Event Chain Methodology

Slides:



Advertisements
Similar presentations
RiskyProject Project Risk Management Software
Advertisements

Work Breakdown Structures
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
Seven Quality Tools The Seven Tools
Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5 Quantitative Risk Analysis for Aerospace Industry.
Full Monte Cost and Schedule Risk Analysis
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
Project Risk Management
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada
Microsoft Project Presentation By Corey Johnson 10/11/00.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Monte Carlo Schedule Analysis The Concept, Benefits and Limitations Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403)
HIT241 - TIME MANAGEMENT Introduction
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Decision-Making In Project Management Decision Framing Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403) Fax:
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
HIT241 - RISK MANAGEMENT Introduction
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Quick Recap.
Risk Event Modeling Risk event modeling in part of Intaver Institute’s presentations on project risk management and risk analysis Intaver Institute Inc.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
Question Four: Project Risk Management PMBOK definition of Project Risk Project risk management is the art and science of identifying, analyzing, and responding.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
Quantitative Project Risk Analysis 1 Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5
Intaver Institute Inc. Project and Portfolio Risk Management with RiskyProject Enterprise Project and Portfolio Risk Management with RiskyProject Enterprise.
Project Risk Management Planning Stage
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
1. WHAT IS A PROJECT? “A project is a problem scheduled for solution.” This definition forces us to recognize that projects are aimed at solving problems.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
Week 6 – Project Time Management
Chapter 16 – Project Management
Project Management Business Management.
deterministic Fixed and known in advance, representing a
forward scheduling or backward scheduling
Chapter 11: Project Risk Management
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Client Management Managing Client Expectations
Chapter 6: Project Time Management
ENGINEERING MANAGEMENT (GE 404)
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Project Management for Software Engineers (Summer 2017)
RiskyProject Enterprise Project Portfolio Risk Management Software
Monte Carlo Schedule Analysis
Quantitative Risk Analysis for Aerospace Industry
Quantitative Project Risk Analysis
In this tutorial you will:
Risk Event Modeling Intaver Institute Inc.
Tools for Visualization
Critical Path Method Farrokh Alemi, Ph.D.
Risk Adjusted Project Schedules
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Teaching slides Chapter 13
Chapter#8:Project Risk Management Planning
AOA A style of project network diagram in which arrows
Setting up a project file
Importance of Project Schedules
Chapter#8:Project Risk Management Planning
CHAPTER 6 PROJECT TIME MANAGEMENT
Time Scheduling and Project management
Agile Project Management and Quantitative Risk Analysis
Presentation transcript:

Event Chain Methodology Schedule risk analysis technique that focuses on managing risk events affecting project schedules and relationship between them In this video we will learn about the basic principles of Event Chain Methodology. Event Chain Methodology is a schedule risk analysis technique. It focuses on managing risk events affecting project schedules and the relationship between them. Here is how it works.

Original Project Schedule Risk Adjusted Project Schedule You created a very nice project schedule and start managing the project. However, in reality, the actual project schedule very often can be significantly different regardless of how well you prepared your original schedule. Many tasks can take longer or have a higher cost, some new tasks may be required, new resources can be introduced or something else can happen. All these changes are due to risk events, which you did not envision in your original schedule. Can we do something better? Can we prepare to ameliorate the original schedule? Project slips due to the risks and uncertainties

???? Statistical Distribution of Task Durations One solution is schedule risk analysis. Schedule risk analysis usually involves assigning uncertainties to the original project schedule then executing Monte Carlo simulation. The result is the chance that your project will be completed on time and on budget. Uncertainties are modeled by statistical distributions. In most cases they are a defined three-point estimate of task’s duration and cost. For example: a task can take between 2 to 5 days and most likely 3 days. If you know the estimates for some or all tasks in the project, you can run Monte Carlo simulation and get the statistical distribution for the project duration or cost. This approach works well if you have precedence on how long it took to run such tasks before. If not, it will be what is called “garbage in – garage out”. When conjecture comes into the equation the estimates will be imprecise.

Risks Affecting Project Schedule Probability Impact Score Person left a project team Some materials did not arrive on time Bad weather ….. ….. ….. ….. Can we improve accuracy of the analysis? Yes we can. To do it we need to ask ourselves what is behind task uncertainties. In most cases these are risk events: something happened and made an impact on the project: persons left a project team, some materials did not arrive on time or the weather has changed. These events or risk drivers are easier to identify by asking the question: “what may happen?”

Risks Evens are Related to Each Other Event 1 Event 2 Event 3 However these events don’t occur by themselves. Most events are related to each other and form event chains. By analyzing these events it is possible to significantly improve the accuracy of project scheduling.

Principle 1: Single Events Statistical distribution for moment of event Event 1 Event 2 Ground State Excited State 1 Excited State 2 Excitation Event Chain Methodology is based on six major principles. The first principle deals with a single event. According to Event Chain Methodology, events occur sometime during the middle of the activity and this changes the status of the activity.   The original state is called a ground state; other states are called excited states. For example, if the team completes their job, they can move on to another activity. State notion is important because certain events can or cannot occur when the activity is in a certain state. It means that the state of an activity is subscribed to the event. Actual moment of an event is probabilistic. Most events can occur with a certain probability any time during the course of that activity. It is important to know the moment of a schedule risk event, potentially causing a restart of the activity or launching another activity. Events can be local, affecting a particular task or global affecting all tasks.

Principle 2: Event Chains The second principle of Event Chain Methodology deals with event chains. Events cause other events that create event chains. This knock-on effect has various dynamic relationships between events.   One event can trigger one or multiple events. Events can be correlated with each other without one triggering another one. In this case if one risk has occurred, another one will occur and vice versa. One event assigned in one activity can execute another activity or group of activities. In many cases it triggers a risk response plan. For example, the event is: “a structural defect is discovered”. This can cause one or more activities such as: “Repair”. Events can cause other events to occur either immediately or with a delay. The delay is a property of the event subscription. The delay can be deterministic, but in most cases, it is probabilistic. Also, risks can be transferred from one activity to another.

Risk Response Plan “Repair” Event Structural defect is discovered Risk Response Plan “Repair” Risk Response Is completed Event: Execute Response Plan Event Chain: Event 1 triggered a response event after some time Entry point Exit Point Execution of Response Plan One event assigned in one activity can execute another activity or group of activities. In many cases it triggers a risk response plan. For example, the event is: “a structural defect is discovered”. This can cause one or more activities such as: “Repair”. Events can cause other events to occur either immediately or with a delay. The delay is a property of the event subscription. The delay can be deterministic, but in most cases, it is probabilistic.

Risk Transfer Event 1 Event 1 Transferred   Also, risks can be transferred from one activity to another.

Principle 3: Event Chain Diagrams Closed or transferred risk Closed issue Issue Threat Opportunity State: New Requirements The third principle defines rules for visualization of the events or event chains using event chain diagrams. Here are a few important rules:   Event chain diagrams present events as arrows on the Gantt charts. Arrow pointing down is a threat. Arrow pointing up is an opportunity. Issues are shown as an arrow in the circle. Closed or transferred risks are shown using dashed lines. The color of the arrow is white. A closed issue is shown in the circle with dashed borderlines. Excited states are represented by elevating the associated section of the bar on the Gantt chart.

Risk Probability and Impacts Low impact High probability and impact Colors represent the calculated impact of the risk. A higher impact is red or. A low impact is green. The size of the arrow represents probability.

Event Chains on Event Chain Diagrams 0.5 Event 4 Event chains are shown as lines connecting arrows depicting events.   Event chains may trigger another activity. In this case, the event chain line will be connected at the beginning of the activity with an optional arrow.

Event Chain Executes an Activity Event triggers activity Event chains may trigger another activity. In this case, the event chain line will be connected at the beginning of the activity with an optional arrow.  

Event Chain Executes a Group Activities Event triggers group of activities Event chains may trigger a group of activities. In this case, this group of activities will be surrounded by the box or frame and the event chain line will be connected to the corner of the box or first activity within a frame.

Task: Software Development State Table Task: Software Development Event 2: Problem with development tool Event 1: Architectural changes Event 3: Minor requirement change Probability: 20% Moment of event: any time Excited state: refactoring Impact: delay 2 weeks Probability: 10% Moment of event: any time Excited state: refactoring Impact: delay 1 week Ground State Probability: 10% Moment of event: start of the state Excited state: minor code change Impact: delay 2 days Excited state: refactoring Excited state: minor code change Another tool that can be used to simplify the definition of events is a state table. Columns in the state table represent events; rows represent the states of an activity. Information for each event in each state includes four properties of the event subscription: probability, moment of event, excited state, and impact of the event.

Principle 4: Monte Carlo Simulations The fourth principle deals with specific aspects of Monte Carlo simulation as part of Event Chain Methodology. From the scheduler’s point of view, Monte Carlo simulations for Event Chain Methodology is comparable with traditional Monte Carlo schedule risk analysis, however, the actual implementation of the Monte Carlo method on the software is different. The results of Monte Carlo simulation include statistical distribution of project duration and cost.   In Event Chain Methodology risk can be not only schedule-related or affecting duration and cost, but also non-schedule affecting safety, security, performance, technology, quality, and other project objectives. In other words one event can belong to different categories. The result of this analysis would project risk exposure for different categories as well as integrated project risk scores for all categories. This integrated project risk score is calculated based on relative weights for each risk category.

Schedule and Non-Schedule Risk Categories Event 1 Impact: Schedule – 20% Cost – 30% Performance – 50% Quality – 45% Litigation – 25% Safety – 40% Security – 30 Integrated Impact – 50% Schedule related categories Non-schedule categories In Event Chain Methodology risk can be not only schedule-related or affecting duration and cost, but also non-schedule affecting safety, security, performance, technology, quality, and other project objectives. In other words one event can belong to different categories. The result of this analysis would project risk exposure for different categories as well as integrated project risk scores for all categories. This integrated project risk score is calculated based on relative weights for each risk category.

Principle 5: Critical Event Chains The fifth principle deals with the analysis of the schedule with event chains. Events and event chains can be ranked based on the results of risk analysis. Critical threats with higher severity should be mitigated first. Event ranking is done by calculating the correlation between project results and instances of the events.   Event and event chain ranking is performed for all risk categories (schedule-related and non-schedule) as part of one process. Integrated risk probability, impact and score can be calculated using weights for each risk category.

Principle 6: Project control with events Low estimate of project duration High estimate of project duration 100% % Complete Finally, the sixth principle deals with project control, with events and event chains. If the project is partially completed, the original set of risk events and their properties will change, mitigation and response plans will be executed. In most cases probability and impact of risks will be reduced as the project progresses. It would mean that the project uncertainties would reduce as well. Event Chain Methodology calculates reduced risk probability and impact automatically based on the percentage of work completed. Project Duration

Chance of project meeting a deadline (Project Success Rate) Project Duration, Weeks 100% 80% 60% 40% 20% 0% 2 4 6 8 10 12 Risk response increases a chance of the project meeting the deadline Chance of meeting the deadline is reduced as a result of events Risks Risk response plan We can monitor and illustrate your project’s probability of meeting a specific deadline. This variable is constantly updated as a result of Monte Carlo analysis.

Project Risk Analysis Made Ridiculously Simple A Step by Step Guide to Project Risk Analysis by Lev Virine and Michael Trumper Hardcover: 284 pages Publisher: World Scientific Publishing Co (March 5, 2017) Language: English ISBN-10: 9814759376 ISBN-13: 978-9814759373 Web site: www.projectdecisions.org If you need more information about Event Chain Methodology please read our book “Project Risk Analysis Made Ridiculously Simple”