Adjustments required for program or funding changes Options

Slides:



Advertisements
Similar presentations

Advertisements

 Project Title: Sustainable Manufacturing Metrics Accurately Define and Reflect Sustainable Values  Project Team: Academia, Industry, NGO  Goal Statement:
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
DAU Update International Acquisition for FIPT November 17, 2014 DT Tripp Chair, International Programs Department Defense Systems Management College Defense.
JHP Case Study Exercise 1 UNCLASSIFIED notional data for notional program.
What are MRLs ? Alfred W. Clark Dawnbreaker, Inc.
OASD Logistics and Materiel Readiness
OASD Logistics and Materiel Readiness
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Life Cycle Logistics.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
Transforming the Way We Work Jill Garcia Defense Acquisition University 29 October 2004 Logistics Community of Practice Knowledge Sharing Initiatives Knowledge.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
Business, Cost Estimating & Financial Management Considerations
PRODUCTION/ DEPLOYMENT
Integration of DTM “Reliability Planning, Analysis, Tracking and Reporting” into LOG 103 and other DAU Life Cycle Logistics Learning Assets.
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Contracting (Product) Considerations
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Competitive Prototyping – the New Reality
Technology Readiness Levels
Roadmap for Lean Manufacturing Presented by Joseph B
Green Supply Chain Management
DAU Hot Topics Forum February 15, 2017
Production Considerations
ISA 201 Intermediate Information Systems Acquisition
Product Support Strategy Demonstrated Performance
DAG CH 3 Figure 11: Weapon System Development Life Cycle
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
DAU Hot Topics Forum February 15, 2017
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
ISA 201 Intermediate Information Systems Acquisition
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
Range Cost Estimates Estimating Accuracy Trumpet
Cloud in a Rack Tuan Tran 10 March 2016
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
A B C Solution Analysis Technology Maturation & Risk Reduction
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
DAG CH 3 Figure 18: Weapon System Development Life Cycle
International Acquisition and Exportability (IA&E) Considerations
DAG CH 3 Figure 28: Weapon System Development Life Cycle
c EMD Focus Plan to define product support package & supply chain
Product Support Strategy
International Acquisition
Fielding plan details and adjustments
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Fielding plan details and adjustments
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
Industrial Base Analysis and Sustainment (IBAS) Program Overview
Technology Maturation & Manufacturing Development Phase
Product Support Strategy Demonstrated Performance
The MDAP Process MDAP Process Price Fighters Services Concept Refinement System Development & Demonstration Production & Deployment Operations.
The Department of Defense Acquisition Process
Perspectives on Transforming DT and OT Industry-Government Roundtable
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Adjustments required for program or funding changes Options Acquisition Sustainment B C Operations & Support Technology Maturation and Risk Reduction Engineering and Manufacturing Development Production & Deployment FRP FOC Materiel Solution Analysis Post IOC Reviews A Fielding plans adjusted Metrics tracked & adjustment plans established LCSP Focus Sustaining Engineering processes for refining product support package elements Logistics assessments on how the system and supply chain are performing Adjustments required for program or funding changes Options