Product Support Considerations

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements

JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
JHP Case Study Exercise 1 UNCLASSIFIED notional data for notional program.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
OASD Logistics and Materiel Readiness
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
Life Cycle Logistics.
1 Workshop Schedule Welcome and Workshop Overview International Acquisition & Exportability (IA&E) Fundamentals Break
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
Business, Cost Estimating & Financial Management Considerations
Integration of DTM “Reliability Planning, Analysis, Tracking and Reporting” into LOG 103 and other DAU Life Cycle Logistics Learning Assets.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Contracting (Product) Considerations
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Lesson 9 Production and Deployment (P&D) Exercise Team #
Milestone A to Milestone B Requirements Management Activities
Materiel Solution Analysis (MSA) Phase
Milestone A to Milestone B Requirements Management Activities
Production Considerations
Milestone A to Milestone B Requirements Management Activities
Lesson 9 Production and Deployment (P&D) Exercise Team #
ISA 201 Intermediate Information Systems Acquisition
DAG CH 3 Figure 11: Weapon System Development Life Cycle
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
ISA 201 Intermediate Information Systems Acquisition
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
A B C Solution Analysis Technology Maturation & Risk Reduction
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Adjustments required for program or funding changes Options
DAG CH 3 Figure 18: Weapon System Development Life Cycle
International Acquisition and Exportability (IA&E) Considerations
DAG CH 3 Figure 28: Weapon System Development Life Cycle
c EMD Focus Plan to define product support package & supply chain
Product Support Strategy
AOFR: Assessment of Operational Field Readiness
Fielding plan details and adjustments
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Fielding plan details and adjustments
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
Technology Maturation & Manufacturing Development Phase
8 Tech Processes Drive Acquisition
Training: An Element of Integrated Product Support
The Department of Defense Acquisition Process
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Product Support Considerations CPD B A C MDD FRP/FD Decision Dev RFP Release Decision IOC Materiel Solution Analysis FOC Technology Maturation & Risk Reduction Production & Deployment Engineering & Manufacturing Development LRIP Decision ILA/IOT&E Operations & Support ICD Draft CDD PDR CDR FOT&E EOA/ILA ILA/OA EOA Product Support Considerations PS Activities Logistics trade studies /market research incorporated in AoA ID support & MX concepts/technologies ID initial PS metrics ID PS risks/cost drivers Develop mx planning & management requirements Support initial RAM-C Rationale Report Develop PS inputs to IMS Develop draft LCSP Identify TMRR AS PS risk/ opportunities Update LCSP Identify EMD AS PS risk/ opportunities Design for supportability Develop initial disposal strategy Develop fielding strategy Core, 50/50, and DSOR/SOR evaluation Evaluate 12 IPS elements for inclusion in RFP Develop IP strategy Update PS IMS Conduct ILA Support RAM-C Performance metrics identified Identify Production/ Sustainment AS PS risk/ opportunities Develop MX plan Execute PS related DT&E/OA Validate MX & training procedures/publications Develop training plan Develop & procure training equipment Complete provisioning analysis Design for supportability evaluate as part of CDR Spectrum supportability determined Maintenance tasks identified Create manning billets PSI determined Complete ILA Refine performance metrics Update Sustainment AS PS risk/ opportunities Complete supportability demonstration Complete IOT&E Complete performance based agreements Update PS BCA Update maintenance plan Complete SVR and PCA Verify maintenance & training procedures/publications Ensure PHS&T compliance Initiate initial operational deployment Execute supportability metrics tracking and analysis System fielding completed Execute obsolescence/ capability improvement modifications Execute/update training program Complete FOT&E Trades Studies may include: Training Systems Requirements Analysis Training Situation Analysis Manpower Estimates Economic Analysis Documentation and Reviews Acquisition Strategy Draft CDD Initial inputs to PPP, SEP, TEMP, & LCSP Inputs to RFP ASR System specification Update LCSP Initial interface control documents Update PS risk assessment PDR, ILA System and product specifications LCSP Reliability Growth Plans Interface control documents Disposal Plan Update LCCE FMECA CDR, SVR/FCA, ILA Update Disposal Plan PCA, PIR Obsolescence studies/reports DMSMS reports ISR

AS: Acquisition Strategy ASR: Alternative Systems Review CDD: Capability Development Document CDR: Critical Design Review CPD: Capability Production Document CONOPs: Concept of Operations DSOR: Depot Source of Repair EOA: Early Operational Assessment FMECA: Failure Modes Effects Criticality Analysis FOC: Final Operational Capability FOT&E: Follow-on Test & Evaluation ICD: Initial Capabilities Document ID: Identify ILA: Independent Logistics Assessment IMS: Integrated Master Schedule PHS&T: Package Handling Storage and Transportation PIR: Post-implementation Review PPP: Program Protection Plan PS: Product Support RAM-C: Reliability, Availability, & Maintainability – Cost SVR: System Verification Review SEP: System Engineering Plan SFR: System Functional Review SOR: Source of Repair SVR/FCA: System Verification Review/ Functional Configuration Audit TEMP: Test and Evaluation Master Plan TRA: Technology Readiness Assessment TRR: Test Readiness Review TSFD: Technology Security & Foreign Disclosure IOC: Initial Operational Capability IOT&E: Initial Operational Test & Evaluation IP: Intellectual Property IPS: Integrated Product Support ISR: In Service Review LCCE: Life Cycle Cost Estimate LCSP: Life-Cycle Sustainment Plan MDD: Materiel Development Decision MX: Maintenance OA: Operational assessment OMS/MP: Operational Mode Summary/Mission Profile OTRR: Operational Test Readiness Review PCA: Physical Configuration Audit PDR: Preliminary Design Review