presentation (Riordan Manufacturing) Learning Team Riordan Manufacturing Paper Finalize.
Preparation of the Self-Study and Documentation
Getting More Involved with NFRC
ILC final report Jacob C. Jonsson
DROPS Focus Groups Human Factors
Products & Services Committee
SPECIAL COMMITTEE RECOMMENDATIONS STATUS CTS Fall Planning Meeting San Marcos September 6, 2013 Don Drumtra Good morning.
SASA Website Redesign.
CHAPTER BOARD 101: Leadership & Succession Training 10:10-11:00am
NACE Committee Workspace (NCW)Training Workspace Features Navigation
Submission Title: St. Louis e/ Liaison Report.
Submission Title: [TG3 Closing Report Jul00]
Proposal for P&P Change - #2009-1
MI-Access Update SLIP January 29, 2010.
WAGGGS Organisational Chart
CMAST Update March 25, 2014.
Parents’ Committee A vital part of the 4-H club leadership team
Senate Meeting Summary
Clinic Timeline Startups
September 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG5 Closing Report] Date Submitted:
New Commissioners’ Meeting IFTA Amendments
IEEE Working Group on Mobile Broadband Wireless Access
March 2018 Opening Report Date: Authors: March 2018
API 17H TASK GROUP January 15, 2013.
Area Director Training
WG Technical Editor’s Report
EVERYTHING YOU NEED TO KNOW ABOUT THE NAWIC MANUAL
DB2000 Merit Marks 10/20/2018 D26 Fall Conference.
Strategic Planning Year Two
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Users Guide & Matrix Update Committee
IEEE MEDIA INDEPENDENT HANDOVER DCN:
PPT and video are due no later than March 29, 2019
Work Breakdown Structure Tasks and Sub-Tasks
Submission Title: [WG-TG3 Opening Report Nov02]
TGg Report to the IEEE Working Group
November 2018 Opening Report
ILC 2015 update – Spring 2016 Jacob C. Jonsson
Taboo Plenary - Rules You will be split into two teams
EUPAN Handbook.
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Robert Moskowitz, Verizon
API 17H TASK GROUP June 26, 2013.
Presentation transcript:

VIG TG Update NFRC Fall Membership Conference D. Cooper Oct. 2016

Two Main Objectives Add VIG specific content to the NFRC documents where required Test VIG in window frames – how do the results compare with the LBNL simulations.

1. Updates to NFRC Documents Task group split into sub teams to review the NFRC documents to determine where content was needed. All recommendations reviewed by the task group members. Recommended changes to be presented to the specific committees responsible for content, ballot the changes and update the documents: Simulation Manual / NFRC 100 – 200 – 700 - 705

2. VIG Testing RFQ budget submitted to the board. Team determined the most optimized test program: Simulate VIG constructions in Window/Therm v7 programs: 2 frame materials (aluminum / PVC) 2 frame (2 manufacturers) 8 simulations. Action: Volunteers to write up RFQ. Lab Physical Testing VIG center of glass using GHP method. VIG window constructions from above – thermal hot box testing.