Status of Hydrogen System Development

Slides:



Advertisements
Similar presentations
1 CM24 – 2 nd June 2009 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Hydrogen R&D system HAZOP
Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen R&D System Operational Procedures and Test Plan M Courthold.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
MICE hydrogen review Commissioning, testing and operations.
1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
Provisional Hydrogen System Control Sequence TW Bradshaw Y Ivanyushenkov D Baynham MJD Courthold.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
MICE Hazard Overview and Analysis Elwyn Baynham Tom Bradshaw Yury Ivanyushenkov.
MICE Safety Review Process and Schedule Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov Columbia Meeting June 2003.
CM26 – 26 th March 2010 Step IV: Liquid Hydrogen Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
1 Hydrogen Safety System Summary MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
1 MICE hydrogen system layout. 2 MICE hydrogen system layout (2)
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
A presentation at the MICE Video Conference on Wednesday the 5 th of May 2004 Response to the Safety review comments by Wing Lau -- Oxford.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Hydrogen system status Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE Hydrogen System MICE Collaboration Meeting, CERN, 29 March-2 April 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
MICE hydrogen review System modifications. Relief circuit repair During leak testing of R&D tests, the insulating vacuum would not go lower than
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Meeting October 2004 – Coseners House.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
The MICE Hydrogen System Summary Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford Appleton Laboratory.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
1 Liquid Hydrogen R&D test report Video Conference – 23/08/12 S Watson P Warburton M Courthold.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
1 Preparation of the hydrogen test system Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones CCLRC Technology.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
The MICE Hydrogen System Safety Review Introduction Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford.
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Collaboration Meeting RAL October 2004.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Progress on Hydrogen R&D System
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
Progress on Hydrogen R&D System Yury Ivanyushenkov on behalf of Elwyn Baynham, Tom Bradshaw, Mike Courthold Matthew Hills, Tony Jones MICE Collaboration.
1 Liquid Hydrogen R&D test report CM34 – 17/10/12 S Watson P Warburton M Courthold.
1 Liquid Hydrogen update CM33 S Watson P Warburton M Courthold.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
1 MICE Hydrogen system Working group mtg – 01/09/14.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
S A Griffiths CM42 June 2015 Electrical & Control.
Hydrogen System Update
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Absorber progress MICE-ISIS review of the liquid hydrogen system will be held in early January; guidance from Nominated Engineers on the imported absorber.
Proximity Cryogenics P&IDs Meeting
MICE Meeting at RAL, Oct-23, 2005
On the Ground Muon Ionisation Cooling Experiment ( MICE ) – pre-cursor to a neutrino factory.
Proximity Cryogenics P&IDs meeting
MICE Safety Review Meeting 4th Oct 2011 PJ Warburton - Daresbury Lab
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Cryogenic System Commissioning Summary Report
Discussion on MERIT Cryogenics Specifications
Presentation transcript:

Status of Hydrogen System Development Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold, Matthew Hills, Tony Jones Applied Science Division, Engineering and Instrumentation Department RAL MICE Collaboration Meeting, Frascati, June 26-29, 2005

- process and instrumentation diagram (PID) - layout Hydrogen R&D: Scope Hydrogen system: - principal points - process and instrumentation diagram (PID) - layout Hydrogen R&D: - motivation and scope - work packages - components Plans

Conceptual points Individual hydrogen system for each of 3 absorbers. Use of a metal hydride bed for hydrogen storage. Compact location of the components under hydrogen extraction hood close to the absorber.

MICE hydrogen system layout: Principle Argon jacketing of pipework is proposed in outside the hood. Basic philosophy is shown below: H2sensor Hood Argon Jacketing 1m3 Cabinet for hydride bed and pipework MICE Safety area

MICE hydrogen system (familiar sketch) High level vent High level vent Vent outside flame arrester Non return valve Vent manifold Vent manifold 0.1 bar Hydrogen zone 2 H2Detector Extract hood VP2 P PV8 P1 Metal Hydride storage unit (20m3 capacity) P PV7 P PV2 PV1 1 bar Chiller/Heater Unit Buffer vessel Tbed Hydrogen supply PV3 1 m3 PV4 P P Fill valve Pre-cooling Out In HV1 P2 P 0.5 bar Liquid level gauge 0.9 bar P3 HV2 P P Internal Window P P P Purge valve LH2 absorber H2 Detector Safety windows Vacuum Purge valve HV3 Vacuum vessel 0.9 bar Nitrogen supply Helium supply PV6 0.5 bar VP1 Pressure gauge P P Pressure regulator Pressure relief valve Non-return valve Valve Bursting disk VP Vacuum pump

MICE hydrogen system PID

MICE hydrogen system layout

MICE hydrogen system layout (2)

Hydrogen system development: Scope To construct a prototype hydrogen handling system at RAL which will become the first full system of MICE This will consist of 2 main parts The external system – which will be in the final form to deliver H2 to the absorber and store the H2 in the hydride beds The safety system to vent H2 in failure modes- to include relief valves and buffer volume The dummy absorber The absorber will be simulated by a simple cryostat with a containment vessel to contain 20 litres of H2 – operated from a condensing pot with a cryocooler

Hydrogen system development: Scope (2) The development programme will address the following issues: Confirm the working parameters of a hydride bed in the regimes of storage, absorption and desorption of hydrogen ? Purity of hydrogen and effects of impurities. Hydride bed heating/ cooling power requirements. Instrumentation and control required for the operation of the system Safety aspects including - safety relief valves, sensors and interlocks and safety documentation The R&D programme will enable the final design for the MICE hydrogen system to be confirmed and the HAZOP to be completed.

Hydrogen system R&D: Work packages WP1 Initial design -> Internal safety review WP2 Detailed design and procurement WP3 Installation and commissioning WP4 Test Programme

Hydrogen system R&D: WP1 Initial Design H2 handling system Confirmation of components on H2 circuit diagram pipe sizes, mass flows, pressure drops, relief valve specifications, venting, manifolding vacuum and purging systems layouts in hall H2 zones basic specifications for purchased items

Hydrogen system R&D: WP1 (2) Initial Design Dummy absorber Cryostat design H2 containment vessel, condensing pot, internal pipework components Pre - cooling – heat exchanger etc Heater for load simulation and H2 boil off Instrumentation Data acquisition Outline definition of test programme and proposals for fault condition simulation

Hydrogen system R&D: WP1 Conclusion of WP1 Update cost estimates for main components Internal Engineering and Safety Review - Aim will be confirm the scope of the R&D programme and release the stage of WP2 – detailed design and procurement

Hydrogen system test rig Pressure gauge Non-return valve P VP Vacuum pump Bursting disk relief valve Valve regulator Coolant Out In Test absorber assembly Metal Hydride storage unit (20m3 capacity) Purge valve 0.5 bar 0.9 bar H2 Detector VP1 VP2 Chiller/Heater Unit 1 bar Helium supply Hydrogen supply High level vent Buffer vessel Vent outside flame arrester Extract hood H2Detector Nitrogen supply 1 m3 Hydrogen zone 2 Vent manifold P1 PV1 PV7 PV8 PV2 PV3 PV4 HV1 Fill valve Tbed HV2 HV3 P3 P2 PV6 Non return 0.1 bar Hydrogen system test rig Mass spectrometer M. F.M. Mass flow meter Tchill

Hydrogen test cryostat: Concept Instrumentation mimics what we will need on the absorber for the control system and interlocks Heater will regulate temperature of cryocooler – need redundancy and interlock with compressor Dia.Reservoir =height=290mm T H T H

Hydrogen Test Cryostat Outline 1120 Ø 580

Hydrogen test cryostat Condenser LH2 dummy absorber Level sensors Cryocooler SRDK-415 1.5 W @4.2K 35/45 W @50K Radiation shield Hydrogen inlet and outlet He inlet and outlet Cu bottom plate with heat exchanger

Hydrogen test cryostat (2) Cu bottom plate with heat exchanger Cartridge heaters Finned top plate of condenser

Capacitance-based level sensors (2 or even 3) Instrumentation Capacitance-based level sensors (2 or even 3) (communicating with a supplier concerning choice of a sensor) Temperature sensors (PRTs) (standard components of any cryogenic system) Cartridge heaters (standard components)

Initial control sequence diagrams have been developed Control system Initial control sequence diagrams have been developed (example) Will be revised and completed Talking to ISIS and DL experts on hardware implementation

Provisional Hydrogen System Control Sequence Control logic – Fill Sequence Chiller on Set Tchill = Tchill_initial Start PV1,2,3,4 closed VP1 on, PV6 Open Cooling system On Start Pressure Control Loop Start Vac Monitor Open Pv1,Pv2 Tbed<Tbed1 And P3<1.e-5 P1Pset1 Close PV1,PV2 Stop Pressure Control Loop Set Tchill = Tchill_low Open PV3 Hlevel>Hlevel1 H2 System Ready Increment/Decrement Tchill Empty Sequence Vac monitor Pressure Control Yes No

Status: Metal hydride tank Table 1 The specification of the MH tank for RAL   Hydrogen Storage Capacity 20 Nm3 Tank Description: Heat Transfer Medium Water MH Weight 155kg Tank Total Weight 220 Kg Operating Condition: Charging Gas Component Hydrogen of 99.99% purity Charging Gas Pressure 1.2 barA Hydrogen Charging Rate 70NL/min (up to 90% of Storage Capacity) Discharging Gas Pressure 1.2 barA Hydrogen Discharging Rate 70NL/min Utility Requirements: Cooling Medium Water Below -10℃ (At 20L/min) Heating Medium Above 20℃ (At 20L/min) Status: Waiting for a new quotation from the supplier

Hydrogen R&D: Layout

Hydrogen R&D: Phase I initial

Hydrogen R&D: Phase I initial (2)

Hydrogen R&D: Phase I final

Hydrogen R&D: Phase I final (2)

Hydrogen system R&D – Schedule Outline Schedule WP1 Initial design: May – August 05 with Review in September 05 WP2 Detailed design and procurement: Aug 05 – Feb 06 WP3 Installation and commissioning: Jan – April 06 WP4 Test Programme: June – Oct 06