Best Practices for SF6 Leak Reduction At Consolidated Edison Co. Of NY

Slides:



Advertisements
Similar presentations
Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project.
Advertisements

PSE&G Condition-Based Maintenance
Mitigation Strategies What and Why?. What is mitigation? To decrease force or intensity. To lower risk. Earthquake mitigation Flood mitigation Climate.
Implementation and Management of Leak Detection and Repair Programs – New Rules and Other Considerations Nebraska Ethanol Safety & Environmental Coalition.
1Last Updated: October, 2011 Overview for Distribution Companies Reducing Emissions Increasing Efficiency Maximizing Profits U.S. Environmental Protection.
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
1 Reforming the Energy Vision (REV) “Utility of the Future” Tom Mimnagh Consolidated Edison Co of New York New York Energy Week April 23, 2015.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
CXS490 Carbon Dioxide Systems
NiSource Pipeline Group Natural Gas Star Experience Presented at the Natural Gas Star Users Conference June 3, 2003 By Gregory Lago NiSource EH&S Group.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
1 Developed by U.S. Environmental Protection Agency (U.S. EPA) January 2014 Setting up a Sustainable National GHG Inventory Management System.
6 November 2013 Created for IEA Conference Presented by: M. Cristina Ferrari NAVFAC SW Environmental Program Manager Naval Facilities Engineering Command.
AIR POLLUTION PREVENTION AND CONTROL
EPA Natural Gas Star Natural Gas Distribution Merrillville, IN June 3, 2003.
Best Operating Practices For Reducing Emissions From Natural Gas STAR Partners NiSource and EPA’s Natural Gas STAR Program June 3, 2003.
© 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Wildfires, Vegetation Management and Powerlines Presented to Senator.
1 Proposed Regulation for Reducing Sulfur Hexafluoride Emissions from Gas Insulated Switchgear California Air Resources Board February 25, 2010.
Greenhouse Gas Inventory and Reporting at SLAC National Accelerator Laboratory Kirk Stoddard Air Quality Program Manager June 3, 2009.
California Energy Efficiency Policy and Goals Beena Morar Southern California Edison June 14, 2016.
TOP Practices in Post Award Administration
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
Irvine Ranch Water District Distributed Energy Storage Case Study
Energy Management System (EnMS) Awareness
Optum DTR Process Overview
U.S. Environmental Protection Agency Natural Gas STAR Program
INSULATION FOR INDUSTRY AND HOUSING
CIRCUIT BREAKER presented by: M Aamir sohail khan & sufyan saleem Dept, of electrical engineering bahaudain.
The Presidents Climate Commitment at DMACC
U.S. Environmental Protection Agency Natural Gas STAR Program
Industrial Assessment Center Database
RETAP Retired Engineer Technical Assistance Program
Update on the Greenhouse Gas Reporting Program: Electrical Transmission and Distribution Equipment Stephanie N. Bogle, PhD U.S. Environmental Protection.
Insulating Gas Management Program
Nameplate Adjustments
DILO Company Inc. Zero Emissions. No Substitutes. Corey Ratza Cell#:
SF6 Leak Repair Case Study ConEd West 49th Street GIS Jonathan Brengel, ConEd Liisa Colby, The Colt Group.
Monitoring, Reporting, and Reducing SF6 Emissions from the U. S
2018 Adopted Budget February Financial Plan
Recent Plastic Fusion Orders
Reduce Distribution System Pressure
TEAM UP! FOR STEAM AND CONDENSATE PIPING SYSTEMS SAVINGS
SF6 Management Challenges Version 2016 & Beyond
Corporate Responsibility Org Chart
Methane Emission Standards for Crude Oil and Natural Gas Facilities
Do’s and Don'ts of SF6Gas Handling
SF6 Reporting Challenges
Island Energy Advisory Committee Board
Irvine Smart Grid Demonstration Distribution Volt / Var Control
CORPORATE RESPONSIBILITY STEERING COMMITTEE
Principles of Natural Gas
Motor Vehicle Emissions
Response of California Utilities to SF6 Emission Regulations
Motor Vehicle Emissions
Voluntary SF6 Emission Reduction Partnership: Recent Achievements and Planned Activities Volha Roshchanka 14 November, 2018.
Carbon Performance & Measurement:
AGA Operations Conference
SWITCH GEAR AND PROTECTION(IV-1) TOPIC-CIRCUIT BREAKER
CIRCUIT BREAKER presented by: M Aamir sohail khan & sufyan saleem Dept, of electrical engineering bahaudain.
Its strengths, your benefits
Meeting the challenge: Electrification and Climate Change
Voluntary SF6 Emission Reduction Partnership: Program Update
The Impact of SF6 Regulations
g3 Alternative Gas Solutions
Nameplate Adjustments
GHG Management for Small Businesses
Presentation transcript:

Best Practices for SF6 Leak Reduction At Consolidated Edison Co. Of NY Patrick Di Lillo Technical Specialist

Agenda Con Edison Overview SF6 Background Information Current/Emerging Regulation USEPA Partnership SF6 Emissions at Con Edison Addressing the Leaks Moving Forward

Con Edison

Con Edison Electrical System Overview Con Edison of New York Con Edison Electrical System Overview 3.2 million electric customers 660 square miles 13,322 MW peak load 94,000 miles of underground cable 36,000 miles of overhead cable 101 Substations 39 transmission 62 distribution ~210,000 lbs. of SF6

SF6 Background Information Effective insulating and arc-extinguishing medium Highly efficient in transmission and distribution equipment and switchgear Chemically inert, high thermal stability, non-flammable/ non-toxic Allows for small station footprint in urban area SF6 is a greenhouse gas with a global warming potential (GWP) 22,800 times that of carbon dioxide (CO2) Extremely long atmospheric lifetime of up to 3,200 years Currently no viable alternative to SF6 Kapiteleinführung

Current/Emerging Regulation No US EPA or NYSDEC mandated SF6 reduction regulation in effect Both the California Air Resources Board (CARB) and Massachusetts Department of Environmental Protection (MassDEP) have already instituted regulatory constraints for SF6 reduction Kapiteleinführung

USEPA SF6 Emission Reduction Partnership for Electric Power Systems Since 1999, members of the U.S. electric power industry and the US EPA have been voluntarily working together to reduce SF6 emissions and share information 90% decrease in SF6 emissions since 1999 95% decrease in emissions rate since inception Since 2011, we have additionally been mandated to report all of our Greenhouse Gas Emissions (including SF6) through the US EPA Greenhouse Gas Reporting Program (GHGRP).

Con Edison Historical SF6 Emissions (lbs.)

Con Edison Historical SF6 Emission Rate 6.03%

7.5% emissions rate of Nameplate Capacity SF6 Emissions 2014-2016 7.5% emissions rate of Nameplate Capacity

Addressing the Leaks Established the Fix-It-Now (FIN) Team Cross-Organizational Effort Substation Operations, Engineering, System Operations & EH&S Improve the Timeliness & Effectiveness of SF6 Repairs Prioritize & develop a plan of action for top leakers Focused systematic approach to repairs Identify Leak – Plan Work – Repair – Test – Document Ensure quality of work and documentation Establish method for forecasting gas calls Centrally Institute Best Practices Repair tools, practices and ePLAN Templates Procedures and training SF6 inventory control and tracking

 Addressing the Leaks Minimize Number of Samples ZERO Purge SF6 Analysis Previously emitted 2 lbs per sample 500-700 lbs released per year New DILO SF6 gas analyzers Improved Tool for Leak Detection State of the Art FLIR GF306 SF6 Camera 

Addressing the Leaks Heighten Sensitivity Associated with SF6 Leaks VP Communication Transparent Maximo Reports Closely monitor reported SF6 fills through daily gas call reports Aid in monitoring the quality of data entered

Moving Forward Nameplate Capacity Accuracy Corrected Nameplate Capacity New Requirements for Nameplate Capacity Continue Temporary Leak Repair Composite wrap Colt Clamps Permanent Repairs Eliminate centralized gas fill system Remove clamps on leaking welds and re-weld/repair (outage required) NDE testing on patches/welds that aren’t clamped to identify possible future leak areas Replace temporary bypass piping clamps with stainless tubing and DILO self-sealing fittings

Moving Forward Continue to Leverage Capital Programs SF6 Peer Team Circuit Breaker Reliability Program SF6 GIS Bus Overhauls Automatic Ground Switch Retirements GIS Replacements SF6 Peer Team SSO/EH&S-Air/Chem Lab/Engineering/TLC Monthly meetings to keep lines of communication open Maintain focus, identify and work through issues together Implement New Technology with R&D GIS phase-isolated continuous pressure monitoring GIS bus epoxy coating Heat shrink wrap technology(EPRI researching application)

Moving Forward Refine SF6 Gas Procedures and Practices Guidance presently being provided through Engineering Test Letters Document best practices in Smart Procedures, ePLAN Templates, Standard Maximo Job Plans Improve block training, supervisor training and refresher training

Questions? Patrick Di Lillo Technical Specialist Consolidated Edison Co. Of NY