Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced.

Slides:



Advertisements
Similar presentations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Advertisements

Calculating Temperature Change in a Rising Air Mass.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel.
Dennis L. Edwards Tunnel
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Who Wants To Be A Millionaire? Year 3 What does it weigh?
Welcome to Who Wants to be a Millionaire
ZMQS ZMQS
Why Is Special Inspection Good For Us?
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
16/05/ prepared by Joan Steele-Mills, Physiotherapist, Classification Officer CPISRA.
TRAIL BRIDGE INSPECTION 101
IIT Madras, SERC Madras, Anna Univ., INSDAG
ABC Technology Project
1 Designated Historic Landmark Opened to Traffic in 1883 Construction is Scheduled Overnight Construction Limited Weekend Construction.
LESNER BRIDGE REPLACEMENT PROJECT
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
2 |SharePoint Saturday New York City
VOORBLAD.
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Squares and Square Root WALK. Solve each problem REVIEW:
San Antonio, Bexar County, Texas Hays Street Bridge.
Missouri River Bridge at Washington, Missouri Prepared by: Washington Bridge Committee December 2009.
+21 Economic Expectations Europe December 2013 Indicator > +20 Indicator 0 to +20 Indicator 0 to -20 Indicator < -20 European Union total: +14 Indicator.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
Equations of Circles. Equation of a Circle The center of a circle is given by (h, k) The radius of a circle is given by r The equation of a circle in.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Figure Essential Cell Biology (© Garland Science 2010)
A SMALL TRUTH TO MAKE LIFE 100%
A small truth to make life 100%
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
EXAMPLE 3 Use synthetic division
Fact Families By: Gianna Boland.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
 Dennis H. Mahan Memorial Bridge  Project ID: 00055A-  Iteration #32 (Thu, 7 Feb 2013, 10:42:45)  Type of CostItemCost CalculationCost  Material.
1905 NW Thurman St Bridge. Project Location Thurman St Bridge.
Approaches to Historic Bridge Rehabilitation Case Study #2
MILLRACE WE ALL KNOW THE HISTORY.
Presentation transcript:

Mathews Bridge

Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced 2007, $12.9 Million Paint & Structural Repair 2011, $22.7 Million

LOGISTICS Vertical Clearance: Vertical, Water to Low Member =150 Vertical, Deck to Low Member = 21 Deck to Top of High Point on Truss = 100 Main Channel Width = 700 Water Depths = 16 to 38 Tides = 2

Bridge Connections: Bolts and Rivets

.

..6

Eastbound Traffic: Union Street to the Hart Bridge, Atlantic Blvd to University/Cesery Blvd to Arlington Expressway Westbound Traffic: Arlington Expressway to Cesery Blvd/University Blvd to the Hart Bridge to State Street to downtown Jacksonville Detour Routes

DETOUR ROUTES

FDOT Public Information Officer Mike Goldman (904)