Summary week 36 Coordination by B. Holzer & J. Wenninger

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Week 32 Started with luminosity production…
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Machine availability reaching well over 80%
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Coordination by E. B. Holzer & J. Wenninger Production
Mike Lamont, Jorg Wenninger
Week 36 plan Todo’s: And also: 12+b injection.
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Week 35 – Technical Stop and Restart
Summary week 29 VdM scans Luminosity production
Monday Morning – recovery from cryo.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Summary week 18 Intensity ramp up & production
Programme for Friday 9 July
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Monday :15 fill 3523 dumped by BPMs IP6
Plan for 1 m b* J. Uythoven & J. Wenninger
LHC Morning Meeting - G. Arduini
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
LHC Status Fro Morning 9-Sep
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday – Morning and Evening
Another Immortal Fill….
Wednesday morning / afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Summary week 36 Coordination by B. Holzer & J. Wenninger Commissioning of beta* 1m, ALICE polarity and intensity ramp up

Week 35 and 36 – commissioning plan Configuration: b* =1m, 120 mrad Xing angles. IR3+6+7 collimators at standard settings, TCTs 11.8s (IR1+5+8) As decided at LMC: instead of tight collimators and reduced Xing, use recently ‘discovered’ aperture in triplets. Block A: Aperture at 1m and 120 mrad Block B: ALICE polarity reversal Block C: Validation = loss maps Block D: Intensity ramp up End of Week 35 Week 36 11/13/2018 LHC 8:30 meeting

Overview end week 35 & week 36 Power cut LR BB test Ramp up TCTs, loss maps Setup, aperture ALICE Loss maps Loss maps 1380 bunches Sat Sun Mon Tue Wed Thu Fri Sat Sun 11/13/2018 LHC 8:30 meeting

ALICE polarity reversal Main (side) effects of the ALICE polarity reversal: Change in coupling ~ 0.002-0.003. Horizontal orbit change due to coupling of the large vertical spectrometer + Xing bumps into the horizontal plane. Re-alignment of TCTs in IR2 and of injection protection around the inverted external Xing angle. => Easy to correct Orbit change at 450 GeV due to ALICE pol reversal (excluding expected external Xing angle) 11/13/2018 LHC 8:30 meeting

Triplet aperture measurements – week 35 Aperture confirmed at 1 m: there is enough aperture for *=1m & 120 µrad Xing angles, with around 2 sigma additional margin. Consistent with measurements at 1.5 m beta*. For the squeezed/separated case: Aperture >16 sigmas in the separation plane (IP1 H & IP5 V) For the crossing plane in collision conditions (with lumi scan corrections): Aperture at 14.8 -> 15.3 sigmas (IP1 V) Aperture at 15.3 -> 15.8 sigmas (IP5 H) Probe intensity loss maps with the TCTs opened to 14 sigma (= nominal + 2.2 sigma) did not show any losses at the triplets. 05/09/2011 LHC 8:30 meeting

Triplet aperture check Loss maps with the TCTs opened to 14 sigma (= nominal + 2.2 sigma) were repeated with separated beams at the end of the squeeze (=tightest case) with one nominal bunch per beam. No/very low losses at the triplets – confirm aperture margins. B1 H 11/13/2018 LHC 8:30 meeting

Long range beam-beam separation Beam-beam separation below 6s for 100 mrad With 120 mrad ~ equivalent to nominal (b* 0.55 m) 1.5m, 120 urad 1m, 140 urad 1m, 120 urad 1m, 100 urad Triplet Triplet W. Herr 11/13/2018 LMC - beta* 1 m

Gave problems with tight collimators and 100 urad Xing angle! Long range beam-beam The long range beam-beam test with 84b was finally performed Tuesday evening. Totally smooth.. Luminosity consisted with beta* of 1 m. No change of damper gains, octupoles etc wrt 1.5 m. 125 hours Collide Gave problems with tight collimators and 100 urad Xing angle! 11/13/2018 LHC 8:30 meeting

Hackers intermezzo – Stefan is watching you ! Access to eLogbook from outside CERN blocked by IT security Tuesday evening ! (for ~ 24 hours) and we got some expected privacy… 11/13/2018 LHC 8:30 meeting

RP settings Agreed settings (LPC + rMPP): TOTEM: 14 sigma in V, 18 sigma in H. ALFA: 7 mm from beam-based alignment center (18-21 sigma). Station Top Bottom XRPV.A6R5.B1 6.8748 -7.0238 XRPV.B6R5.B1 6.4815 -7.0125 XRPV.A6L5.B2 5.9510 -6.9910 XRPV.B6L5.B2 5.7283 -6.5513 Station Outer XRPH.A6R5.B1 2.3658 XRPH.B6R5.B1 2.7017 XRPH.A6L5.B2 2.7314 XRPH.B6L5.B2 3.4494 Station Top Bottom XRPV.A7R1.B1 7.199 -6.801 XRPV.B7R1.B1 7.175 -6.825 XRPV.A7L1.B2 6.901 -7.099 XRPV.B7L1.B2 6.953 -7.047 11/13/2018 LHC 8:30 meeting

Wednesday morning – setup completed ! Validation campaign finished Wednesday morning. ALFA-ATLAS data taking exercise before last dp/p + loss map. Small leakage ~1e-5 seen at RPs. Condition Betatron H Betatron V Dp/p + Dp/p - Dump Injection OK Flat top --- Squeezed Collisions OK* * : with ALFA and TOTEM RPs. 11/13/2018 LMC - beta* 1 m

Rocket ramp up Perfect ramp up over 4 fills to 1380b. 264b, 480b, 912b, 1380b. Luminosity consistent with 1 m beta* and emittances slightly above 2 um ! 1380 912 480 264 11/13/2018 LHC 8:30 meeting

Stable beams L > 3x1033 cm-2s-1 in ADJUST 3x1033 Power cut QPS? Bunch intensity ~1.3E11 QPS EL QPS RF 3x1033 OP Power cut OP OP Wed Thu Fri Sat Sun 11/13/2018 LHC 8:30 meeting

Stable beams fill list Integrated luminosity 170 pb-1 in 4x24 hours Fill (nb) L (1033 cm-2s-1) Length (h) Int. L (pb-1) Dump cause 2083 (264) 0.57 6 10 OP dump 2085 (480) 0.94 15 2086 (912) 1.97 10.2 50 2090 2.75 1 QPS Q8.L5. SEU candidate 2091 2.65 2.5 20 RF trip B1 (80 MHz cable) 2092 2.98 52 El. circuit breaker on QPS RQF.12 2093 2.95 0.7 7 Spurious quench loop opening on RB.81 2094 2.99 0.6 QPS RQX.R1 Red = intensity/luminosity related Integrated luminosity 170 pb-1 in 4x24 hours 11/13/2018 LHC 8:30 meeting

> 3 fb-1 end of week 37 ! 11/13/2018 LHC 8:30 meeting

Injection of beam1 Injection protection had to be setup around new external Xing angle of ALICE (now -170 urad at 450 GeV). Since we inverted the ALICE polarity we have observed increased losses at and behind the TCLIA.R2. Dump trigger from losses collected by the beam 2 TCTH. ALICE TDI TCLIA TCTH.B2 Q4 triplet triplet D1 D2 11/13/2018 LHC 8:30 meeting

TCLIA issue Scan of the gap – losses go down when opened. Most sensitive to the lower jaw. Lower jaw Upper jaw 11/13/2018 LHC 8:30 meeting

TCLIA issue Scanned the aperture around TCLIA. No apparent obstacle found in front of TCLIA. Opened lower jaw by 1 sigma, then scan of number of bunches. Losses constant above 36b. Similar losses were found during August, but they were just a factor 2 or so lower. 11/13/2018 LHC 8:30 meeting

Injection status TCLIA.R2 lower jaw opened temporarily by 1 sigma. Where do the particles come from? Nice case for the diamond detectors ! Injection quality fluctuating – no a major issue, but annoying. SPS scraping was limited to 3% to limit radiation in LSS1. Not sufficient according to Verena. Alignment issue: in some planes it is no longer possible to zero the injection oscillations and to pass in the center of the TCDIs at the same time – tricky case. With us since a while… Ideally one should re-align the TCDIs to restore a clean situation… 11/13/2018 LHC 8:30 meeting

Collimator beta* interlock limits Attempt to adjust/tighten the beta* limits for TCTs in IR1/5 failed (dump at 1 m) due to the granularity of the beta* info in the timing (0.1 m). Improved (and working) version tested last night. Beta* limits deactivated for the moment, normal position interlocks active of course ! 10  1.5 m Gap Limit Limit 1.5  1 m 11/13/2018 LHC 8:30 meeting

ALICE vacuum Since we have ramped up the number of bunches to 1380, the vacuum in LSS2 has degraded a lot. ALICE cannot switch on in stable beams. No (significant) cleaning observed.. 1E-7 TDI parking to ± 40 mm 1380 264 480 912 1E-8 11/13/2018 LHC 8:30 meeting

ALICE vacuum The highest pressure are observed near the ZDC / special 80cm  vacuum chamber (no solenoids, no NEG). According to vacuum colleagues this could be electron cloud – following the reversal of polarity. Steady pressure rise at injection. 11/13/2018 LHC 8:30 meeting

Losses fill 2092 – 1380b Vacuum 11/13/2018 LHC 8:30 meeting

Steady losses 2092 – normalized to threshold IR1 & 5 triplets at 30-40% of threshold (luminosity) RS12 = 84 s 11/13/2018 LHC 8:30 meeting

More vacuum – IR8 Since Saturday afternoon, vacuum spikes at Pt8 (in particular R8) have re-appeared. 2 beam dumps on flat top in night Saturday-Sunday on TCTVB.4R8 Started/degraded after change of TDI parking – coincidence? TDI parking to ± 40 mm Fri Sat Sun 11/13/2018 LHC 8:30 meeting

Vacuum IR8 BS regulation apparently OK – worth checking today ! Vacuum activity already present during injection. 11/13/2018 LHC 8:30 meeting

No and more issues… The first machine access after the TS was last Friday ! ‘No HW issue period’ extended well into week 36. What a pleasure – probably helped by the low intensity ! Two ‘spurious’ events on RB.81 (stable beams) and RB.12 (injection). Quench loop opened, but source not identified. MP3 still investigating. Tune signals not always at their best – in particular with low number of bunches. Lead to a few RQTD/F trips (& dumps). Switch QFB off when signals to poor. Seems OK with 900+ bunches. Worth checking (and correcting the tunes) before/after collision. 11/13/2018 LHC 8:30 meeting

The great final Sunday 10:40 – power cut – affected mostly Meyrin and P18. Cryo S12 off. LHC RF off. LHC collimator motors ok. Meyrin site machines hit severely (PS, PSB, LINAC off). SPS basically OK. Cryo recovered this morning at 04:00. Pre-cycled. Injection… 11/13/2018 LHC 8:30 meeting

The grand summary Beta* 1 m works very well and was ready faster than we dared to hope ! Luminosity increase already in the pocket ! Of course higher lumi means more frequent SEUs… Thank you to the reduced teams that made it work while most of CERN was at IPAC ! Outstanding issues are related to the vacuum situations in IR2 and IR8. Probably different causes. TDI parking back to ±20 mm for the moment. Injection (boundary) conditions to be checked. TCLIA.R2, steering, scraping. 11/13/2018 LHC 8:30 meeting

Todo’s BLM SW update (C. Zamantzas, S. Jackson). Damper dynamic range adjustment (partial saturation on some bunches for average of 1.3E11). CMS observing its vacuum conditions on R5 side. Agreed procedure with vac colleagues if pressure rises again. 11/13/2018 LHC 8:30 meeting

Staring the week 37 coordinators: Silence – on tourne ! France 2 will film in the CCC today 13:30 – 17:00. They will block parking space. Expect perturbations ! Staring the week 37 coordinators: G. Arduini R. Assmann 11/13/2018 LHC 8:30 meeting