Mathews Bridge
Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced 2007, $12.9 Million Paint & Structural Repair 2011, $22.7 Million
LOGISTICS Vertical Clearance: Vertical, Water to Low Member =150 Vertical, Deck to Low Member = 21 Deck to Top of High Point on Truss = 100 Main Channel Width = 700 Water Depths = 16 to 38 Tides = 2
Bridge Connections: Bolts and Rivets
.
..6
Eastbound Traffic: Union Street to the Hart Bridge, Atlantic Blvd to University/Cesery Blvd to Arlington Expressway Westbound Traffic: Arlington Expressway to Cesery Blvd/University Blvd to the Hart Bridge to State Street to downtown Jacksonville Detour Routes
DETOUR ROUTES
FDOT Public Information Officer Mike Goldman (904)