1 Incorporating Extreme Weather Risks in Asset Management Planning Lynn Clarkowski.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

Understanding Student Learning Objectives (S.L.O.s)
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Advanced Piloting Cruise Plot.
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
County of Fairfax, Virginia Department of Transportation Transportation Funding Alternatives and Outreach Board Transportation Committee June 12, 2012.
The Implementation Structure DG AGRI, October 2005
1. 2 Why are Result & Impact Indicators Needed? To better understand the positive/negative results of EC aid. The main questions are: 1.What change is.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
Program Goals, Objectives and Performance Indicators A guide for grant and program development 3/2/2014 | Illinois Criminal Justice Information Authority.
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Putting the Pieces Together to Achieve Sustainability Cindy Carlsson Minnesota Department of Transportation March 1, 2011.
1 Innovative Tools October 27, 2011 Chi Mai. 2 Presentation Overview VISSIM Corridors VISSIM Protocol Hours of Congestion.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Year 6 mental test 5 second questions
ZMQS ZMQS
Guidance on New CEs Emergency Repair Projects Operational Right-of-Way Limited Federal Funds EUM – March questions to:
Minnesota Port and Waterway Security Working Group Meeting April 12, 2012.
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
© Tarek Hegazy – 1 Basics of Asset Management Prof. Tarek Hegazy.
Richmond House, Liverpool (1) 26 th January 2004.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
EMS Checklist (ISO model)
Bridge Owners Forum Code of Practice for Bridge Management Research Opportunities Graham Cole s.
Chapter 5 – Enterprise Analysis
2009 Strategic Planning playbook
Integrated Approach to Area Master Planning in Jubail Industrial City
Effectively applying ISO9001:2000 clauses 6 and 7.
ABC Technology Project
Journey Management Nigel DAth Journey Manager Bay of Plenty RTIM Seminar 18 March 2014.
/1 Transparency Challenge Panel March / Welcome & Introductions Suzanne Wise Strategy Consultation Overview of responses and next steps.
VOORBLAD.
Environmental Management Systems Refresher
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
Weekly Attendance by Class w/e 6 th September 2013.
Teacher Evaluation System LSKD Site Administrator Training August 6, 2014.
CTS Strategic Roadmap Walkthrough, v1.2 Dan Mercer.
1.  FHWA Climate Change Resilience Program ◦ Assessment Framework ◦ Transportation Vulnerability  Flash Flood Vulnerability project ◦ Background ◦ Objectives.
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
Duane Hill, District Engineer
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
NCHRP 07-21: Asset Management Guidance for Traffic Control Devices, Barriers, and Lighting 2014 ATSIP Annual Meeting Presented by Nancy Lefler Vanasse.
TAM ETG Webinar #3 Network Life Cycle Analysis Part 1: Introduction and Overview Wednesday, July 8,
U.S Department of Transportation Federal Highway Administration Federal Transit Administration Performance Management and Performance-Based Planning and.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Ohio Transportation Planning Conference July 16, 2014.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Mark Nelson, Program Manager for Statewide Planning and Data Analysis TRB International Partnership Meeting January 14, 2015.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
MnDOT Flash Flood Vulnerability and Adaptation Assessment Pilot Project January 2015.
FACS-STIP Tool – Overview (Features, Attributes & Conditions Survey – Statewide Transportation Improvement Program) April 2010 Presentation for Roadway.
97 th Annual Purdue Road School Presented by: Katie Zimmerman, P.E. Applied Pavement Technology Transportation Asset Management.
Insert the title of your presentation here Presented by Name Here Job Title - Date How can we make London’s transport network resilient to climate change?
 SCDOT has over 41,000 miles of pavements and over 8,400 bridges.  4 th largest state maintained system in the country.  Started working on the TAMP.
Incorporating Extreme Weather Risks in Asset Management Planning
Minnesota’s Transportation Asset Management Efforts
Presentation transcript:

1 Incorporating Extreme Weather Risks in Asset Management Planning Lynn Clarkowski

2 What is a Transportation Asset Mgmt Plan (TAMP)? A tool used to manage an organization's infrastructure and other assets with the objective of delivering an agreed upon standard of service Establishes a consistent and transparent statewide approach to planning, programming, and managing physical assets

3 Benefits of a TAMP? Lays out the process of how to best manage the highway pavements, bridges & other physical assets for the long term Resource allocation decisions are based on data and analysis –Consideration of engineering, life-cycle cost, and risk analysis with investment strategies Improved coordination between maintenance, preservations, and capital programs

4 Key MAP-21 Components of TAMP Asset Inventory/Conditions Objectives/Measures Performance Gap Assessment Lifecycle Cost Risk Analysis Financial Plan Investment Strategies

5 FHWA Asset Management Plan Pilot Project Support three state DOTs developing their first TAMP –Develop TAMP Work Plan Working with FHWA & MnDOT consultants Minnesota New York Louisiana

6 Asset Management Plan Scope Pavement Bridge Drainage Structures Guardrails Traffic Signals Signs Overhead Sign Structures Pavement Markings ITS Pedestrian Ramps Lighting Tower Lighting Land Rest Areas Sidewalks Retaining Walls Tunnels Noise Barrier Fencing Weigh Stations ADA Infrastructure Modal Infrastructure Transit Vehicles Highway Assets

7 MnDOTs TAMP Progress Asset inventory & condition collected for all four asset categories Life-cycle cost analysis complete Risk assessment complete –Workshop on November 15 to discuss mitigation strategies, costs, and risk impact Financial investment strategies & performance targets –Workshop on November 15 will also include discussion of financial plan elements

8 Describe lifecycle costs & why they are important Illustrate a typical deterioration model Describe strategies for managing assets over their whole life Contrast lifecycle costs for different strategies Document the lifecycle cost of adding a new lane Life-Cycle Cost

9 Pavement LCCA Results

10 Working Groups Identified Risks –Impacts to Asset, Users, MnDOT –Consequence & Likelihood –Mitigation Strategies & Gaps Workshop (9/20) Focus on Undermanaged Risks Comparative Prioritization Exercise Risk Assessment

11 Few Very High Risk areas Top (Prioritized) Undermanaged Risks – Inability to appropriately manage culverts – Not meeting public expectations for local/corridor level pavement quality/condition – Tunnel and culvert failure or collapse – Premature deterioration of a bridge Risk Results

12 MnDOTs Flash Flood Vulnerability and Adaptation Assessment Pilot Project in NE & SE Minnesota

13 Project Background Minnesota GO Vision & Statewide Multimodal Transportation Plan identified the risk of flash flooding as a result of changing precipitation patterns due to climate change. Minnesota GO Vision & Statewide Multimodal Transportation Plan identified the risk of flash flooding as a result of changing precipitation patterns due to climate change. From 1958 to 2011, the Midwest has seen 45% increase in very heavy precipitation (NOAA) From 1958 to 2011, the Midwest has seen 45% increase in very heavy precipitation (NOAA)

14

15

16 What happened?

17 Trunk Highway 210 East Park Entrance Jay Cooke17

18 Hwy 2 and 35 Proctor (near Duluth) 18

19 Project Objectives Better understand the trunk highway networks risk from flash flooding Better understand the trunk highway networks risk from flash flooding Identify cost-effect options to improve the networks resiliency Identify cost-effect options to improve the networks resiliency Support the development of Minnesotas first Transportation Asset Management Plan (TAMP) Support the development of Minnesotas first Transportation Asset Management Plan (TAMP) Provide feedback to FHWA on the Draft Framework Provide feedback to FHWA on the Draft Framework

20 Climate Change & Extreme Weather Vulnerability Assessment Framework A guide for transportation agencies to assess vulnerability to climate change and extreme weather events 3 key steps: 1.Define study assets and climate variables 2.Assess vulnerability 3.Incorporate results into decision making

21 Project Overview General systems-level vulnerability assessment of the trunk highway network in each districtGeneral systems-level vulnerability assessment of the trunk highway network in each district Timeline: September 2013 – February/March 2014 – Inform and supplement TAMP risk assessment Focused adaptation assessment for specific high- risk facilities identified in the system-level assessmentFocused adaptation assessment for specific high- risk facilities identified in the system-level assessment March 2014 – June/July 2014

22 Defining Vulnerability Climate change vulnerability in the transportation context is a function of a transportation systems exposure to climate effects, sensitivity to climate effects, and adaptive capacity. (Vulnerability Framework)

23

24 Culvert Capacity Risk Mitigation Strategies: Culvert Capacity Risk Mitigation Strategies: –Check culvert capacity during all capital improvement projects, upsize when needed, and stop practice of replacing in kind w/o analysis. –Identify future projects in advance to do hydraulic analysis, purchase ROW, and obtain permits. Shelf ready means incorporation of fixes in short timeframe. Linking TAMP Risk Results and Adaptability to Climate Change

25 Culvert Failure/Collapse Risk Mitigation Strategies: Culvert Failure/Collapse Risk Mitigation Strategies: –Develop & implement system condition performance measure for replacement or repair of poor and very poor culverts –Culverts in poor and very poor condition are prioritized and replaced in construction/maintenance projects Linking TAMP Risk Results and Adaptability to Climate Change

26 Key Dates for the TAMP December 2013 – Expected Federal Rulemaking for Asset Management April Submittal of Draft TAMP to FHWA as part of pilot project October MAP 21 Deadline for Federally Approved TAMP