E-Flex Easy Flexitank EC41

Slides:



Advertisements
Similar presentations
GUIDELINES FOR THE PACKAGING AND TRANSPORTATION OF INSERTS & SUPPLEMENTS The printer must ensure that all inserts are free from set-off and that the ink.
Advertisements

Avoiding cuts in the kitchen …..they are no longer part of the job! Knife Sharpening using a steel.
Sectional Assembly and Installation
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Bridging the Gap Problem-Solving Pupils Version. Note to Pupils Do you know the difference between Area and Perimeter? Do you have problems knowing how.
Interior Wall and Ceiling Finish
Tent Pitching.
T-Flex Fitting Instructions 1 Rev
EDS – F1 Drink System Information
F&T Inc. OVERHEAD CRANE SAFETY.
CRIMPING Introduction
SWEDISH EMERGENCY DISASTER EQUIPMENT PREPARATION & DONNING PPE.
Cap Sewing with HCS-1201 Voyager
1 Introduction to Engineering Lab 2 – 1 Assembling the Conveyor/Sorter Agenda Goal of todays lab. Storing your teams conveyor/sorter. Tool kits. Safety.
BANANA PACKAGING FARM TO RETAIL NEXT GENERATION PACKAGING.
Selecting Multiple Commodity Codes. 30/03/ Click on STATISTICS, then BUILD YOUR OWN TABLES from the drop-down menu. 2. Click on Data by Commodity.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Expand Media Wall & Podium Case Training Video’s & Instructions.
2 Fire Fighter Qualifications and Safety Skill Drills.
Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading.
Installation. Indoor Unit Installation Typical Installation.
Market Handling Condition Study Observations of Field Condition ( Bad Practices ):- Required to do to cope up the situation:- Product is being tied very.
Materials QtyLWHDescription 28’X4’X15/16”Plywood (15/16” is also known as ¾”) 88’X2”X1”Lumber – Pine 16Home Depot 5 Gal Bucket 48’Rolls of hook and tie.
How to Make a PAPER TIGER. STEP 1: MAKE BODY TUBE 1. Use a spent engine to roll your body tube out of copier paper the short way 2. Test the size by sticking.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
How to Make a Hot Air Balloon
Pellet Dies: User Instructions Read these instructions carefully before beginning work. Read the risk assessment. If you have not used the die and hydraulic.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Installing Cable Floor Heating Systems This presentation will give you a practical idea of how to install a floor heating system.
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
STEP-BY-STEP LADDER SAFETY By Louisville Ladder Corporation.
1 DRIVERS TRAINING COURSE VEHICLE SELF RECOVERY OPERATIONS.
Presentation on Installation of a Domestic Cold Water Storage Cistern
Preparing & Exposing Photographic Silkscreens For use with Lesson 3 FOR EDUCATION USE ONLY ©2009 The Andy Warhol Museum, a museum of Carnegie Institute.
CONSTRUCTING A FIVE CABIN LATRINE
Internal Envelope Vac Bagging Findhan Strain. Split Tooling 5083 Aluminium (cost) CNC’ed Finished with 800 grit Not well polished as good surface finish.
FLEXI TANK PRESENTATION
High Pressure Lifting Bags
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman IN-VEHICLE ENGINE SERVICE 27.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Job Performance Requirement Modified Gasner Bar Pack.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
Creating a Little Book Using PowerPoint (Windows XP 2003 or above) By Pete Senske & Joan Olson.
Make a Gas Cylinder Cooker. © G. Norris 2011 Copyright This document and the information contained within is copyright to © G. Norris Reproduction.
Hand Sewing Buttons and Things.
Square Plant Stand. TOOL: Radial Arm Saw NEXT STEP: Surface Planer RESULTS: Rough size pieces for 4 Legs. 33” long PROJECT Square Plant Stand PART Legs.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
Corporate Environmental, Safety, Risk Management
VIEW SERIES with Sliding Door
Pinhole Camera.
Copyright © 2016 by The S.E.A. Group
GrainPro® TranSafeliner™
Board Replacement for Engineered Glue-Down Pattern Plus with a Premier Performance replacement board.
Global Exotics Board Replacement
Board Replacement for Floating Floors
IN-VEHICLE ENGINE SERVICE
Glue Down Lock N’ Fold Board Replacement
Product Presentation January 2010.
Performance PlusTM Hardwood
MACH 118: Lathe & Mill 1 Lathe Workholding.
GrainPro® SuperGrainbag™
GrainPro® TranSafeliner™
GrainPro® Cocoon™ Cocoon Indoor™ Doc. Code: TSD-PP008.
Shape and One Point Perspective Project
Hot-Air Balloons.
GLOVE BAGGING & PLASTICIZING
Board Replacement for Engineered Glue-Down Hardwood Floors
Presentation transcript:

E-Flex Easy Flexitank EC41 Fitting instructions E-Flex Easy Flexitank EC41 rev 01 - 7.02.2012

Ensure the containers are no older than 5 years. Ensure that only containers that have been heavy weight tested to a minimum of 28,000 kilograms are used. Ensure the containers are no older than 5 years. Ensure that containers are in excellent condition. No repair on side walls and no damages on the floor. Foodgrade containers only – free of odors. rev 01 - 17.02.2012

Sweep the container carefully with a broom. Ensure that the door bolts are silicon covered Ensure that nails and other objects that may damage/puncture the flexitank are removed. Cover potential uneven areas on the walls and on the floor with duck tape (thick tape). rev 01 - 17.02.2012

The box will be used as door protection board. DO NOT throw it away! Open the E-flex box and ensure that the following are in the package: E-flex Warning labels Two cable ties Adhesive Tape The box will be used as door protection board. DO NOT throw it away! rev 01 - 17.02.2012

Position the E-flex to the edge of the left door. Unroll the E-flex into the container. Make sure not to step on the E-flex while unrolling. Make sure not to wear shoes during the fitting operation. rev 01 - 17.02.2012

E-flex has to be fastened to the lashing rings in the container to avoid sliding during transportation.. rev 01 - 17.02.2012

BELT TYING 1 : NOSE DIRECTION Knot the belts to the lashing rings shown with the arrows at the nose side. Ensure that belts are tight and knots are fastened well. rev 01 - 17.02.2012

BELT TYING 2 : DOOR DIRECTION Repeat the same tying on the door side. rev 01 - 17.02.2012

BELT TYING 3 : rev 01 - 17.02.2012

KEEP THE PLASTIC SUPPORTED PART DOWNWARDS DOOR PROTECTION : Although 20cm free space remains between E-flex and the doors after filling, a protective operation against the sharp edges of the bolts on the doors is required. The box will be used as a door protector. Collapse the box as shown. KEEP THE PLASTIC SUPPORTED PART DOWNWARDS rev 01 - 17.02.2012

KEEP THE PLASTIC SUPPORTED PART DOWNWARDS DOOR PROTECTION : OPTION 1 If the fitting operation is being done at the filling location, place the board between the E-flex and doors. Please ensure that plastic supported area which remains between the two sides of the collapsed box, is downwards. KEEP THE PLASTIC SUPPORTED PART DOWNWARDS rev 01 - 17.02.2012

DOOR PROTECTION : OPTION 2 If the filling and fitting areas are different then please follow the below instructions. Cut the board into two pices from the joint corners. Suspend them to the door closing bars. rev 01 - 17.02.2012

Repeat the same to the door on the right. Fix the cut pieces of the board to the door by the provided adhesive tapes. Repeat the same to the door on the right. rev 01 - 17.02.2012

Fill in the provided Check List and stick it to the door on the right hand side rev 01 - 17.02.2012

WARNING: IMPROPER FITTING MAY CAUSE CAPACITY PROBLEMS, INNER LAYERS MAY GET STUCK AND STRETCH. THIS MAY CAUSE SEVERE LEAKINGS. IF FITTING OPERATION HAS BEEN PERFORMED AT ANOTHER LOCATION, PLEASE ENSURE THAT THE E-FLEX HAS NOT MOVED DURING LOCAL TRANSPORTATION. rev 01 - 17.02.2012

We have 2 or 3 inch valve alternatives. Valves have male cam-lock connection. According to your 2 or 3 inch preference you will need to have a female camlock coupling. rev 01 - 17.02.2012

READY FOR FILLING... rev 01 - 17.02.2012

Connect the hose to the valve. Make sure that protective bonnet spout is unrolled. Make sure that the hose is suspended at the top of the container by using a strap. Make sure that you have chosen a light weight filling hose. rev 01 - 17.02.2012

Start loading the E-flex. WARNING: Ensure that the start up pumping speed does not exceed 300 lt /min until the E-flex rises to an approximate height of 50cm (roughly the first 5-6,000 litres) , then increase the speed up to 600lt/min. Please ensure that the filling stations follow this instruction carefully. rev 01 - 17.02.2012

When the flexitank is loaded, remove the hose. Attach the cap of the valve and fasten it. Fasten the bonnet cover with a cable tie over the body of the valve. Twist the bonnet and make a “swan-neck” folding. Fasten with the provided second cable tie once again. rev 01 - 17.02.2012

WARNING LABELS: LEFT DOOR RIGHT DOOR LEFT WALL RIGHT WALL rev 01 - 17.02.2012

Thank you for choosing E-Flex Easy Flexitank rev 01 - 17.02.2012