Building Committee Presentation: JUNE 12, 2012 PRELIMINARY DESIGN PROGRAM Hanson, MA | Whitman-Hanson Regional School District.

Slides:



Advertisements
Similar presentations
MACCRAY Elementary Facilities Update meeting Tuesday, June 25, Maynard Community Center, 7:00 pm Wednesday, June 26, Raymond Community Center, 7:00 pm.
Advertisements

HUGHES STADIUM ANALYSIS
Maquan Elementary School Project: JANUARY 14, 2012 BUILDING COMMITTEE PRESENTATION Hanson, MA | Whitman-Hanson Regional School District.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
Avenida La Pata/Avenida Vista Hermosa Community Park PRESENTATION TO CITY COUNCIL and PARKS AND RECREATION COMMISSION December 15, 2004.
Bronze Award: Library/Media Center
Mt. Greylock RSD Building Project Initial Community Report October 8, 2013 Rose Ellis, Superintendent 0.
Blissfield Community Schools Strategic Plan Facilities Team.
STEPHANIE LOW DEAN, CURRICULUM & INSTRUCTION CALIFORNIA COMMUNITY COLLEGES CHANCELLORS OFFICE Chancellors Office Hottest Topics: A Story About Trains 3/25/2011.
New N. Atlanta High School 4111 Northside Parkway Project Overview March 25, 2010 Facilities Services Department September 20, 2011.
City Council Presentation July 1, 2014 Parks & Recreation Master Plan.
Design Review Planning to date Project scope summary
New Elementary School Project Overview of Dept. of Ed Role  Project Review/Approval Cycle Project applications submitted to DOE – June 2004 DOE construction.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Washtenaw County Strategic Space Plan Recommendations November 1, 2006.
Long Range Plan Presented June 25, 2013 Adopted by the Board of Education: July 16, 2013.
January – May 2013 Existing Curriculum and Space Needs Summary Facilities staff meets individually with all school principals, as well as Academics and.
SCHEMATIC DESIGN PRESENTATION
WJJ Middle School Facility Study Tri Board Meeting February 5, 2015.
The Catholic Community of St. Thomas More New Building Committee.
Article 49 - Davis Field Park & Recreation Commission Town Meeting May
A Long Term Solution Oak Ridge Addition. NPD117’ s Core Values Visionary Leadership Learning-Center Education Organizational and Personal Learning Managing.
“ Let’s Bond Together ” Issue 3 Expect….Believe….Achieve.
Long Range Facility Planning assisted by Silver Falls School District.
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
Development of Secondary School Space in Grafton, MA A Review of the Process, Timing and Funding Mechanisms Expected through the Current MSBA Process January.
Building Work Committee Renovation & Expansion Project Presentation March 7, 2009 Mason School District.
1 Austin Elementary Replacement School Update March 18, 2015.
BUILDING PROJECT AND THE FEASIBILITY STUDY August 20, 2012 Wachusett Regional High School MOUNTVIEW MIDDLE SCHOOL.
The 20/20 Vision Report to the Board of Education January 2009.
Missoula County Public Schools Overview of Planning January 2014.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
More Seats for Students History of Tuckahoe Capacity and APS Actions.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Recommended Actions for Statements of Interest Prioritized by School Districts Board of Directors Meeting November 28, 2007 Treasurer Tim Cahill, Chair.
Development Committee School Usage and Building Recommendations Big Walnut School District Board of Education Meeting June 9, 2008.
Rick Wair’s Begin Here FACILITIES Condition of the Facilities Capacity of the Facilities Changing Educational Needs.
1 Needham Public Schools Space and Program Planning Task Force Report Needham Public Schools Space and Program Planning Task Force Report March 1, 2005.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
LA LEADS Summer Conference July 25, Discussion Topics GLEEM Overview Preview of Modules Region I Spotlight Training Schedule Questions and.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – June 2007 Construction Workshop 26 June 2007.
Facilities Study Committee September 20, Meeting 1 Agenda Introductions Committee Makeup Parents Staff Community Members Goal Process Middle School.
Municipal Center Needs Analysis City of New Carrollton 100% Final Report MCA # /13/2015 Introduction Needs Analysis Existing Facility Analysis Process.
Kasson City Council Public Hearing Capital Improvements Plan October 26, 2005.
Bill Requirement for Technical Assistance (4)(a)(B) – “The task force shall research and recommend to the Oregon Education Investment Board the types and.
A SPECIAL THANK YOU TO ALL WHO PARTICIPATED IN THE STUDY AND THE SURVEYS IN ORDER TO BUILD A PROPOSAL THAT BENEFITS THE STUDENTS AND COMMUNITIES OF DIGHTON-REHOBOTH.
Early Childhood Feasibility Study Presented by Early Childhood Feasibility Committee Members Eileen F. Swan, parent Amy Lupoli, parent Alisa Ruggiero,
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
District Local Planning Committee Orientation Part 2 Trimble County Schools Kentucky Department of Education Division of District Support - District Facilities.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
Community Meeting, July 18, 2016
Building Committee Update 5/21/17
Overview of MSBA Building Process and Project Timeline
Consolidated Central Office Building
Overview of MSBA Building Process and Project Timeline
Lord Tennyson Elementary School
Business System Development
Civic Center Sports Field Study Session & Quarterly Update
Designers’ Manual Overview and Chapter Contents
Kincaid Hall Renovation
Alexander Public School
Florence Roche Elementary - MSBA Process
DOVER ELEMENTARY Existing MPB (2/14/12).
Lord Tennyson Elementary School
MSBA Feasibility Funding
Chimacum District Facility & Program Plan
Bensalem Township School District Feasibility Study
Presentation transcript:

Building Committee Presentation: JUNE 12, 2012 PRELIMINARY DESIGN PROGRAM Hanson, MA | Whitman-Hanson Regional School District

Module 3 Preliminary Design Program CONTENTS 1.INTRODUCTION 2.EDUCATIONAL PROGRAM 3.INITIAL SPACE SUMMARY 4.EVALUATION OF EXISTING CONDITIONS 5.SITE DEVELOPMENT REQUIREMENTS 6.PRELIMINARY EVALUATION OF ALTERNATIVES 7.LOCAL ACTIONS AND APPROVALS APPENDIX

Module 3 Preliminary Design Program 1. INTRODUCTION 1.Overview Educational Facilities 2.Project Initiation and Statement Statement of Interest Project Team Enrollment Agreement 3.Narrative Summary of Capital Budget Statement 4.Process and Schedule Site visits Public Outreach Education Program Initial Space Summary 5.Summary of Findings, Existing Conditions Site Maquan School Indian Head School

Module 3 Preliminary Design Program 2. EDUCATIONAL PROGRAM 1.Overview Current and Proposed Educational Program Fit of Program to Physical Space 2.Educational Program 3.Functional Diagrams

Module 3 Preliminary Design Program 3. INITIAL SPACE SUMMARY 1.Overview 2.Process and Observations Overview Analysis of Existing Educational Facilities Visionary Session and Summary Findings Initial Assessment of Existing to Proposed (Matrix) 3.Initial Space Summary Summary of Differences from MSBA Template Space Summary Spreadsheets (PK-2 and PK-5)

Module 3 Preliminary Design Program 3. INITIAL SPACE SUMMARY 3.Initial Space Summary Summary of Differences from MSBA Template Pre-Kindergarten Multi Purpose Room (STEM/STEAM) Special Needs Enlarged Gym Teacher Planning / Collaboration Centers Space Summary Spreadsheets (PK-2 and PK-5) PK-2ProposedExisting 90,834 GSF74,600 GSF PK-5ProposedExisting 131,599 GSF144,490 GSF

Module 3 Preliminary Design Program 4. EXISTING CONDITIONS 1.Introduction: Summary of Property Restrictions Title and Deed Appropriateness for Development Development Restrictions Historic Restrictions (Memorial Hall) 2.Maquan Existing Conditions 3.Indian Head Existing Conditions

Module 3 Preliminary Design Program 5. Site Development Requirements 1.Introduction: Summary of Concerns 2.Site Development Requirements 3.Existing Site Plan

Module 3 Preliminary Design Program 6. Evaluation of Alternatives 1.School District Assignment Practices 2.Tuition Agreements with Adjacent School Districts 3.Rental or Acquisition of Existing Buildings 4.Construction Options Overview 5.Construction Option Narrative Descriptions 6.Construction Option Drawings 7.Option Cost Comparison 8.Options Comparison Chart 9.Base Repair Option Costs for Indian Head

Maquan PK-2: A comprehensive renovation including code required upgrades, full accessibility, and a fire suppression system. Indian Head 3-5: Targeted improvements to correct known deficiencies. Approx. Costs: $32,038,947 Total $18,291,297 Hanson share Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District Option 1 | Base Repair – Site Plan 6.Construction Option Drawings

Option 2 | Renovation and Addition to Maquan with No, or Limited Demolition – Site Plan Maquan PK-2: No / Limited Demolition Minor interior modifications Comprehensive renovation including code required upgrades, full accessibility, and a fire suppression system. New addition to meet the program requirements for Pre-K to grade 2. Approx. Costs: $34,750,899 Total $18,160,486 Hanson share Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District 6.Construction Option Drawings Exact configuration of additions to be determined New Septic Field

Option 3| PK-2, Renovation and Addition to Maquan with Partial Demolition – Site Plan Maquan PK-2: Enrollment: 395 Demolition of the 1-story core Addition of a new 2-story core, Renovation of the existing 2-story classroom wing, for Pre-K to grade 2. Approx Costs: $35,993,551 Total $18,782,420 Hanson share Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District 6.Construction Option Drawings New Septic Field

Option 3 | PK-2, Renovation and Addition to Maquan with Partial Demolition – Building Plans LOWER LEVELUPPER LEVEL Maquan Elementary School Feasibility Study Hanson, MA 6.Construction Option Drawings

Option 4A| PK-2, New 2-Story School on Maquan Site – Site Plan Maquan PK-2: Enrollment: 395 A new 2-story school building on the Maquan site for Pre-K to grade 2. Demolition of existing Maquan School. Approx. Costs: $36,454,887 Total $17,867,654 Hanson share Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District 6.Construction Option Drawings New Septic Field

Option 4A | PK-2, New 2-Story on Maquan Site – Building Plans UPPER LEVEL LOWER LEVEL Maquan Elementary School Feasibility Study Hanson, MA 6.Construction Option Drawings

Option 4B| PK-2, New 2-Story School on Maquan Site – Site Plan Maquan PK-2: Enrollment: 395 A new 2-story school building on the Maquan site for Pre-K to grade 2. Demolition of existing Maquan School Approx. Costs: $36,454,887 Total $17,867,654 Hanson Share New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District 6.Construction Option Drawings

Option 4B | PK-2, New 2-Story School on Maquan Site – Building Plans LOWER LEVEL UPPER LEVEL Maquan Elementary School Feasibility Study Hanson, MA 6.Construction Option Drawings

Option 5 | PK-5, Renovation and Addition to Indian Head with Partial Demolition – Site Plan Combined PK-5: Enrollment: 800 Demolition of the Indian Head one story wing. New 2-story additions. Targeted renovation of the existing 2-story 1951 wing. Demolition or re-purposing of Maquan School Approx. Costs: $52,751,926 Total $26,362,010 Hanson share Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District 6.Construction Option Drawings

Option 5 | PK-5, Renovation and Addition to Indian Head with Partial Demolition – Building Plan Maquan Elementary School Feasibility Study Hanson, MA LOWER LEVEL 6.Construction Option Drawings

Option 5 | PK-5, Renovation and Addition to Indian Head with Partial Demolition – Building Plans MAIN LEVEL Maquan Elementary School Feasibility Study Hanson, MA UPPER LEVEL 6.Construction Option Drawings

Option 6A | New 2-Story School on Indian Head Site – Site Plan Combined PK-5: Enrollment: 800 A new 2-story building for Pre-K to grade 5 on the Indian Head site. Demolition or re-purposing of Maquan and Indian Head Schools Approx. Costs: $53,149,800 Total $26,529,668 Hanson share Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District 6.Construction Option Drawings

Option 6A | New 2-Story School on Indian Head Site – Building Plans UPPER LEVEL Maquan Elementary School Feasibility Study Hanson, MA LOWER LEVEL 6.Construction Option Drawings

Option 6B | New 2-Story School on Maquan Site- Site Plan Combined PK-5: Enrollment: 800 A new 2-story building for Pre-K to grade 5 on the Maquan site. Demolition of Maquan School and demolition of re-purposing of Indian Head School Approx. Costs: $53,149,800 Total $26,529,668 Hanson share Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District 6.Construction Option Drawings New Septic Field

Option 6B | New 2-Story School on Maquan Site – Building Plans UPPER LEVEL Maquan Elementary School Feasibility Study Hanson, MA LOWER LEVEL 6.Construction Option Drawings

Module 3 Preliminary Design Program 6. Evaluation of Alternatives 7.Option Cost Comparison OptionTotal CostHanson Cost 6New School at Indian Head$53,149,800$26,529,668 or Maquan, PK-5 2Add. Reno. Maquan$34,750,899$18,160,486 (no demo) (Not Including Indian Head Repairs) 4New school at Maquan$36,454,887$17,867,654 PK-2 (Not Including Indian Head Repairs) 3Add. Reno. Maquan$35,993,511$18,782,420 (partial demo) (Not Including Indian Head Repairs) 5Add. Reno. Indian Head$52,751,926$26,362,010 (partial demo) PK-5 1Base Repair$32,028,947$18,291,297 2(Not Including Indian Head Repairs)

Module 3 Preliminary Design Program MOVING FORWARD TO DO FOR MODULE 3.1: Narrow Options to 3 and complete Executive Summary Local Action Certification TO DO FOR MODULE 3.2: Joint Meeting with Selectmen and Historic Commission regarding Memorial Hall Community Outreach as Defined by Town/District Recreational Department Meeting(s) Identify Preferred Solution (July 17-24) Determine Funding Needed for Survey, Traffic, Hazmat and Soils TO DO FOR MODULE 4: Seek Town Funding Approval for Site Exploration at October Town Meeting

Thank You