North Access Building Acid Flushing and Power Failure Events 2 interacting events in which the insufficiently planned/coordinated actions to restart from.

Slides:



Advertisements
Similar presentations
Accident Investigation vs. First Report of Injury.
Advertisements

Site Safety Plans PFN ME 35B.
Emergency Preparedness and Response
Basic safety rules and procedures for controlling hazardous energy
Drill ICAM-preliminary information For information purposes only. Managers & Supervisors should evaluate this information to determine if it can be applied.
De-energization and Lockout
Safety and Health Management Program
Accident Causes, Prevention and Control
Accident Investigation State of Florida Loss Prevention Program.
Safety and Health Programs
Lockout/Tagout Authorized Employee. What Is Hazardous Energy? –Often invisible –Can be hydraulic or mechanical –Live or stored –Moving machine or equipment.
SAFETY AND HEALTH PROGRAMS 1. This presentation is adapted from the OSHA Safety and Health Programs presentation available on the OSHA website. CREDITS.
Occupational health and safety
Hazard Identification
Lockout/Tagout Affected Employees. © Business & Legal Reports, Inc Session Objectives You will be able to: Recognize hazardous energy sources Carry.
Lockout/Tagout Authorized Employee Slide Show Notes
LOCKOUT/TAGOUT ENERGY CONTROL PROGRAM
Unit #4 Establishing Committee Expectations – Safety & Health Programs 1.
Project monitoring and Control
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Working at Height Scissor lift, Boom lift and Vehicle mounted platforms Design Specifications.
Accident Analysis.
3D LEISURE - Health & Safety Refresher Training Manual.
ACCIDENT / INCIDENT REPORTING (Employee Version).
IIPP An Overview of the Injury and Illness Prevention Program.
© BLR ® —Business & Legal Resources 1501 Accident Investigation.
© BLR ® —Business & Legal Resources 1408 Lockout/Tagout Authorized Employee.
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management Lock Out Tag Out Affected Employees.
VIOLENCE AT WORK Samuel Nii Tettey (Ergonomist) 1.
Situational Awareness Airport Safety Week Case Study Situational Awareness – Case Study Location: Ramp Area Scenario  A staff member walked behind.
Module 18 National Preparedness. Postmaster, Levels Module 18Slide - 2 Facility, Personal & Vehicle Security Workroom Floor Access Keys Arrow Keys.
Module 8 Risk Management. Manager, Customer Services Module 8Slide - 2 Objective The learner will be able to: –Develop an understanding of Security Responsibility.
Lockout/tagout for authorized employee

Policies Controlling Risk
INTRODUCTION TO RADAR.
Maintaining Safety Standards
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Proper Lockout Procedure
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
Pre-Job Briefings Continuing Education First Quarter 2017 Part 1
Maintaining Safety Standards
SAFE WORK INSTRUCTIONS
CORRECTIVE MAINTENANCE (REPAIRS) MANAGEMENT
Safety rules for works supervisors
Identify hazards to the force
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
U.S.D.A. FOREST SERVICE REGION 6
The Office Procedures and Technology
High Potential Near Miss
The Great Gas Leak Incident of 2007
161 Senior Cadet Development Weekend
Dynamic Risk Assessing in an emergency environment
Regulatory Oversight of HOF in Finland
Keep away form ‘line of fire’
Accident Investigation
Safety & Health Programs
Safety & Health Programs
Active supervision Mary dowling.
Observers of the Month July 2013 Restricted.
Trending Requirements and Results
Safety & Health Programs
Safety toolbox Johnnie Stanton-MECA
ENVIRONMENTAL, HEALTH & SAFETY POLICY
Welcome back to 2016 Memory Jogger – Mobil Retail M&R Activities
Presentation transcript:

North Access Building Acid Flushing and Power Failure Events 2 interacting events in which the insufficiently planned/coordinated actions to restart from the first event caused the second event Lessons Learned/Toolbox Discussion (Adapted from W. Oren’s ENG presentation, February 2017) See Notable Event report: https://www.jlab.org/div_dept/dir_off/oa/notable/secure/NE%20Final%20ENG-17-0103.pdf

Event 1 Summary During power supply maintenance in the North Access Building, spray from a leaking acid flushing line fitting caused a power outage and a visible flash The line was about 5’ from a 480V switchboard It was 6:45 a.m. on the first day back from the Holiday break LCW lines used during acid flushing Power supplies Switchboard

Causal Factors- Event 1 Lack of sufficient supervision enforcement/oversight and proper review THA did not recognize the potential for a hose leak or recognize what could happen if one occurred. This in spite of multiple reviews by SME’s, supervision and location specific staff – safety warden There was no clear evidence that the OSP was being followed with regard to checking for leaks in the system Further observations suggested that other facets of the OSP were not being followed (lack of PPE, roping off area) OSP had been signed but was not available on site as required by ESH Manual There was no evidence that supervision was providing oversight or enforcing the use of the OSP Remember – this work involved a pre-mitigated risk code of 3, and work started at 4 am after 10 days off from work

Event 1 “Take Aways” THA’s must be appropriate & thorough (both formal and informal ones) Checklists to formulate THA’s are great, but should be used as a “crutch” to remember what to look for; not as a substitute for a thorough “what could happen if” analysis OSPs are required for tasks with pre-mitigated Risk Code 3 or 4 and must undergo a thorough review It is the reviewers responsibility to do a thorough evaluation and work with author to address issues before signoff It is the supervisors responsibility to assure workers have read, signed, and are using the OSP Work Control Documents are not “suggestions” Further, supervisors should carefully consider time of day and work week when scheduling/conducting OSP driven activities Consider: worker attention/fatigue, skills sets, availability of incident response resources, etc.

Event 2 Summary An FM&L Engineer responded to scene to investigate The engineer decided that electricians were needed to effect repairs After being informed that the ESR was down, and inferring that helium would be rapidly lost, the engineer changed the plan. New plan was to re-energize main breaker and then re-energize breakers on affected panel one at a time Decision not communicated to affected staff and access to the site of the original failure was not controlled / secured Dressed out and turned off the breakers on the affected panel; then checked the main breaker, which was in a remote location Another unexpected “flash” occurred with other staff in the vicinity of the panel

Causal Factors – Event 2 Shifting of priorities allowed schedule to take precedence over initial decision not to reenergize panel as initially planned Once the decision was made, planning for emergent work was insufficient Building was left unsecured New plan was not communicated to those affected Effect of new hazard (acid spray) was not appreciated Processes for breaker reset was ambiguous

Event 2 “Take Aways” Planning for “emergent” work in some ways is more important than the highly anticipated job A thorough “what could happen if” evaluation must be done before proceeding Use colleagues to check plans and associated hazards whenever possible Talk and Walk it through! Communications are key between: responders, bystanders, those involve in incident, etc. Preservation of an incident scene is important If startup is needed to prevent additional hazards from occurring, document the scene before proceeding Only clean up what will cause additional hazards upon restart and thoroughly evaluate the startup with all stakeholders ensuring all mitigations are in place before commencement