Associated Hazards and Safety Practices

Slides:



Advertisements
Similar presentations
Your Guide to Correct METER INSTALLATION This manual has been designed to help you install GE watthour meters quickly and easily. It provides a handy reference.
Advertisements

An Electronic Device, and also a Action Hero…
Revenue Protection & Safety Field Safety. Safety First Section 1.5 Personal Protective Equipment.
CURRENT TRANSFORMERS AND VOLTAGE TRANSFORMERS
Chapter 12 Transformers. Chapter 12 Transformers.
Thermostats. I would recommend that as you proceed through this power point presentation that you refer to your textbook, Unit 14, for some great visuals.
A/C Generator Systems.
Which type of circuit has more than one path for electricity to flow?
Register Digital Multimeter Usage Click Register to begin the course.
TEST METER OPERATION. Electrical Test Instruments Analog Or Digital Voltmeters – Measuring Potential Difference Ammeters – Measuring Current Flow – Clamp.
Electric Circuits and Power Page 706. Ohm’s Law Resistance is equal to the voltage divided by the current. Resistance = Voltage Current Ohms ( ) = Volts.
Substations. Substations Chapter 4 Substations Major types of equipment found in most transmission and distribution substations with their purpose,
7.2.4 Student Book © 2005 Propane Education & Research CouncilPage Identifying Procedures for Measuring Current Between Two Given Points in an.
 Four Components of a circuit  Power supply  Conductor  Load device  Controlling device  Power Supply  Generator  Line source (wall outlet)  Transformer.
Chapter Twenty One: Electrical Systems
Do Now Describe what you think happens electrically when you dim a light.
Electrical Power Systems
Instrument Transformers
Radian Research, Inc. Radian Research, Inc. an employee owned company Power and Energy Measurement Specialists 3852 Fortune Drive.
Connections of a CT and a PT to supply, load and relay.
Physics I Honors 1 Current and Circuits Current Physics I Honors 2 Electric Current Voltage (which indicates the presence of an electric field) causes.
The 13 Amp PLUG Fuse Insulating Casing Live Wire Neutral Cable grip Flexible Copper conductors Earth.
Concepts of Engineering and Technology Basic Electricity and Electronics: DC Circuits Copyright © Texas Education Agency, All rights reserved. 1.
Unit 13 Electric Circuits
Circuits Chapter 17.3 Notes. What are circuits? An electric circuit is a set of electrical components connected such that they provide one or more complete.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
HOUSE WIRING NOTES. Electricity  Proton – positive charge  Electron – Negative charge  Electricity = flow of electrons Conductor= electricity passes.
Field Problems with Instrument Transformer Installations
REDA Production Systems
MAHATMA GANDI INST. OF TECHNICAL EDUCATION & RESEARCH CENTRE, NAVSARI.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Instrument Transformer Electrical Measuring Instruments & Instrumentation 3rd SEMESTER ELECTRICAL ENGG.
D.C. Machine & Transformer Topic: Instrument Transformer Electrical:-1 presented by: Jill Chauhan ( ) Chirag Agarawal ( )
1 :. Introduction These are special type of transformers used for the measurement of voltage, current, power and energy. As the name suggests, these transformers.
BASIC ELECTRICITY AND MAGNETISM
Every electrical system must have three parts, a source, a load, and a circuit.  Source - the origin of electrical potential, such as a battery or 120.
Electrifying! Ken McAuliffe Chapter 30. Summary Ken McAuliffe Explains the complexities of wiring a large building for electricity. Describes how electrical.
Advanced Meter School August 18-20, 2015 INSTRUMENT TRANSFORMER SIZING 2015 David L. Johnson.
Push Button Station and Relay
Current Transformer Testing
SERIES, PARALLEL, AND SERIES-PARALLEL CIRCUITS
Starting System Circuit Operation and Testing
Current Electricity Sections 2-2 & 2-3.
Sub Station.
CHAPTER 6 SPECIAL TRANSFORMERS Electrical Machines.
Circuit Protection Unit 9.
Digital Multimeter.
3-Phase Transformer Construction, Principal, Working, Operation Advantages Over 1-Phase Transformer Introduction Advatages Construction Principal Working.
GROUND-FAULT GROUND-CHECK MONITOR
The D.C. Scout Battery Distribution System Ground Locator
Electrical Machine-I EE 2107 Dr. Md. Sherajul Islam
Ignition Systems Overview
HVI HIPOT TEST SET Pft sERIES.
Electricity.
EZCT TURNS RATIO TEST The EZCT’s use the “Voltage Method” to determine the CT Turns ratio The ideal connection is shown in this illustration.
Lesson 11: Transformer Name Plate Data and Connections
3-Phase Transformer Construction, Principal, Working, Operation Advantages Over 1-Phase Transformer Introduction Advatages Construction Principal Working.
Transformer Impedance
Flotection: Building Main Shutoff System
Meter removal and installation certification
The Safe Use of Electricity
Safety Meeting Topics Standby Generator Safety
Meter removal and installation certification
Electrical components and systems
Dominion Energy South Carolina: Solar Equipment Requirements
Presented by: HJ Arnett Industries, LLC
Presentation transcript:

Associated Hazards and Safety Practices REVENUE METERING Associated Hazards and Safety Practices

Transformer-rated Meters Application and Components Current Transformers Voltage (Potential) Transformers Transformer-rated meters are used because: Meters used directly on high voltages (over 480V) or currents (over 200A) could fail or explode.

Transformer-Rated Meters (cont.) Components Instrument transformers Test switches Transformer-rated revenue meter Transformer-rated meter base

Current Transformers For customers who use over 200 amps. Types Bar Window Switchgear Primary

Current Transformers (cont.) Ratio (Multiplier) _% of energy sent to meter. A common ratio is 200:5. This means that there is a multiplier of 40. Burden: Expressed in ohms and tells you the load on the secondary. Rate Factors: Thermal: How much the primary load current can be increased over it’s nameplate value.

Current Transformers: Nameplates Shorting Bar X1 X2 Voltage Rating Ratio Rate Factor Ratio

Current Transformers (cont.) Construction Shunting bar Primary (H1 or H2); Secondary (X1 or X2) Larger wire/few turns; smaller wire, many turns Lower current on output for meters

Current Transformers (cont.) Dangers of CT’s If you open the connections in a CT meter: The voltage across the secondary will increase rapidly toward infinity, which may cause the CT to explode. WARNING! Never open the connections in a CT meter

Current Transformers Connection Customer

Current Transformers Connection What happens when you take the meter out of the circuit? ? Customer

Current Transformers Connection A voltage is still induced onto the secondary windings of the CT. This leaves an open circuit. What happens when you take the meter out of the circuit? Customer Customer is still energized!

Current Transformers (cont.) Opening a CT Pull the meter Cut the secondary wire to meter Any way that opens the current path between the secondary of the CT to its return.

Voltage Transformers (VT or PT) Step down the primary voltage to lower levels that are safer and easier to meter. PT = VT Transformers are connected to the service voltage. Connected in parallel

Voltage Transformers (VT or PT) Typically used on systems with more than 600V. Transformers are connected to service voltage. Ratio: Percent of voltage sent to meter Burden: Expressed in VA and relates to the load on the secondary side of the potential transformers.

Voltage Transformers (cont.) Types of VTs Primary Secondary Rating VTs W= 12.5 va X = 25 va Y = 75 Z = 200 Zz = 400 M = 35

You are dealing with voltage (not current) Dangers of PTs Never shunt a PT You are dealing with voltage (not current) and you are connected in parallel (not series).

Types of Meter Bases Bypass Meter Bases Safety Sockets -energized or not? Green lever vs. red lever Jaws open but can be bypass Bypasses not designed to carry full load Cut off levers for current diversion Test switch provisions -transformer rated

Installing and Removing Meters Be safe! If hazards are present, do not work alone. When installing or removing the first priority is: ENSURING YOUR SAFETY!

Installing and Removing Meters (cont.) Never pull a meter under load. Disconnect meter by shutting off breaker. Verify that the power is disconnected at: The weatherhead. The transformer. Re-installing meter under load will cause sparking.

Installing and Removing Meters (cont.) Pulling transformer-rated meter without shunting current transformers . . . . Current transformers may explode! Customer will still be in power.

Socket Checks Determine if socket is wired correctly. Verify no backfeed or fault condition exists. Use meter socket check handout. Inspect for any missing knockouts or openings to energized equipment.

Socket Checks (cont.) Inspect for broken/misaligned socket terminals. Inspect for broken/cracked porcelain blocks. Ensure the socket base is properly secured and meter can be sealed.

Meter Installation Notify customer Use proper safety gear Socket check Visual inspection

Meter Removal A meter is not a load break tool! Deenergize the meter before pulling it. Notify customer Use proper safety gear Verify no load Visual inspection

Meter Selection Issues Typical misapplication of 5 point meter Wild leg in the wrong spot Single phase 120/240 vs120/208 (2S vs. 12S) Older 14S 240 volt meters -Actual voltage 277/480 120 volt 1S meter in a 240 volt 2S service

Detecting Current Diversions

Detecting Current Diversions

The photo on the top shows a 5-terminal lever bypass socket used with a Form 12S, 480 volt meter on 480 volt, 3 wire delta application The photo on the bottom shows the existing meter “can” retrofitted with a TS-SCB-1 block assembly and VT Pack. The VT Pack is mounted on the outsie of the socket with the CK-St-1 mounting kit.

Any Questions?